Vijay Naidu
Manager Mechanical Engineering at RELIANCE CORPORATE IT PARK LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Tamil -
-
Hindhi -
-
English -
Topline Score
Bio
Experience
-
RELIANCE CORPORATE IT PARK LIMITED
-
India
-
Chemical Manufacturing
-
300 - 400 Employee
-
Manager Mechanical Engineering
-
Dec 2015 - Present
-
-
-
Fabtech Projects & Engineers Ltd.
-
India
-
Oil and Gas
-
300 - 400 Employee
-
LEAD QA&QC (Mech)
-
May 2012 - Present
Project Profile: Project: DHT-SRU Project Client: HPCIL (Hindustan Petroleum Corporation India Ltd.). Duration: May-2012 to till date WORK EXPOSURE: • Lead a team of 12project construction employees in the SRU unit Visakha Refinery. • Surveillance inspection in the store for ensuring and the storage system of welding consumables. • Interpretation of Radiography Films and Witnessing UT inspection. Issuing NCR (nonconformance reports) which is not related to the procedures, and Establishing of Welder Performance Reports and weekly Repairs status. • Performing Visual Inspection and Mechanical inspection of storage tanks and Interpretation of Radio graphic films for welded joints, and liaise with a crew for defining NDT tests, like a R.T, P.T,MPT, UT, and Hardness test, Post weld heat treatments and cycle as per code and piping classes • Monitoring QC Inspectors at site, allocation of jobs to QC Inspectors, day to day follow up of inspectors regarding work and site problems. • Monitoring QC inspectors involved in line checking, regarding completion of weld summary sheets, NDT requirement, mark-up drawings, and as-built drawings in order to meet challenging deadlines. • Co-ordinate with the client for day to day activities and also combined line check with QC inspector. • Review and evaluate with the Project Manager the progress of vendors and subcontractors. Show less
-
-
-
Jinbhuvish Power Generations Pvt Ltd
-
Hyderabad Area, India
-
Sr.Engineer (Mech)
-
Mar 2011 - May 2012
Project Profile: Project: 2 x 300 MW, Unit #1 & 2, Phase-I, Client: Jinbhuvish Power Generations Pvt. Ltd. Duration: May-2011 to May 2012 WORK EXPOSURE: • Code knowledge ASME (B31.1, B31.3), ASME Sec. IX, Sec. V, API-570, API 653, AWS, ASTM, IS Codes, Indian Boiler Regulation (IBR) & ISO-9001:2000 • Preparation requisitions, purchase orders and review of vendor drawings as per project specs • Co-ordination with Client for vendor inspections & other discipline departments • Review and Verification of incoming materials and consumables • Coordination & Planning day to day mechanical activities at site • Raising Technical Queries for piping and welding requirements • Boiler (2x300 MW) Piping, Fuel Oil Pump System(FOPS), LP Piping, CST Tanks, Ash Handling Plant, Coal Handling Plant, DM Water Plant, Air Compressor House, Structural Pipe rack, Fire Fighting & Detection Systems and CW Pipeline System Packages • Fabrication, Erection, Structural, Equipments Alignments, piping and welding inspection at site • Review & Evaluate Field Quality Plan (FQP), WPS & PQR as per project specs. • Review WPS & Witnessing its Qualification and certification of welders as per ASME Sec IX • Review and witness UT, RT and DPT inspection. Show less
-
-
-
HERTEL TONG HOI ENGINEERING, SINGAPORE
-
Singapore
-
ENGINEER
-
Aug 2008 - Mar 2011
Project Profile: Project: Oil & Gas Project, Construction and Plant Maintenance Client: Invista Singapore Pte. Ltd. Vopak Penjuru Pte.ltd. Duration: Sep-2009 to Apr-2011 WORK EXPOSURE: • Inspection of Mechanical Piping and fittings, Valves, Pumps, Hoppers, • Review & Evaluate Field Quality Plan (FQP), WPS & PQR as per project specs. • Preparation of relevant method statement procedures and project required WPS's for the accomplishment of piping and welding. • Verification and Inspection of incoming piping and welding materials & consumables • Fit-up, In-process & Final Welding inspection of All piping systems • Equipments Fabrication & testing at site (Vessels, Exchangers, and Steam Drum & Furnace) & piping installation inspection completed as per standard & specification. • Implementation of project specifications, standards, quality requirements of clients etc. • Involved with the receiving inspection of material and verification with test reports • Piping (CS, SS, AS-ASTM) and welding requirements (1”-36”, WT 118mm) according to codes and standards • Witnessing of WPS Qualification and certification of welders as per ASME Sec IX • Review and witness RT, UT, DPT inspection • Review the reports of PWHT and Hardness test • Punch List preparation of Boiler and various systems piping line. • Witnessing hydrostatic test of Boiler and various pipe line, Auxiliary piping and Flash Tanks & Pump alignments • Ensuring Safety & Quality at work site. Show less
