Vinod Kumar Jaroli

Head - ESPT and Asset Optimization at Hindustan Zinc Limited
  • Claim this Profile
Contact Information
Location
Chittorgarh, Rajasthan, India, IN

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • India
    • Mining
    • 300 - 400 Employee
    • Head - ESPT and Asset Optimization
      • Feb 2023 - Present

      Handling Engineering and Planning of 6*80 MW Captive thermal unit

    • Manger- Centre of Excellence - AO, Quality,Digitalisation and Innovation for Power Business
      • Apr 2022 - Present

      Leading additional Quality,digitalisation and innovation function for overall power business which includes Quality management in Labs, Supplier quality management and supplier rationalisation, Capturing voice of customer and signing Service leve agreement with customer, COPQ calculation and reduction plan,robust process to minimise quality deviation, recording of Raw material, In process and output product quality parameters digitali and trend analysis for the same such as Osi- Pi,MIA etc.Innovation implementation in power plants to reduce down time, proper raw material usage and reduction of carbon foot print by alternate fuel induction. Show less

    • Deputy Manager- Asset Optimization ,Power Business
      • Jun 2021 - Mar 2022

      Leading Asset Optimization across 6 Unit of 91.5 MW each (Total 549 MW) Captive power plant at three location Chanderia,Dariba and Zawar. Focus on Long term strategy and driving Capex for sustainence, Critical Asset identification and tactics development, Cost conversation and reduction plan,Process excellence, Reliability Centered Maintenance, Hydrocarbon Management,Total Productive maintenance,Work management,Contion monitoring, defect elimination, Continuous improvement through Focusses Improvement projects/Kaizen/SGA by employee engagement,SAP PM and MM module etc. Show less

    • Deputy Manager & Lead - Wind and Solar Power Plant
      • Oct 2017 - May 2021

      Ownership of 273.5 MW Wind power project installation in 5 different states Rajastan, Gujarat, Maharashtra, Karnataka and Tamilnadu of 1400 CR. Capex.Yearly revenue of 180 Cr. through power sales to DISCOMs by PPAs. Active Memeber of Indian Wind Powe association,part of regulatory policy checking and correct with other investors.Complete take care of legal aspects with DISCOMs and Recovery of amount from DISCOMs and IREDA.Installation and Commissioning of 41 MW solar power project of Hindustan Zinc Limited in Roof top and Ground mounted mode, utilisation of waste dump of Smelter and Mines for installation of solar project by special design effort and saving of fertile land.Gold standard registeration of renewable power projects and Generation of carbon credits. Show less

    • Associate Manager & Lead Switch yard,Cell house and Melting Casting
      • Apr 2014 - Sep 2017

      Leading of 132 KV switchyard consisting of 17 bays which includes 4 power incoming bays from CPP and state DISCOM, 8 load centre bays of Power transformer- 4 no. (25/30 MVA) and Rectifier transformer- 4 no. (64 MVA), 4 bays of capacitor bank (29/37 MVAR) and One bus coupler. Total load flow handle around 235 MW.Complete Operation and Maintenance of switchyard which consist of Regular maintenance, periodic testing, material planning,load management and shift planning.Maintenance of 250 KTPA cell house which designed by outotech and consist of Kunz Cranes,Cathode stripping machines and Anode washing and flattening machines.Total planning of spares and alternate vendor development for reduction of maintenance cost and regular focus on MTBF improvement and MTTR reduction.Hand on experience of ABB Rectifier maintenance and upgradation from PSR to PEC,Siemens,ABB and Yashkava drives,EOTs ,HT and LT panels.Experience on Zinc Melting furnace of 24 MTPH and Casting line, Zamak alloy furnace and associated line.Energy management and Energy conservation. Show less

    • Engineer - Roaster & Leaching
      • Aug 2009 - Mar 2014

      Handling day to day activities of 40 TPH roaster and 250 KTPA capacity leaching and purification plants, DCS,SCADA and PLC operation, Troubleshooting of HT and LT drives, Debottleneck project,Energy MIS and Energy saving initiative