Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer
      • Oct 2014 - Present

      Responsibilities: Project Planning Activities • Definition of project scope, structure and deliverables according to the Project Methodology. • Determination of resource requirements for the Project with the Project Sponsor and or Project owner and secure them from available project resources or by outsourcing to contractors. • Prepare a quality plan for each project that outlines the overall approach to quality, identify the standards to be employed and/or developed in the preparation of all projects and or service plans for the process of quality assurance review and control. • Calculate the project benefits. Complete all project/programme plans in a way that ensures compliance with acceptable standards, policies, procedures, methodologies, standards, templates, etc. • Establish and maintain the correct project structures to control and monitor the initiation, progress and delivery of the project. Field Services Activities • Supervision of Surface Preparation and Coating of Offshore/Marine Structures such as helidecks, stairways, decks, Hull of ships/FPSO, piping and piping-supports including Passivation of Stainless Steel. Cathodic protection testing and Engineering. • Mechanical Installation of static and rotating equipment such as turbines, firewater pumps, Pressure vessels such as re-boilers, reactors, heat exchanger etc. • Crane Maintenance and supervision. Complete overhaul of crane gearbox and winches. Inspection, repairs of luffing cylinders including telescopic cylinder especially of BLM, Mape Pedestral and Sparrow Manufacturer. • Plant Inspection using non-destructive techniques. Location of process piping using P & ID diagrams. Coordination of Rope Access Team to carry out varied inspection on remote structures. Show less

    • Project Engineer/Supervisor
      • Dec 2010 - Sep 2014

      -Setting up Project teams and equipment for Maintenance of Plant Equipment -Project Quality planning and Management -Project tracking and project status reporting -Preparing procedure for Installation, operation and Maintenance of Plant Equipment. -Supervision of repair and preventive maintenance and scheduled maintenance Programme -Coordination and supervision of Plant technician. Planning, directing and coordination of engineering design activities .- Preparation of bid sheet and contract doc for construction project -Make recommendations for poor performing process plant equipment. Advise on replacement, refurbishment and optimization for economic plant operations. -Overseas management of material and equipment inventory to ensure availability. Show less

    • Project/Design Engineer
      • Sep 2009 - Nov 2010

      • Supervision of Creation of 2D Plant layout, P&ID diagrams and Detailed General Assembling Drawing as per ASME B31.3 and other codes and standards. • Sizing of Piping Equipment(Reactor, Boiler, Separator, Pump etc), Fittings(Flanges, elbows, Tees) and Valves as per ASME standards. • Hydraulic and pressure designs of piping systems using ASME codes and standard. • Production of Spool drawings (Isometric) for Workshop fabrication. • Stress analysis of piping systems using Manual approach or ceaser11 • 3D Modelling of process facility using PDMS and AutoCAD Show less

Education

  • Institute of Piping Enginering & Building Services(IPEBS) , Hyderabad India.
    Professional PgDip, Process Piping Design and Engineering
    2012 - 2012
  • Obafemi Awolowo University
    Bachelor's Degree, Mechanical Engineering
    2002 - 2007

Community

You need to have a working account to view this content. Click here to join now