Vishnu KAUSHIK, PMP® PRINCE2®
Planner at Altrad Services APAC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Hindi Full professional proficiency
-
English Full professional proficiency
Topline Score
Bio
Credentials
-
Advanced Primavera P6
LinkedInJun, 2023- Oct, 2024 -
Construction Management: Planning and Scheduling
LinkedInJun, 2023- Oct, 2024 -
Primavera P6 Essential Training
LinkedInJun, 2023- Oct, 2024 -
Project Management Foundations: Budgets
LinkedInJun, 2023- Oct, 2024 -
Project Management Foundations: Risk
LinkedInJun, 2023- Oct, 2024 -
Project Management Skills for Leaders
LinkedInJun, 2023- Oct, 2024 -
Safety Access the Rail Corridor
Rail Industry Worker (RIW)Oct, 2021- Oct, 2024 -
Construction Induction White card
SafeWork NSWSep, 2021- Oct, 2024 -
Skills Worker
Rail Industry Worker (RIW)Sep, 2021- Oct, 2024 -
PRINCE2® Foundation and Practitioner Certification Training
AXELOS Global Best PracticeApr, 2021- Oct, 2024 -
Emotional Intelligence
RMIT UniversityAug, 2020- Oct, 2024 -
Resilience and Adaptability
RMIT UniversityAug, 2020- Oct, 2024 -
CPCM
The World Bank GroupSep, 2020- Oct, 2024 -
Project Management Professional (PMP)®
Project Management InstituteDec, 2020- Oct, 2024 -
Aspen Certified User in Aspen Capital Cost Estimator
Aspen TechnologyJul, 2020- Oct, 2024 -
Member
Project Management InstituteApr, 2020- Oct, 2024
Experience
-
Altrad Services APAC
-
Australia
-
Oil and Gas
-
100 - 200 Employee
-
Planner
-
Nov 2022 - Present
-
-
-
Enigma Interconnect
-
Canada
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Planner and Scheduler
-
Mar 2022 - Nov 2022
Prepare monthly, weekly, fortnight reports, bar chart, resource histogram & production dashboard. Also, identify and resolve problems related to inventory. ▪ Prepare the scheduled usage of production to ensure optimal production levels. ▪ Prepare monthly, weekly, fortnight reports, bar chart, resource histogram & production dashboard. Also, identify and resolve problems related to inventory. ▪ Liaises with key subcontract partners to integrate their detailed schedule with the trade schedules. Develop detailed production schedule using Primavera project planning tool. Moreover, Monitor and update all the production schedule in collaboration with functional managers, production managers and lead hands. ▪ Evaluate supplies or quality, timeliness, and match according to goals. ▪ Monitoring material supply flow and identify any shortages or bottlenecks in usage. ▪ Forecasting the market challenges based on competitor analysis and industry trends. ▪ Coordinating with various stakeholders to ensure that activities are implemented in accordance with plans, designs, and specifications. ▪ Identify and resolve problems relating to inventory. Address issues regarding quality and production. Also, manage deadlines based on production expectations. Show less
-
-
-
Aambianz Pty Ltd
-
Australia
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
May 2019 - Mar 2022
Job Profile ▪ Prepared various levels of schedules (L2, L3, and L4) and master schedule, various graphs on the dashboard, progress plan Vs actual curves (S-Curve). ▪ Coordinated and administered construction engineering activities to ensure that projects are implemented in accordance with plans, designs, and specifications. ▪ Developed WBS and Critical Path Method logic diagram using Primavera in collaboration with the project team, management, and project leaders. ▪ Monitored and updated schedules and prepared catch-up plans for slipped activities, and prepared ETC using the Earned Value Management technique. ▪ Monitored and updated all the work packages in collaboration with functional managers, project leaders and sub-contractor. ▪ Prepared monthly, weekly, fortnight reports, bar chart, resource histogram & project dashboard. Also, responsible for site supervision of projects. Show less
-
-
-
Regal Enterprises
-
Jamnagar, Gujarat, India
-
Sr. Project Planning Engineer (Mechanical)
-
Nov 2017 - Feb 2019
Job Profile: • Responsible for material, expediting, coordination, monitoring, preparation of a progress report & follow up. Preparation of Target Stock Availability Date (TSAD) schedule. • Prepare & implement the Project Execution Plan (PEP) & schedules at various levels & monitoring the work plan through Primavera. Analyze Schedule, Cost & Technical performance of the project using the Earned value management technique. • Preparation of Planning Package & Project Progress Measuring System. Preparation of Daily, Weekly, & Monthly reports. Preparation of Equipment mobilization plan & Histograms. Allocation & monitoring the Resources for efficient utilization. • Prepare 6 Month Forecast Plan for Manpower & Equipment as per the current status of the project. Monitoring activities on the critical path and near critical activities. • Analyzing exertion power deployment, facility draft, production plans & costs to control the ideal workers. Responsible to confirm the project of mechanical tools, machines, constituents, product for production plants & methods for the project. • Responsible to direct the looking after of stand buildings & synchronizing supplies for innovative projects, analyses & preservation plans. • Responsible to establish criteria & procedures for setting up, an amendment, quality control, inspection, testing, commissioning & upholding the rendering of production ideologies. • Responsible to confirm the project of mechanical tools, machines, constituents, products for production plant & methods for the project. Assisting in inspecting the plant to ensure optimum performance was to be maintained. Show less
