Vinodh Pichumani
Project Engineer at COSCO SHIPPING Heavy Transport- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Tamil Native or bilingual proficiency
-
Dutch Elementary proficiency
Topline Score
Bio
Experience
-
COSCO SHIPPING Heavy Transport
-
Netherlands
-
Oil and Gas
-
1 - 100 Employee
-
Project Engineer
-
Dec 2021 - Present
-
-
-
H2M Offshore Accommodations
-
Netherlands
-
Construction
-
1 - 100 Employee
-
Product Engineer/Project engineer
-
Jun 2019 - Dec 2021
Product engineer: - H2M modules are intended for global market. As a product engineer, one of major my responsibilities is finding the compliance of H2M modules with various shipping classification society such as American Bureau of Shipping (ABS) , Det Norske Veritas (DNV) , Russian Maritime Register of Shipping (RS). - Played a vital role in obtaining ABS Product Design Assessment certificate for H2M modules. This require technical research according to ABS guidelines, coordinating and maintaining regular communication with ABS officials, suitable subcontractors and supplier in structural, electrical, piping, fire and safety aspects. Project engineer: Drawing production drawings, layout and viable stacking arrangement of H2M modules on offshore vessels using AutoCAD LT. - Maintaining the cost effectiveness of the project using SAP Business one, includes Request For Quotation (RFQ), Purchase Order ( PO), Goods received receipt. - Inspecting production of the modules in production yards as per the design. Show less
-
-
-
-
R&D engineer
-
Feb 2019 - Jan 2021
- As a R&D engineer (part time), I am responsible for hydrodynamic analysis of the SUS concept. SUS (Sit Up System): An innovative system to install Offshore wind farm in cost effective manner. - As a R&D engineer (part time), I am responsible for hydrodynamic analysis of the SUS concept. SUS (Sit Up System): An innovative system to install Offshore wind farm in cost effective manner.
-
-
-
Delmar Systems
-
United States
-
Oil and Gas
-
100 - 200 Employee
-
Project engineer
-
Jul 2018 - Jan 2019
- As a project engineer my role involved in mooring layout (2D), 3D modeling of anchors and mooring components, production and site verification of the anchors, fatigue and dimension tolerance analysis of the anchor as specified by the DNVGL and ABS standard. - As a project engineer my role involved in mooring layout (2D), 3D modeling of anchors and mooring components, production and site verification of the anchors, fatigue and dimension tolerance analysis of the anchor as specified by the DNVGL and ABS standard.
-
-
-
Damen
-
Netherlands
-
Shipbuilding
-
700 & Above Employee
-
Graduate Student Researcher
-
Jun 2016 - Oct 2017
Research topic: 'Prediction of added resistance in waves for Wind Assisted Sailing Propulsion (WASP)' In this project, I analyzed various theoretical model for predicting added resistance in heel and leeway conditions and came up with a novel numerical model. For validating the said model, I used numerical analysis modules of ANSYS AQWA and Octopus office. Using MATLAB, final results was verified with other theoretical methods. Validation of the numerical results conformed well with the experimental data obtained in TUDelft towing tank. Show less
-
-
-
-
Procurement Engineer
-
Mar 2014 - Jul 2014
Project scope: 'Well excavation and distribution system for Amar Seva Sangam.' Highlights: - Designed the structure of well and layout of distribution system using AutoCAD(2012). -Performed a detailed structural analysis for service reservivor capacity of 60000L using STAAD.Pro. - Prepared an estimate for entire water supply project to Amar Seva Sangam. - Single handedly planned the inventories such as types of pipes required and type of joints to be used in order to achieve proper flow. Show less
-
-
-
The Indian Hume Pipe Co. Ltd.
-
India
-
Civil Engineering
-
300 - 400 Employee
-
Site Engineer
-
Jul 2012 - Nov 2013
Project scope: 'Planning and execution of the Combined Water Supply Scheme for a mass community’. Highlights: - Supervised the construction of 13 infiltration wells and connecting main pipeline. - Inspected ductile iron pumping main pipeline which includes laying, jointing and testing of pipeline. - Ensured the distribution of water to panchayats and rural habituation of total population of around 50000 people. - Managed the cash flow and finished the project within scheduled time. Show less
-
-
Education
-
Delft University of Technology
Master's degree, Offshore and Dredging engineering -
Anna University
Bachelor's degree, Civil Engineering