Vijay Naidu

Manager Mechanical Engineering at RELIANCE CORPORATE IT PARK LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jamnagar, Gujarat, India, IN
Languages
  • Tamil -
  • Hindhi -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Chemical Manufacturing
    • 300 - 400 Employee
    • Manager Mechanical Engineering
      • Dec 2015 - Present

    • India
    • Oil and Gas
    • 300 - 400 Employee
    • LEAD QA&QC (Mech)
      • May 2012 - Present

      Project Profile: Project: DHT-SRU Project Client: HPCIL (Hindustan Petroleum Corporation India Ltd.). Duration: May-2012 to till date WORK EXPOSURE: • Lead a team of 12project construction employees in the SRU unit Visakha Refinery. • Surveillance inspection in the store for ensuring and the storage system of welding consumables. • Interpretation of Radiography Films and Witnessing UT inspection. Issuing NCR (nonconformance reports) which is not related to the procedures, and Establishing of Welder Performance Reports and weekly Repairs status. • Performing Visual Inspection and Mechanical inspection of storage tanks and Interpretation of Radio graphic films for welded joints, and liaise with a crew for defining NDT tests, like a R.T, P.T,MPT, UT, and Hardness test, Post weld heat treatments and cycle as per code and piping classes • Monitoring QC Inspectors at site, allocation of jobs to QC Inspectors, day to day follow up of inspectors regarding work and site problems. • Monitoring QC inspectors involved in line checking, regarding completion of weld summary sheets, NDT requirement, mark-up drawings, and as-built drawings in order to meet challenging deadlines. • Co-ordinate with the client for day to day activities and also combined line check with QC inspector. • Review and evaluate with the Project Manager the progress of vendors and subcontractors. Show less

    • Sr.Engineer (Mech)
      • Mar 2011 - May 2012

      Project Profile: Project: 2 x 300 MW, Unit #1 & 2, Phase-I, Client: Jinbhuvish Power Generations Pvt. Ltd. Duration: May-2011 to May 2012 WORK EXPOSURE: • Code knowledge ASME (B31.1, B31.3), ASME Sec. IX, Sec. V, API-570, API 653, AWS, ASTM, IS Codes, Indian Boiler Regulation (IBR) & ISO-9001:2000 • Preparation requisitions, purchase orders and review of vendor drawings as per project specs • Co-ordination with Client for vendor inspections & other discipline departments • Review and Verification of incoming materials and consumables • Coordination & Planning day to day mechanical activities at site • Raising Technical Queries for piping and welding requirements • Boiler (2x300 MW) Piping, Fuel Oil Pump System(FOPS), LP Piping, CST Tanks, Ash Handling Plant, Coal Handling Plant, DM Water Plant, Air Compressor House, Structural Pipe rack, Fire Fighting & Detection Systems and CW Pipeline System Packages • Fabrication, Erection, Structural, Equipments Alignments, piping and welding inspection at site • Review & Evaluate Field Quality Plan (FQP), WPS & PQR as per project specs. • Review WPS & Witnessing its Qualification and certification of welders as per ASME Sec IX • Review and witness UT, RT and DPT inspection. Show less

    • ENGINEER
      • Aug 2008 - Mar 2011

      Project Profile: Project: Oil & Gas Project, Construction and Plant Maintenance Client: Invista Singapore Pte. Ltd. Vopak Penjuru Pte.ltd. Duration: Sep-2009 to Apr-2011 WORK EXPOSURE: • Inspection of Mechanical Piping and fittings, Valves, Pumps, Hoppers, • Review & Evaluate Field Quality Plan (FQP), WPS & PQR as per project specs. • Preparation of relevant method statement procedures and project required WPS's for the accomplishment of piping and welding. • Verification and Inspection of incoming piping and welding materials & consumables • Fit-up, In-process & Final Welding inspection of All piping systems • Equipments Fabrication & testing at site (Vessels, Exchangers, and Steam Drum & Furnace) & piping installation inspection completed as per standard & specification. • Implementation of project specifications, standards, quality requirements of clients etc. • Involved with the receiving inspection of material and verification with test reports • Piping (CS, SS, AS-ASTM) and welding requirements (1”-36”, WT 118mm) according to codes and standards • Witnessing of WPS Qualification and certification of welders as per ASME Sec IX • Review and witness RT, UT, DPT inspection • Review the reports of PWHT and Hardness test • Punch List preparation of Boiler and various systems piping line. • Witnessing hydrostatic test of Boiler and various pipe line, Auxiliary piping and Flash Tanks & Pump alignments • Ensuring Safety & Quality at work site. Show less

