Vikas Rastogi

Project and Engineering Head at chemical industry
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
West Delhi, Delhi, India, IN
Languages
  • English -
  • Hindi -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • 100 - 200 Employee
    • Project and Engineering Head
      • Jan 2023 - Present

      Entire responsibility for Project and Engineering of Grain Based Distillery 150+200 Klpd ,10 Klpd Malt Plant, IMFL bottling etc. Entire responsibility for Project and Engineering of Grain Based Distillery 150+200 Klpd ,10 Klpd Malt Plant, IMFL bottling etc.

    • AGM(Project & Engineering)
      • Jun 2014 - Jan 2023

      Finished projects:- Incinerator Boiler(Spent wash-fired: AFBC) MCR 56 TPH/ 45 Kg/cm2 (g), working Temp-400 +/- 5 degree C, Make-M/S Thermax Ltd. Turbine 7.2 MW(Extraction Condensing), Make- M/S Triveni Engineering Ltd Distillation with integrated MEE along-with Standalone evaporator(150 KLPD, Molasses Based) of M/S EXCEL Engineering  DM Water Plant (1250 M3/Day), Make- M/S Thermax Ltd.  Water Softening Plant(1320 M3/Day)  CPU (2850 M3/Day) based on Aerobic and Anaerobic process through Paques based on latest ICX reactor technology  Bottling plant Based on Semi-Automatic Bottling lines (SPEED-120 BPM) for production of 6-8 Lakh Cases per annum for Bacardi  Boiler (AFBC) MCR 20 TPH/ 67 Kg/cm2 (g), working Temp-490degreee C, Make-M/S Cheema Boiler Ltd.  Turbine 2.77 MW, Make- M/S Triveni Engineering Ltd.  Distillation (100 KLPD, Molasses Based) of M/S Praj Industries Ltd. Distillation (100 KLPD, Grain Based) of M/s EXCEL Engineering  De-hydration plant using MSDH(ETHANOL PLANT)(100 KLPD)  BMSW Evaporation Plant (1125 M3/Day)  Bio gas Digester + Holder (3200 m3).  Water recycling systems (872 M3/Day)).  TSS removal System (710 M3/Day)  UF+RO System(430 M3/Day)  DM Water Plant(600 M3/Day)  Water Show less

    • India
    • Food and Beverage Manufacturing
    • 200 - 300 Employee
    • Shift incharge (Project & Maintenance)
      • Jul 2013 - Jun 2014

      Job responsibilities :-  Daily monitoring the project status & day-to-day activities and reporting to Unit Head / Technical Head.  Coordination with project contractors for completion of project in time.  Preparation of Daily Project Report/material record/ manpower etc.  Look after the maintenance & maintenance schedule of milling plant, parboiling plant and boiler operation.  Associated with Head of maintenance department in preventive & breakdown maintenance of overall plant. Handled of major projects:-  Boiler MCR-20TPH ;Working pressure 22.5Kg/cm2(g),Working Temp 250 degree C, Make-Saviour Boiler Pvt. Ltd.  Parboiling plant of 30 TPH of M/S HSF Pvt. Ltd.  ETP (Effluent treatment plant).  Construction of AFBC furnace of boiler (12 TPH operated on rice husk).  Condense recovery system. Show less

  • SSBPL
    • Gaziabad,INDIA
    • Mechanical Engineer
      • Jul 2011 - Jul 2013

      Job responsibilities:  Quality check as per specification and drawing.  Material and jobs planning according to Project order.  Tool room machineries maintenance etc Job responsibilities:  Quality check as per specification and drawing.  Material and jobs planning according to Project order.  Tool room machineries maintenance etc

Education

  • Sikkim Manipal University - Distance Education
    Master of Business Administration (M.B.A.), Project Management
    2012 - 2014
  • Dr. A.P.J. Abdul Kalam Technical University
    Engineer’s Degree, Mechanical Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now