Veysel Aydın
Center Operations-Mechanical Engineer at MOGAN HOLDING (MOGAN ENERJI YATIRIM HOLDING)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
ASBI-25t Formation Certificate
Crosby AirpesMar, 2022- Nov, 2024 -
GE Cypress Installation Training Module 1,2 and 3
GENov, 2021- Nov, 2024 -
Letter of Recommendation
KC CottrellSep, 2021- Nov, 2024 -
Fundementals of CAD/CAm
Orta Doğu Teknik ÜniversitesiOct, 2020- Nov, 2024 -
Occupational Health and Safety
Orta Doğu Teknik ÜniversitesiOct, 2020- Nov, 2024 -
English Proficiency Report
Kütahya Dumlupınar ÜniversitesiJan, 2018- Nov, 2024 -
GWO Basic Safety Training-Advanced Rescue Training
Global Wind OrganisationJun, 2022- Nov, 2024 -
HWS 01 L – Operation of ladder-guided service lift TOPlift L + H200 SL-L incl. Daily Check
Hailo Wind Systems GmbH & Co. KGJan, 2022- Nov, 2024 -
HWS 01 R – Operation of rope-guided service lift GLOBALlift R + H200 SL-S incl. Daily Check
Hailo Wind Systems GmbH & Co. KGNov, 2021- Nov, 2024
Experience
-
MOGAN HOLDING (MOGAN ENERJI YATIRIM HOLDING)
-
Renewable Energy Power Generation
-
1 - 100 Employee
-
Center Operations-Mechanical Engineer
-
May 2023 - Present
-
-
-
TorkCheck
-
Türkiye
-
Wind Electric Power Generation
-
1 - 100 Employee
-
Installation Lead
-
Jun 2021 - Jan 2023
Van-Bağlama Project 7 Turbines( GE 3.8MW-Pre Installation and Main Installation) Taza Project 27 Turbines ( GE 3.4MW-Pre Installation and Main Installation) Sinop Hamsi Project 3 Turbines (Enercon E138 ) Aftissat Extension-Morocco 10 Turbines (Cypress S2 5.MW-Pre Installation and Main Installation) - Preparations of daily installation reports, plans and DCR’s, - Preparations and control of the HSE documents. - Managing the lifting operations according to QHSE rules. - Preparation of the installation - Detection, and demanding processes of tools. - Planning of the inspection for lifting tools. - Torquing, Internal Works and Installation of Service Lift. - Stretching of anchor bolts and preparation of reports. - Control of the Electrical Works according to QHSE rules. - Control of the Mechanical Works according to QHSE rules. - Preparation and planning of pre-installation. - Preparations of installations and assemble of the lifting tools. - Erection of components, generator alignments. - Planning of the 3rd part inspection and cable tests. - Preparation of the turbine installation reports - Correction of the punch list. - Planning of Backtransport. - Handover of the turbines. Show less
-
-
-
Çelikler Holding
-
Türkiye
-
Construction
-
500 - 600 Employee
-
FGD Project Engineer
-
Sep 2020 - Jun 2021
Installation and alignment of The Pipes According to Isometric Drawings and P&ID.(ASME and DIN Standarts) Hydrotest of pipings. Installation and alignment of The Steel Structures Detection of stuffs which required for departments and Demanding process. Taking offers for the stuffs and evaluation of offers. Installation and alignment of The Equipments.(Pumps,Reducers,Blowers,Conveyors etc.) Ndt of the weldings Inspection of the Coating processes. Preparation of progress payments Comissioning Works of the System Show less
-
-
-
Çelikler Holding
-
Türkiye
-
Construction
-
500 - 600 Employee
-
Internship Trainee
-
Jun 2019 - Aug 2019
Management Management
-
-
-
Çelikler Holding
-
Türkiye
-
Construction
-
500 - 600 Employee
-
Internship Trainee
-
Jun 2018 - Aug 2018
Machining Process Welding Thermal Processes Plastic Forming Machining Process Welding Thermal Processes Plastic Forming
-
-
Education
-
Kütahya Dumlupınar Üniversitesi
Yüksek Lisans (Master), Occupational Health and Safety -
Dumlupinar University
2.77/4.00, Mechanical Engineering -
University of Pécs
Bachelor's degree, Mechanical Engineering -
Dokuz Eylül Üniversitesi
İşletme Fakültesi, Economics(Eng-A)