VENU PUSAPATHRI
Assistant Quality cum Material Engineer at SATRA Services and Solutions Private Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
SATRA Services and Solutions Private Limited
-
India
-
Civil Engineering
-
100 - 200 Employee
-
Assistant Quality cum Material Engineer
-
Jun 2021 - Present
1.Assist Team Leader/Senior Quality Engineer in checking all QA/QC Tests, reports and pavement designs prepared by Concessionaire 2.Assist in Supervision of Highway/pavement construction works. 3.Assist in ensuring execution of Highway/pavement works on site as per MoRTH specifications and standards. 4.Assist in Design,Supervision of PQC and DLC works 5.Assist Team Leader in preparation of various QA/QC project reports. 6.Preparation of Monthly/Half yearly reports strip charts and physical progress of project. 7.Assist in ensuring the quality tests as per the frequency specifications and standards. 8.Any other tasks as required.
-
-
-
Aarvee Associates
-
India
-
Civil Engineering
-
700 & Above Employee
-
Assistant Highway Maintenance Engineer
-
Sep 2020 - May 2021
1.Assist Team Leader/Resident Engineer in checking all Highway and pavement designs prepared by Concessionaire 2.Assist in Supervision of Highway/pavement construction works. 3.Assist in ensuring execution of Highway/pavement works on site as per specifications and standards. 4.Assist in Supervision of remedial works during Operation & Maintenance. 5.Assist Team Leader in preparation of various project reports. 6.Preparation of Monthly/Half yearly reports. 7.Any other tasks as required.
-
-
-
MSV International, Inc.
-
United States
-
Civil Engineering
-
300 - 400 Employee
-
Assistant Highway Engineer
-
Jan 2020 - Sep 2020
1.Assist Team Leader/Resident Engineer in checking all Highway and pavement designs prepared by Concessionaire 2.Assist in Supervision of Highway/pavement construction works. 3.Assist in ensuring execution of Highway/pavement works on site as per specifications and standards. 4.Assist in Supervision of remedial works during Operation & Maintenance. 5.Assist Team Leader in preparation of various project reports. 6.Preparation of Monthly progress reports/Half yearly reports. 7.Any other tasks as required.
-
-
-
SAI Consulting Engineers - SYSTRA Group
-
India
-
Truck Transportation
-
100 - 200 Employee
-
Quality Engineer
-
Jan 2019 - Dec 2019
1.Checking method of Construction, Quality,and control of works. 2.Checking the mix designs and conducting various lab tests as per specifications and standards. 3.Suggest any modifications in quality assurance during construction of works. 4.Checking up quality control procedures. 5.Review concesionaire scheme of deployment of plant, equipment and machinery. 1.Checking method of Construction, Quality,and control of works. 2.Checking the mix designs and conducting various lab tests as per specifications and standards. 3.Suggest any modifications in quality assurance during construction of works. 4.Checking up quality control procedures. 5.Review concesionaire scheme of deployment of plant, equipment and machinery.
-
-
-
K&J PROJECTS PRIVATE LIMITED
-
India
-
Civil Engineering
-
1 - 100 Employee
-
Assistant Manager (Highways)
-
Sep 2016 - Jul 2018
1.Site Supervision, setting out of works,checking measurements as specified by Team Leaer/Resident Engineer. 2.Assist Team Leader/Highway Engineer in preparation of various reports. 3.Coordination with clients and making RA bills. 4.Monitor the progress of works and take suitable measures for timely completion. 5.Ensure complete adherence to Maintenance standards during construction. 6.Preparation of Monthly progress reports/Half yearly reports. 1.Site Supervision, setting out of works,checking measurements as specified by Team Leaer/Resident Engineer. 2.Assist Team Leader/Highway Engineer in preparation of various reports. 3.Coordination with clients and making RA bills. 4.Monitor the progress of works and take suitable measures for timely completion. 5.Ensure complete adherence to Maintenance standards during construction. 6.Preparation of Monthly progress reports/Half yearly reports.
-
-
-
Srii Balaji Constructions
-
India
-
Construction
-
1 - 100 Employee
-
Quality Control Engineer
-
Aug 2013 - May 2016
1.Planning and scheduling of works. 2.Preparation of construction methodology,work programme and quality assurance procedures. 3.Ensure Quality control/Quality assurance of works. 4.monitor the setting up of hot mix plants and rock crusher plants. 5.Prepare various quality reports as per specifications and standards. 6.Liaison with Client and Consultant. 7.Preparation and formulation of Mix Designs. 8 Conduct field and laboratory tests on all materials. 9.Check the material testing records and sampling procedures.
-
-
Education
-
Jawaharlal Nehru Technological University, Hyderabad
B.tech, Civil Engineering