-
-
-
Alruqee Group
-
Saudi Arabia
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Planning Engineer
-
Dec 2016 - Oct 2017
Job Profile: • Responsible to confirm the project of mechanical tools, machines, constituents, products for production plant & methods for the project. Assisting in inspecting the plant to ensure optimum performance was to be maintained. • Prepare & implement Project Execution Plan (PEP) & schedules at various levels & monitoring the work plan through Primavera. Analyze Schedule, Cost & Technical performance of the project using the Earned value management technique. • Preparation of Planning Package & Project Progress Measuring System. Preparation of Daily, Weekly, & Monthly reports. Preparation of Equipment mobilization plan & Histograms. Allocation & monitoring the Resources for efficient utilization. • Prepare 6 Month Forecast Plan for Manpower & Equipment as per current status of the project. • Monitoring activities on the critical path and near critical activities. • Responsible to confirm the project of mechanical tools, machines, constituents, products for production plant & methods for the project. • Responsible to direct the looking after of stand buildings & synchronizing supplies for innovative projects, analyses & preservation plans. • Responsible to establish criteria & procedures for setting up, an amendment, quality control, inspection, testing, commissioning & upholding the rendering of production ideologies & safety procedures. • Responsible to confirm the project of mechanical tools, machines, constituents, products for production plant & methods for the project. Assisting in inspecting the plant to ensure optimum performance was to be maintained. Show less
-
-
-
Reliance Industries Limited
-
India
-
Oil and Gas
-
700 & Above Employee
-
Project Engineer
-
Nov 2013 - Nov 2016
• Preparation of schedules at various levels and monitoring the work plan through Primavera/Microsoft Project Planner. Prepare 6 Month Forecast Plan for Manpower & Equipment as per the status of the project. • Preparation of the Planning Package and Project Progress Measuring System. Preparation of Daily, Weekly, and Monthly Reports. • Analyze Schedule, Cost & Technical performance of the project using the Earned value management technique. Develop & maintain project Risk register. • Monitoring activities on the critical path and near critical activities, Prepare a recovery plan to catch up on slipped activities. • Preparation of Manpower & Equipment mobilization plan and Histograms. Allocation & monitoring the resources in coordination with the execution team. • Provide necessary inputs and close coordination with the cost control department to ensure that project activities are within budget. • Preparing & developing conditions for production & responsible equipment, tools, piping, measurements & draft of plants & methods. • Preparation of organizational charts & project statistics to control utilities and duties of workers & work entities and to categorize areas of recurrence. • Responsible to create work extant plans & evaluate work illustrations to build up principles for labor deployment. Analyzing exertion power deployment, facility draft, production plans & costs to control the ideal workers. • Responsible to establish criteria & procedures for setting up, an amendment, quality control, inspection, testing, commissioning & upholding the rendering of production ideologies & safety procedures. Assisting in look over the plant to guarantee to maintain optimal presentation. Show less
-
-
-
Hetvi Brass Industry
-
Jamnagar, Gujarat, India
-
Planning Engineer (Mechanical)
-
Jun 2009 - Oct 2013
Job Profile: • Preparation of schedules at various levels and monitoring the work plan through Primavera/Microsoft Project Planner. • Preparation of organization charts and project information to determine functions and responsibilities of workers and work units and to identify areas of repetition. • Responsible to establish work measurement programs and analyze work samples to develop standards for labor utilization. • Preparing & developing specifications for the manufacturer and determining materials, equipment, piping, material flows, capacities and layout of plant and systems. • Responsible to establish standards & policies for installation, modification, quality control, inspection, testing, commissioning & maintenance according to engineering. • Responsible to direct the maintenance of plant buildings & equipment & coordinating the requirements for new designs, surveys and maintenance schedules. • Responsible for achieving project targets from welding and sheet metal shop having capacity of TIG (GTAW) welding, MIG(GMAW) welding, ARC (SMAW) welding. • Execution of the Drawings as per the client requirement and preparing the schedule & ensure the review of the same to achieve pre set project targets. • BOQ Formation, Bill Making and cross checking the bills submitted by the vendors. Drawing clarification and coordinating with the design department. Show less
-
-
Education
-
RMIT University
Master of Project Management, Engineering -
Sikkim Manipal University - Distance Education
Master of Business Administration - MBA, Operations Management -
Krishna Institute of Engineering & Technology
Bachelor of Technology - BTech, Mechanical Engineering