Vipin Kumar

Facilities (Engineeing) Controller at Etihad Rail DB
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Delhi, India, IN
Languages
  • Hindi Native or bilingual proficiency
  • English Full professional proficiency
  • Punjabi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

During his stint at Gurgaon Rapid metro, Vipin was involved in supervising the remaining construction/installation work along with Operation and maintenance of the Metro system, i had to interect with him regarding as built and other drawings pertaining to electrical installations and i can vouch that he gave his 100% to both tasks and achieved remarkable success in his endeavours there. A Competent, Capable and Knowledgeable guy who has got excellent supervisory skills. i recommend him and wish him good luck for his future.

LinkedIn User

Vipin has good knowledge of metro systems thanks to his long stint in Delhi metro and Gurgaon metro. He gives his 100% to the task at hand. totally recommended!!

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Assessor in work environment
    Highfield Awarding Body for Compliance
    Sep, 2022
    - Nov, 2024

Experience

    • United Arab Emirates
    • Rail Transportation
    • 200 - 300 Employee
    • Facilities (Engineeing) Controller
      • Sep 2015 - Present

      • Control and monitoring of line side railway equipments on SCADA e.g Signalling system, Communication systems, Power supply systems, HVAC, CCTV and Access control systems. • Speedy Restoration of Power supply in case of power failure. • Recording every fault in Fault Management System (SAP) and taking follow ups with the concerned department for its rectification. • Analysing weather reports and sending alerts to concerned team for necessary action to avoid negative effects on personal or railway system operation. • Coordinate and keep the Supervisors, Manager, Train Controller informed in the event of a failure. • Remote Technical support and monitoring of the people working on line side locations. • Access control of railway buildings along the line. • Coordinating with outside agencies e.g. ADDC for power supply, Police for security incidents, Ambulance and civil services etc. . Show less

    • Truck Transportation
    • 1 - 100 Employee
    • TRACTION POWER CONTROLLER
      • Mar 2014 - Aug 2015

      • Speedy Restoration of 11KV and 750V in case of any kind of failure. • High, standard of safety, reliability, availability of the system. • Remote Technical support for the people working in the other locations. • Monitor and control of power network and traction power supply feed from substation (11KV and 750VDC). • Prepare Reports of Daily shift progress, Power Blocks, emergency blocks, Supply Failure record, staff movement record. • Coordinate and keep the Superiors, Chief Controller, Train Controller, and Other controller informed in the event of a failure and during the take-over and hand-over of the shift charge, start-up and shut-down of service each day. • Liaise between the operations team and maintenance staff management in respect to safety or service related failures and incidents. • To perform shift and emergency duties when required • Collecting disturbing record from SCADA. • Knowledge about (Overview) SCADA System.. Show less

    • Railroad Equipment Manufacturing
    • 700 & Above Employee
    • Traction Power Controller
      • Aug 2013 - Feb 2014

      TRACTION POWER CONTROLLER • Speedy Restoration of 66KV, 25KV and 33KV in case of any kind of failure. • High, standard of safety, reliability, availability of the system. • Remote Technical support for the people working in the other locations. • Monitor and control of power network and traction power supply feed from substation (66KV, 33KV, 25KV & 440VAC). • Prepare Reports of Daily shift progress, Power Blocks, emergency blocks, Supply Failure record, staff movement record. • Coordinate and keep the OCC Manager, Chief Controller, Train Controller, and Other controller informed in the event of a failure and during the take-over and hand-over of the shift charge, start-up and shut-down of service each day. • Liaise between the operations team and maintenance staff management in respect to safety or service related failures and incidents. • To ensure operation of Tunnel Ventilation Fans during Operation, Maintenance hour and emergency condition by coordinating with environment controller. • Control of engineering activities requiring special trains like RRV & CMV during Emergency condition, track possessions, temporary isolation of equipment etc. • To perform shift and emergency duties when required. Show less

    • Project Supervisor
      • Jan 2011 - Jul 2013

      Traction Power Controller • Speedy Restoration of 66KV, 25KV and 33KV in case of any kind of failure. • High, standard of safety, reliability, availability of the system. • Remote Technical support for the people working in the other locations. • Monitor and control of power network and traction power supply feed from substation (66KV, 33KV, 25KV & 440VAC). • Prepare Reports of Daily shift progress, Power Blocks, emergency blocks, Supply Failure record, staff movement record. • Coordinate and keep the OCC Manager, Chief Controller, Train Controller, and Other controller informed in the event of a failure and during the take-over and hand-over of the shift charge, start-up and shut-down of service each day. • Liaison between the operations team and maintenance staff management in respect to safety or service related failures and incidents. • To ensure operation of Tunnel Ventilation Fans during Operation, Maintenance hour and emergency condition by coordinating with environment controller. • Control of engineering activities requiring special trains like RRV & CMV during Emergency condition, track possessions, temporary isolation of equipment etc. OHE • Speedy Restoration of 25KV flexible or rigid OHE system in case of any kind of breakdwon. • High, standard of safety, reliability, availability of the system. • Remote Technical support for the people working in the other locations. • Got attended, left over points of the project by contractor. • Supervision of the work done by the contractor. • Carry out modifications in existing design. • Training of the newly recruited staff. RSS • Liason with contractors for left over points, spares and DLP. • Periodic Maintenance & Operation of 66/33/25 KV GIS Breaker’s/Panels along with 66/33kV, 66/25kV & 33/0.415kV transformers at Receiving Station. • Routine Maintenance of Battery Bank, ACDB & DCDB & LT Panel Gas Flooding system. • Preparing of maintenance program & staff shift duty roaster. Show less

    • Junior Engineer
      • Aug 2009 - Jan 2011

      • Responsible for breakdown & maintenance of 11 kv & 33 kv power distribution system in Greater Noida for client Noida Power Company Ltd. • 33/11 KV Substation, Distribution Transformer, Circuit Breakers, Isolators Testing, Commissioning and Maintenance. • Responsible for breakdown & maintenance of 11 kv & 33 kv power distribution system in Greater Noida for client Noida Power Company Ltd. • 33/11 KV Substation, Distribution Transformer, Circuit Breakers, Isolators Testing, Commissioning and Maintenance.

Community

You need to have a working account to view this content. Click here to join now