Vincent Bolle
Moderato léger & Engagé - Ops at moderato - léger et engagé- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Anglais -
Topline Score
Bio
Experience
-
-
Moderato léger & Engagé - Ops
-
Apr 2021 - Present
-
-
-
Getinge
-
Sweden
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Head of Operations
-
Jun 2019 - Mar 2021
As a member of Getinge France executive committee, leading Operations division: -customer service (call center, contracts, logistic)-sales operation (RFQ-to-Order & Order-to-cash activities, third party management)-project & installation (engineering, site execution)-tenders
-
-
Head of Projects & Installations - Healthcare/Lifescience Industry
-
Dec 2016 - Sep 2019
Leading the project department of Getinge France, Healthcare & Lifescience Industry activities: project delivery of operating rooms, hospital sterilization units, lifescience package equipment.
-
-
-
SPIE Oil & Gas Services
-
France
-
Oil and Gas
-
700 & Above Employee
-
Commissioning Field Engineer, Industrial EPC projects
-
Feb 2013 - Dec 2016
Within technical support division of Spie Oil & Gas, operational and corporate missions on site for EPC projects (Engineering, Procurement, Construction) for chemicals and petrol upstream key accounts.Main references :EAGLE, 100 M€ (1,5 years, Pont De Claix, France for VENCOREX, ex-SOLVAY)MOHO phase 1 Bis, 500 M€ (6 months, offshore, Congo for TOTAL)OFON 2 – OFQ package, 450 M€ (3 months, offshore, Nigeria for TOTAL)PETROCHAD 250 M€ (1 year, onshore, Chad for GLENCORE)
-
-
Proposal Engineer
-
Jul 2012 - Jan 2013
6 months work placement at Spie Oil & Gas Services :• Standardizing Spie OGS technical offers for maintenance & operation contracts, maintenance & inspection engineering contracts• Within in a team, taking part in technical offer building to client such as ENI, TOTAL, PERENCO• Implementing an EDMS (Electronic Document Management System) for the Asset Support department
-
-
-
TOTAL
-
Argentina
-
Food and Beverage Services
-
1 - 100 Employee
-
Project Deputy Engineer
-
Jul 2011 - Dec 2011
6 months work placement at TOTAL Kingsbury oil storage terminal. Involved on safety projects : • Checking the relevance of each pressure relief valve’s set pressure on site, calculating possible negative cascade effects • Within a team, surveying bunds integrity on site (capacity, permeability, penetrations) to meet with the new standards 6 months work placement at TOTAL Kingsbury oil storage terminal. Involved on safety projects : • Checking the relevance of each pressure relief valve’s set pressure on site, calculating possible negative cascade effects • Within a team, surveying bunds integrity on site (capacity, permeability, penetrations) to meet with the new standards
-
-
Education
-
Executive MBA - EDHEC Business School
Executive MBA -
Arts et Métiers ParisTech - École Nationale Supérieure d'Arts et Métiers
Graduate School of Mechanical and Industrial Engineering, Energy, mechanical -
Lean Six Sigma France
Black Belt, Lean Management -
Lycée Faidherbe
Post secondary preparatory school, Mathematics,Physics, Industrial sciences