Experience

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Senior Quality Engineer
      • Jan 2019 - Present

    • Senior Quality Engineer
      • Jan 2019 - Jan 2019

    • Australia
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • SR.ENGINEER
      • Mar 2018 - Present
    • Sr. Mechanical Engineer
      • Jan 2017 - Aug 2017

      Execute Fabrication and Erection of Off site Piping,all around U/G Piping as CRWS, WDK, WF, as a Sr. Executive Mechanical Engineer different kinds of piping as Carbon Steel, Alloy Steel,Carbon Steel (LTCS), Stainless Steel Fabrication and Erection its NDT like R/T,MPT,Hydro test,Pneumatic test, Vacuum test of Tanks bottom welding joints Underground and Above ground piping. , Flair replacement, Furnace tube Replacements as P91, P11, P12, and P5 Materials,TA with shut down job done Bundle tube replacement and hydro jetting fin fan and heat ex-changer, Columns, try to be Replacements. Heavy Equipment and erection heat ex-changer, Pump, KOD, in CDU/VDU area (Crude Distillation unit, Vacuum Distillation unit) P91, P22, P11 Alloy steel ,Boiler Piping, steam gas piping, Plant air piping, Instrument air piping, Nitrogen Piping, Utility Piping etc. Fabrication of Supports and spool as Saddle, Tunion and installed in HF, AG, AI, and Steam line., Turnaround job in DCU, CDU & VDU maintenance of Heat ex-changers, Columns, Vessels Internal job, Heater coil replacement, Burner replacement, Cock Drum Internal Welding, Thickness survey, Modification of Injection water line, Pumps replacements, cooling fans, chillers, Conveyors, Spring supports, saddle supports Maintenance job and other jobs.Tower (Washing tower ), remove all type of tray (bubble cap,valve ,sieve tray). Heat Exchangers with it all type shell and tube plate (Fixed tube,floating head , u tube… etc).Pressure vessel (vertical, horizontal) replacement of valves (Gate, Globe, check, Ball, Butterfly, Plug valves) Show less

    • India
    • Construction
    • 700 & Above Employee
    • Executive Mechanical Engineer
      • Jul 2014 - Jan 2017

      Working as Engineer -PIPING & Structure for the work of piping Fabrication & Erection. • Coordinate the execution team & Sub contractor • Project Supervision & Control. • Various type of pipes fabricated like that CS, LTCS, SS(304,304L,316,316L), AS (P11, P91, P5, P22), NACE, CS IBR . • Study of GA drawings & P&ID, marking plan and fabrication interpretation with respect to job specification and codes.follow up withvendors & subcontractor for daily work management. • Coordinated with all internal depts. to complete the activity as per planned target date, Co-ordination with client, Engineering Contractors, Construction Contractors & commissioning group. • Planning of Manpower and machineries to achieve targets on time. • Coordination with Client to solve site issues and to achieve targets. • Adapted safety standards and achieved accident free work site. • Installation and commissioning of various types of piping/structure as well as conducting tests & inspections to ensure operational effectiveness. • Reviewing engineering drawings, technical specifications, cost estimates for installation & commissioning of the equipment; reviewing & analyzing contractor's change order proposals & submittals. • Performing Isometric study and implementing the same. • Efficiently restructuring the Isometric Drawing of Fabrication Spools. • Checking the Piping erection and alignment & planning the erection materials as per the requirement. • Entrusted for small bore piping & clearing of isometrics-mach. Show less

    • Oil and Gas
    • 300 - 400 Employee
    • Mechanical Engineer
      • Aug 2011 - Jul 2014

      I have done Firefighting, WCR, WCS, CBD,OS,NG,HDPE,HP STEAM,LP STEAM & SPIKLER SYSTEM IN TRASFORMER UG & AG piping job fabrication, Erection & commissioning of Integrated Utilities & Offsite Area Piping, Co-ordination with client & PMC for Fabrication & Erection/Lowering, Co-ordination with client and PMC for Inspection, Monitoring of Daily/Weekly & month look ahead job planning & Execute. • Installation and commissioning of various types of piping/structure as well as conducting tests & inspections to ensure operational effectiveness. • Reviewing engineering drawings, technical specifications, cost estimates for installation & commissioning of the equipment; reviewing & analyzing contractor's change order proposals & submittals. • Performing Isometric study and implementing the same. • Efficiently restructuring the Isometric Drawing of Fabrication Spools. • Checking the Piping erection and alignment & planning the erection materials as per the requirement. • Entrusted for small bore piping & clearing of isometrics-mach. • Responsible for formulating loop files/test packs & punch list liquidation. • Handling the box-up, Piping spec-ASTM/ASME/API, Piping components: inch-meter, inch-dia. • Looking after the Data management for the perusal of the organization. • Handling the responsibility of progress report monitoring. • Formulating plans for the overall engineering activities at the site. • Taking care of spool storage, retrieval P & ID. • Thoroughly studying the piping front availability & looking after the Pipe supports-types and standards. • Implementing safety parameters & looking after the Rigging and safety mechanism. Show less

Education

  • Uttar Pradesh Technical University
    Bachelor's degree, Mechanical Engineering
    2007 - 2011
  • U.P Board
    XII- STD from Ordinance Factory School from U.P Board, Mathematics and Computer Science
    2006 - 2006
  • Ordinance Factory School from U.P Board in 2004.
    X- STD, Maths And Science
    2004 - 2004