Vipin Gautam

Senior Engineer at Vishvaraj Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Moradabad, Uttar Pradesh, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Environmental Services
    • 300 - 400 Employee
    • Senior Engineer
      • Apr 2023 - Present

      Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank 3. Pipe line HDPE 4. Pump House Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank 3. Pipe line HDPE 4. Pump House

    • India
    • Executive Offices
    • 700 & Above Employee
    • Project Engineer
      • May 2022 - Apr 2023

      Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank 3. Pipe line HDPE 4. Pump House Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank 3. Pipe line HDPE 4. Pump House

    • India
    • Construction
    • 700 & Above Employee
    • Assistant Engineer-Execution
      • Sep 2021 - May 2022

      Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank (75KL TO 450KL) 3. Pipe line (63MM to 250MM)HDPE 4. Pump House 5. Borewell 6. Staffquater etc Construction of Various Structure 1. Boundary wall 2. Over head Storage Tank (75KL TO 450KL) 3. Pipe line (63MM to 250MM)HDPE 4. Pump House 5. Borewell 6. Staffquater etc

    • India
    • Construction
    • 700 & Above Employee
    • QA/QC Engineer
      • Dec 2019 - Aug 2021

      Construction of various structure 1. Over head Storage Tank (300KL,450KL,600KL) 2. HDPE Pile Line (63mm to 280mm) 3. MS Pipe Line (450mm to 1250mm) 4. DI Pipe Line (300mm) 5. Pump House 6. Staffquater 7. Thrustblock construction etc work. Construction of various structure 1. Over head Storage Tank (300KL,450KL,600KL) 2. HDPE Pile Line (63mm to 280mm) 3. MS Pipe Line (450mm to 1250mm) 4. DI Pipe Line (300mm) 5. Pump House 6. Staffquater 7. Thrustblock construction etc work.

    • India
    • Construction
    • 1 - 100 Employee
    • Assistant Engineer-Execution
      • Dec 2017 - Dec 2019

      Construction of Various Structure 1. Building work 2. RCC road 3. Flooring Work 4. Precast Drain 5. Pedestal with Anchor Bolt 6. Cooling system 7. Pump House 8. STP Tank 9. ETP Tank 10. Harvesting Pit 11. Boundary wall 12. Diesel Tank etc Construction of Various Structure 1. Building work 2. RCC road 3. Flooring Work 4. Precast Drain 5. Pedestal with Anchor Bolt 6. Cooling system 7. Pump House 8. STP Tank 9. ETP Tank 10. Harvesting Pit 11. Boundary wall 12. Diesel Tank etc

Education

  • IFTM University, Moradabad
    B.Tech, Civil Engineering
    2012 - 2016

Community

You need to have a working account to view this content. Click here to join now