    • ASRM(PIPING)
      • Aug 2007 - Aug 2008

      Project Profile: Project: Ship Building and Ship Repairs Construction Client: Dry Docks, World Dubai. Duration: Sep-2008 to Aug-2009 WORK EXPOSURE: • Initial survey on cargo tangs, ballast tanks, fuel oil tanks, slop tanks, fore peak tanks, engine room, steering room etc from main deck to bottom. • Overall responsibility of overseeing the Operations of Ship Repair and engineering departments onboard. • Inspection and monitoring on board construction activities both repairs as well as conversion scope in accordance with approved drawings. • Execute and planning the day to day mechanical activities on site as per project Plot Plans, Isometrics, P & ID's, Piping Arrangement Drawings, and Supports Drawings and Project specifications • Review of NDT Reports ( RT, PT and MT) & Interpretation of RT films • Resolving the site routing and preparation of AS-BUILT Isometrics • Raising Technical Queries (TQ) and resolving as per site requirements • Process piping and welding requirements according to codes and standards. ‘Isometric to P&ID’ check for test packages and address discrepancies • Develop hydrostatic test P&ID markup indicating the test boundaries • Co-ordination with procurement and vendor for client inspection at vendor premises, • Preparing the limit of Hydro test, Pneumatic Leak Test of Piping Systems and sign-off Reinstatement, pre-commissioning activities. • Provide construction production data and reports as per daily accomplishment to Scheduling & Cost Control and QA/QC Department • Liaise to Project Manager, Mechanical Construction Manager & Site QA/QC Manager Show less

    • SITE ENGINEER
      • Jan 2006 - Jul 2007

       Supervise and planning the day to day mechanical activities on site as per project Plot Plans, Isometrics, P & ID's, Piping Arrangement Drawings, and Supports Drawings and Project specifications  Review of drawings, WPS & PQR as per project specs, preparation of weld mapping on isometrics  Preparation of relevant method statement procedures and project required WPS's for the accomplishment of piping and welding.  Piping and its components material take-offs and welding consumables  Daily monitoring of project planning & scheduling  Review and Verification of fit-up, erection and daily welding reports in Shop & Field  Review and evaluation of piping fabrication and welding at site and workshop  Implementation of specifications, standards, quality requirements of clients, ISO requirements, etc.  Preparing the limit of Hydro test, Pneumatic Leak Test of Piping Systems and pre-commissioning activities.  Involved with the receiving inspection of material as per specification and verification with test reports  Monitoring the welding of various systems piping in work shop and onsite process lines  Carried out the planning monitoring and coordinating the various activities involved in fabrication industries.  To ensure that all site activities are performed in environmentally safe and responsible manner.  Supervising piping works to be performed by construction contractor and insure the compliance with established construction schedule and project requirements.  Evaluate the construction contractor work capability according to the programs to be implemented and promote corrective action where necessary.  Operationalzed the complete engineering work shop by undertaking in house repairs thereby increasing capacity to maintain various equipment’s without external aid. Show less

Education

  • TPIST
    Engineering, Mech
    2002 - 2005
  • RCM ST THERISSA PUBLIC SCHOOL
    SSC, Science
    1999 - 2000

Community

You need to have a working account to view this content. Click here to join now