-
-
-
DRYDOCKS WORLD, DUBAI, SHIPPING
-
(UAE) Dubai
-
ASRM(PIPING)
-
Aug 2007 - Aug 2008
Project Profile: Project: Ship Building and Ship Repairs Construction Client: Dry Docks, World Dubai. Duration: Sep-2008 to Aug-2009 WORK EXPOSURE: • Initial survey on cargo tangs, ballast tanks, fuel oil tanks, slop tanks, fore peak tanks, engine room, steering room etc from main deck to bottom. • Overall responsibility of overseeing the Operations of Ship Repair and engineering departments onboard. • Inspection and monitoring on board construction activities both repairs as well as conversion scope in accordance with approved drawings. • Execute and planning the day to day mechanical activities on site as per project Plot Plans, Isometrics, P & ID's, Piping Arrangement Drawings, and Supports Drawings and Project specifications • Review of NDT Reports ( RT, PT and MT) & Interpretation of RT films • Resolving the site routing and preparation of AS-BUILT Isometrics • Raising Technical Queries (TQ) and resolving as per site requirements • Process piping and welding requirements according to codes and standards. ‘Isometric to P&ID’ check for test packages and address discrepancies • Develop hydrostatic test P&ID markup indicating the test boundaries • Co-ordination with procurement and vendor for client inspection at vendor premises, • Preparing the limit of Hydro test, Pneumatic Leak Test of Piping Systems and sign-off Reinstatement, pre-commissioning activities. • Provide construction production data and reports as per daily accomplishment to Scheduling & Cost Control and QA/QC Department • Liaise to Project Manager, Mechanical Construction Manager & Site QA/QC Manager Show less
-
-
-
SHIP BUILDING CENTER
-
VISAKHAPATNAM
-
SITE ENGINEER
-
Jan 2006 - Jul 2007
Supervise and planning the day to day mechanical activities on site as per project Plot Plans, Isometrics, P & ID's, Piping Arrangement Drawings, and Supports Drawings and Project specifications Review of drawings, WPS & PQR as per project specs, preparation of weld mapping on isometrics Preparation of relevant method statement procedures and project required WPS's for the accomplishment of piping and welding. Piping and its components material take-offs and welding consumables Daily monitoring of project planning & scheduling Review and Verification of fit-up, erection and daily welding reports in Shop & Field Review and evaluation of piping fabrication and welding at site and workshop Implementation of specifications, standards, quality requirements of clients, ISO requirements, etc. Preparing the limit of Hydro test, Pneumatic Leak Test of Piping Systems and pre-commissioning activities. Involved with the receiving inspection of material as per specification and verification with test reports Monitoring the welding of various systems piping in work shop and onsite process lines Carried out the planning monitoring and coordinating the various activities involved in fabrication industries. To ensure that all site activities are performed in environmentally safe and responsible manner. Supervising piping works to be performed by construction contractor and insure the compliance with established construction schedule and project requirements. Evaluate the construction contractor work capability according to the programs to be implemented and promote corrective action where necessary. Operationalzed the complete engineering work shop by undertaking in house repairs thereby increasing capacity to maintain various equipment’s without external aid. Show less
-
-
Education
-
TPIST
Engineering, Mech -
RCM ST THERISSA PUBLIC SCHOOL
SSC, Science