vinayak chavan
Assistant Manager Project at WTE Infra Projects Pvt. Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
WTE Infra Projects Pvt. Ltd.
-
India
-
Environmental Services
-
100 - 200 Employee
-
Assistant Manager Project
-
Nov 2022 - Present
Working on Government projects. STP Projects in hand capacity 3 mld, 4 mld, 5 mld, 7 mld, 12 mld, 15 mld Technology working : MBBR, SBR, USBR Working on Government projects. STP Projects in hand capacity 3 mld, 4 mld, 5 mld, 7 mld, 12 mld, 15 mld Technology working : MBBR, SBR, USBR
-
-
-
A.T.E. HUBER Envirotech
-
India
-
Environmental Services
-
1 - 100 Employee
-
Senior engineer project
-
Aug 2014 - Jun 2022
Maximum handle plant capacity 26 mld. Worked on ETP, STP, UF, RO plants. Having experience of handling international clients. Industry working : Food, paper, textile Project Initiate : Define project scope, goals and deliverables that support business goals in collaboration with senior management Project planning : Plan and schedule project timelines and milestones using appropriate tools. Project execution : Preparation of technical specification sheet (data sheet) for all rotary and static equipment’s for procurement. Follow up with vendor and consultant/client for the document’s approval. Design and preparation of fabrication skid drawings such as UF Module, RO Skids, RO CIP Skids. Checking of piping isometric drawings and piping 2D GA drawing Vendor coordination : Get techno commercial details for materials and equipment and follow up with vendor. Client coordination : Preparation of billing documents as per the contract BOQ (Invoicing of the project). Share final dispatch packing list with client. Coordination with client regarding PO payment. Update every project execution task with client to build trust and good relationship. Site coordination : Coordination with site engineer and resolve issues at site. Also provide proper data regarding project. Vendor development : Search for new vendors and develop new products to optimize project cost. Proposal/techno commercial offer preparation: Design all system components, complete process unit sizing, prepare detailed cost estimation and summary sheet of HUBER equipment proposal (Municipal division). Prepare and submit budgetary or detailed techno-commercial proposals for supply, installation, commissioning and O&M of the water and wastewater treatment plant, as per tender / customer requirement. Compile all the techno-commercial documents as per the requirement of the tender. Complete the proposals within thfe time stipulated by the customer. Show less
-
-
-
Indiana Conveyor Private Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Design Engineer
-
Feb 2012 - Aug 2014
GA Drawing drafting and checking. Conveyors plant layout drafting and checking Designing of conveyor system as per IS 11592 std. Designing of Belt conveyor Material trajectory. Technical documents preparations. Client coordination Techno commercial evaluation with vender. GA Drawing drafting and checking. Conveyors plant layout drafting and checking Designing of conveyor system as per IS 11592 std. Designing of Belt conveyor Material trajectory. Technical documents preparations. Client coordination Techno commercial evaluation with vender.
-
-
Education
-
Lokmanya tilak college of engineering
Bachelor of Engineering (BE), Mechanical Engineering