Vijay Srivastava

Assistant manager Civil at RALSON TYRES LIMITED
  • Claim this Profile
Contact Information
Location
Pune, Maharashtra, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Assistant manager Civil
      • May 2021 - Present

      Exclusively for site execution , expedite & Monitoring of construction activities as per approved quality Standards & specification and monitoring of resources for the safely and timely Completion of Ralson tyre plant project work .  Site Execution with standard and acceptable quality and monitoring of total project work.  Construction & PEB work of Banbury building up to 34 meter level  Construction & PEB work for Tyre & Extruder building up to 12-meter level  Construction and Execution of (FM2 & FM3) flooring for entire warehouse area  Construction of Underground Raw, Treated and Fire water tank with pump house of 80 lakh liter storage capacity.  Construction of 05 no’s Cooling tower i.e.- Banbury, Stock & TBM, compressor house, Chiller house & Curing substation  Construction of Test center building up to 13.2-meter level.  Construction of curing substation building up to 17.9-meter level.  Construction of stock & TBM building up to 16.6-meter level.  Construction of water harvesting pond 1.5 lakh liter storage capacity.  Construction of RCC utility Pipe Rack for entire plant area.  Construction of Transformer and MRS Building Substation.  Coordinating with subcontractors for smooth flow of work. Show less

    • United States
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Sr. site Engineer
      • Nov 2020 - May 2021

       Execution and Construction of RCC Ware house for Cattle feed storage.  Site execution and monitoring for demolish and dismantling of RCC based structure and MS structure project.  Site execution and monitoring of repair and renovation project work.  Coordinating with subcontractors for smooth flow of work.  Execution and Construction of RCC Ware house for Cattle feed storage.  Site execution and monitoring for demolish and dismantling of RCC based structure and MS structure project.  Site execution and monitoring of repair and renovation project work.  Coordinating with subcontractors for smooth flow of work.

    • India
    • Design Services
    • 700 & Above Employee
    • Sr. engineer
      • Oct 2019 - Oct 2020

      Name of Client: AMBUJA CEMENT LIMITED (A GREENFIELD PROJECT 9500 TPD) Monitoring of construction activities as per approved quality Standards and monitoring of resources for the safely and timely Completion of Ambuja cement plant project  Site execution Quality control and monitoring of total project work.  Construction of RCC preheater tower building up to 46.300 Mtr level.  Construction of RCC Kiln Pier I, II, & III.  Construction of RCC Blending Silo Raft foundation upto 00 level.  Construction of RCC Cement Silo upto 54.00 mtr level.  Construction of RCC Flyash Silo upto 34.900 mtr level.  Construction of Raw Mill Building.  Construction and Finishing of CCR Building up to 9.500 Mtr level.  Construction of RCC Pier Cap overhead cable gallery for entire plant.  Construction and Finishing of Load Centre (6 Nos).  Proper management of material and workmanship, and also ensuring that all work meet the stipulated quality standard.  Coordinating with subcontractors and client for smooth flow of work Show less

    • India
    • Mining
    • 1 - 100 Employee
    • Sr. Site Engineer/Site In-Charge
      • Dec 2015 - Sep 2019

      Construction and renovation of Lab building for National A.I.D.Sresearch Institute at MIDC G BLOCK, Bhosari, Pune (MH), for Indiancouncil of Medical Research (Ministry of Health). Site execution , quality control , billing and estimate of total project work. Construction of research Laboratory Building Designing and Providing Hi-tech researchLaboratory which cater the need of scientist for theresearch of A.I.D.S Installation of Water Chiller (230TR), Freezer room, Cold Room (-70’c & -30’c) Testing and commissioning of PPR Piping and ducting work for HVAC. Cable laying, Dressing work and installation of Electrical panel for entire lab Building. Testing and commissioning of Air Handling unit, Cassette Air conditioner for the entire LabBuilding. Proper management of materials and workmanship. Ensure that all the works meet the stipulated quality standards Coordinate with subcontractors and clients for smooth flow of work Show less

    • Asst. Engineer
      • Apr 2013 - Nov 2015

      Construction of RCC bridges phase X, XI, XII in various areaof Palamu, Hazaribagh and Ramgarh district at Jharkhand forJ.S.R.R.D.A (A state govt. organization) Monitoring, site execution , quality control billing and estimate of total project work as underP.M.G.S.Y. Const. of Open Foundation, R.C.C Bridges work as under P.M.G.S.Y (Major & Minor Bridges). Const. of PCC & B.T Road work for new connectivity at remote area as under P.M.G.S.Y Earth work in Excavation for Approach & bridges work Const. of R.C.C Guard wall, H.P.C & Filter media works for approach Road & Bridges Backfilling work for Approach, foundation & Retain wall of Bridges Proper management of materials and workmanship. Ensure that all the works meet the stipulated quality standards Coordinate with subcontractors for smooth flow of work Show less

    • India
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Asst. Engineer. (Civil)
      • Aug 2011 - Apr 2013

      Construction of major R.C.C and Structural work for Cement plant (A Greenfield project in Patratu, dist.- Ramgarh (Jharkhand)  Monitoring, site execution, quality control and billing of total project work.  Const. of RCC preheater tower building up to 73.00 mtr level.  Const. of Cement Silo (02 nos), upto 42.00 mtr level.  Const. of Fly ash Silo (02 nos), upto 32.00 mtr level.  Const. of R.C.C, Raw Mill building,  Const. & structural work of, Coal Storage Shed, Workshop & Store.  Const. of R.C.C 1 lakh Lt. Capacity Water Tower Structure.  Const. and finishing of CCR Building up to 9.000 mtr level.  Const., erection and commissioning of 100-ton capacity Weighbridge.  Proper management of material and workmanship, and also ensuring that all work meet the stipulated quality standard.  Coordinating with subcontractors and client for smooth flow of work. Show less

    • J.E. Civil
      • Aug 2009 - Aug 2011

      1. Name of the client RITES LIMITED (A govt. of India Enterprise) Major Projects Const. of B.L.T and Laying of new Railway track for track hopper for DVC (C.T.P.S) dist- bokaro (Jharkhand)  Site execution , billing and monitoring of total project work.  Earthwork in excavation with maintain level of Railway line  Const of RCC bridges (major and minor)  Formation Work of Track Hopper & Fuel Oil Rail Line.  Const. of R.C.C Boundary wall and ballast less track  Laying and Linking of total Railway line 2. Name of the Client - DAMODAR VALLEY CORPORATION (CTPS) (Govt. of India, Under ministry of Power statutory body) Major project - Renovation work of Railway line for Wagon tippler in DVC (CTPS) dist- Bokaro (Jharkhand)  Site execution, billing and monitoring of total project work.  Earth work in Excavation for rail line  Spreading of Ballast and stone dust for railway line  Dismantling & Transporting of Rail Line  Laying of new Railway Track for wagon Tippler  Const of RCC Drain Work in Both Side of Rail Line  Const of 500 mtr RCC Retaining Wall.  1 km Fencing of fuel oil Rail Line. Show less

Education

  • State board of technical education, Jharkhand
    Diploma in Civil engineering, Civil Engineering
    2006 - 2008

Community

You need to have a working account to view this content. Click here to join now