Venkatesh Gopalan

Senior Services Engineer (Fitout & Facility) at Nayel & Bin Harmal Investment Co
  • Claim this Profile
Contact Information
Location
Abu Dhabi Emirate, United Arab Emirates, AE
Languages
  • English Professional working proficiency
  • Tamil Native or bilingual proficiency
  • Hindi Limited working proficiency
  • Arabic Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Investment Management
    • 1 - 100 Employee
    • Senior Services Engineer (Fitout & Facility)
      • Jul 2008 - Present

      Bawadi Mall Operation, Projects, Tenant Fit out & Maintenance Activities; - ●Coordination & Implementation for Building modification, Extensions & Projects with Consultant and Authorities approvals (Al Ain Distribution, Etisalat, Municipality, Civil Defense, ADSSC). ●To coordinate local buildings departments for inspections. ●Budget (POMEC) preparation of Property Operation, Maintenance & Energy consumption for Director Review & Approval. ●To Create and develop preventive Maintenance schedules and ensure adherence of the schedules to achieve maximum operations. ●To Analyze Electrical Consumptions for Malls, Hotels, Commercial Properties. ●To Organized spot checks and inspections of all F & B and tenant outlets on daily/weekly basis with the supervisors and compile inspection reports for review of senior management ●Inspecting shell and core tenant premise, verify accuracy of Lods, Landlord's base-built provisions, and follow up with necessary actions to fulfill landlord's obligation of unit's physical hand over; ●To convene and conduct kick off meetings and follow up meetings to manage and facilitate with the entire design and fitting out process; ●To oversee the tenant's fit-out program and conformance to landlord's requirement; ●To Manages contractors / subcontractors to help deliver the project on time and within budget. ●To Supervise the project related to consultancy, MEP, Hard services, Civils, FLS, Soft service, landscape, site contractors, and ensure work is completed to a satisfactory standard. ●To Finalize the Contractors for Tenant, Mall & Hotel Services .i.e. LPG supply, Grease Trap Cleaning, Kitchen Extract Cleanings..Etc. ●To Finalize the Annual Maintenance Contracts for Fire Alarm Systems, Fire Fighting Systems, Bms, Generators, Emergency & Exit light Monitoring System, Elevators, and HVAC systems. •Ensures building and equipment licenses and certifications are current. Show less

    • United Arab Emirates
    • Hospitality
    • 100 - 200 Employee
    • Chief Engineer
      • Apr 2015 - Oct 2019

      Facilities & Maintenance Responsibilities:- • To Maintain the Electro mechanical equipment, Refrigeration equipment through in-house maintenance team free from the failure with preventive maintenance program. • To follow up the daily Engineering activities to run the operation smoothly. • To maintain the major equipment firefighting, fire alarm & LPG system healthy condition through the internal team & third party contractor. • To follow the third party contractor works and validate as an annual maintenance contract for Hotel’s Equipment .i.e. GRMS, BMS, CCTV. • To attend the authority inspection and get a certifications & approval .i.e. Civil Defense, Food Control, HACCP, TCA, MCC. • To maintain the Guest room maintenance though the proper PPM Schedule throughout the year. • To co-ordinate banquet hall team to arrange the AV, Projectors, Lighting for the event. • To do the HACCP auditing, maintain the kitchen equipment’s and to do the calibration of refrigeration and hot equipment’s through the third party contractor. • To do the cooling & heating equipment calibration yearly and maintain the record • To maintain the temperature of the pool, chlorine level & PH according to the hotel standards. • To follow the regular maintenance of Spa Equipment & Gym Equipment according to the standard. • To maintain the spare materials in store for Electrical, mechanical, Refrigeration, General items to run the regular operation. • To raise the Purchase request for the Engineering items and Project items and co-ordinate with purchasing team. • To prepare the Engineering budget along with yearly saving and energy consumption savings To do the new project activities – Addition / Modification of stores, steel structures, new equipment’s purchase Show less

    • India
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Process Engineer
      • Jun 2004 - Jun 2008

      Company Details: - This Company is certified to TS 16949 and ISO14000.Its MNC Company and Manufacturing Unit Supplier Details: - Hyundai, Maruti, Ford, Mahindra & Mahindra, Telco, Ashok Leyland. Manufacturing Details: - Clutch Parts - Cover, Diaphragm, Cushion Disc, Retainer Plate, and Hub. Assembly Details: - Cover Assembly (Passenger car, Truck and Tractor), Disc Assembly (Passenger Car & Truck and Tractor) Process Details: - Press Shop – Blanking, Calibration, Trimming, Piercing (Using610T, Cofmo Press), Heat Treatment (SQF Furnace), Tempering, Hot forming, Shot peening and Assembly. Responsibilities: - 1. Control Plan, Process Flow, Process Mapping. 2. Working Standard, Visual Work instruction. 3.5S Activity, SMED, Poke Yoke. 4. Layout Modification, Fixture Drawing Modification. 5. Monthly Workshop Displays. 6. Monthly Report (Production and Maintenance). 7. Breakdown Analysis Report. 8. Raising Purchase Indent using ERP Software (Purchase Module) 9. Adding & Modifying Part Number in ERP Software (Inventory Module) Show less

Education

  • PET Engineering College
    Bachelor of Engineering (B.E.), Mechanical Engineering
    1998 - 2002

Community

You need to have a working account to view this content. Click here to join now