Velmer Claudio
Manager at HS Ad- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
HSAd
-
South Korea
-
Advertising Services
-
200 - 300 Employee
-
Manager
-
Dec 2015 - Present
-
-
-
Walls and Beyond Design LLC
-
Technopark, Jebel Ali, Dubai UAE
-
Projects Manager
-
Aug 2012 - Dec 2015
DUTIES AND RESPONSIBILITIES: • Manages all on-progress and up-coming projects. • AutoCad Shop Drawings review, preparation & submittals for Dubai Municipality (DM) & Dubai Civil Defense (DCD) online applications. • Site visits, surveys & site measurements. • Coordination with Client, Consultant, Contractor & other trades at site. • Assisting in all technical details & fixture counting. • Progress Report & Site inspection preparations and executions. • Preparing BOQ for new & upcoming projects. PROJECT INVOLVEMENT: • Platinum CWK / Tasjeel - Dubai Mall (Dubai, UAE) • 7D1 Ritz Carlton - Limestone House (Dubai, UAE) • Tim Hortons - Sahara Centre (Dubai, UAE) • Tim Hortons - Marina Mall (Abu Dhabi, UAE) • Replay Retail Shop - Dubai Mall (Dubai, UAE) • Denim and Supply Retail Shop - Dubai Mall (Dubai, UAE) • Café Vergnano Coffee Shop - Dubai Mall (Dubai, UAE) • Karen Millen Retail Shop - Mall of the Emirates (Dubai, UAE) • Karen Millen Galleries La Fayette Retail Shop - Dubai Mall (Dubai, UAE) • Karen Millen Central Market Retail Shop - World Trade Center Mall (Abu Dhabi, UAE) • Karen Millen Retail Shop - Yas Mall (Abu Dhabi, UAE) • Jacadi Paris Retail Shop - Yas Mall (Abu Dhabi, UAE) • Little Bangkok Restaurant - Oud Metha Branch (Dubai, UAE) • Royal Orchid Restaurant - Dubai Down Town (Dubai, UAE) • Rice Creamery Restaurant - City Walk (Dubai, UAE) • The Sewing Corner - Bay Avenue Business Bay (Dubai, UAE) • Al Neel Exchange - Baniyas Metro Station (Dubai, UAE) • Al Neel Exchange - Abu Hail Metro Station (Dubai, UAE) • Italian Jewellery Shop - Gold and Diamond Park (Dubai, UAE) • Liali Jewellery Shop - Gold and Diamond Park (Dubai, UAE) Show less
-
-
-
Debbas UAE
-
United Arab Emirates
-
Wholesale Building Materials
-
1 - 100 Employee
-
Project Site Coordinator
-
Jul 2010 - Aug 2012
DUTIES AND RESPONSIBILITIES: • AutoCad Shop drawings review. • AutoCad Shop drawings preparation and submittal. • Site visits, site surveys and site measurements. • Coordination with consultant, contractor and other trades on-site. • Assisting in all technical details and fixture counting. • Progress report and site inspection preparations and execution. • Audio Visual Presentation preparations for new and upcoming projects. (http://vimeo.com/28503953) sample AVP presentation. PROJECT INVOLVEMENT: • Dubai Metro (Redline) (Dubai,UAE) • Dubai Sports Complex (Dubai, UAE) • St. Regis Hotel (Abu Dhabi, UAE) • New Doha International Airport (Doha, Qatar) • Sahara Mall Expansion (Sharjah,UAE) • New York University (Abu Dhabi, UAE) Show less
-
-
-
Rawaat Construction Company
-
Dubai, UAE
-
Autocad Operator
-
May 2010 - Jul 2010
DUTIES AND RESPONSIBILITIES: • Encodes AutoCad drawing requirements of interior projects of the Company from schematic to its final drawing • Prepares all the drawing requirements (interior, plans, sections, elevations and details) for approval given area. • Prepares all the necessary files used for the checking and final submission of the project to the client such as pdf files and cad files PROJECT INVOLVEMENT: • OCEAN HEIGHTS (MARSHA DUBAI UAE) DUTIES AND RESPONSIBILITIES: • Encodes AutoCad drawing requirements of interior projects of the Company from schematic to its final drawing • Prepares all the drawing requirements (interior, plans, sections, elevations and details) for approval given area. • Prepares all the necessary files used for the checking and final submission of the project to the client such as pdf files and cad files PROJECT INVOLVEMENT: • OCEAN HEIGHTS (MARSHA DUBAI UAE)
-
-
-
SIGMA Bear Inc.
-
Philippines
-
Autocad Rebar Detailer
-
Nov 2009 - May 2010
DUTIES AND RESPONSIBILITIES: • Analyze General Notes, drawing specifications, standard details and other documents of assigned projects. • Prepare and detail Structural rebar drawing based on the plans and specifications of the projects. • Ensure drawings comply with Specific Project Design Brief Instruction and all details are being carried out to SIGMA Bear Standards and QA Procedures. • Prepare and detail structures (beam, slab, column, wall, stair, pile cap) PROJECT INVOLVEMENT: • DOHA CONVENTION CENTER AND TOWER (DOHA, QATAR) • BARWA FINANCIAL DISTRICT (DOHA, QATAR) • MAJLIS OMAN (AL BUSTAN, MUSCAT Show less
-
-
-
Constrium Inc. Rebar Specialist
-
Philippines
-
Autocad Rebar Detailer
-
Oct 2008 - Oct 2009
DUTIES AND RESPONSIBILITIES: • Analyze General Notes, drawing specifications, standard details and other documents of assigned projects. • Prepare and detail Structural rebar drawing based on the plans and specifications of the projects. • Ensure drawings comply with Specific Project Design Brief Instruction and all details are being carried out to CONSTRIUM Standards and QA Procedures. • Prepare and detail structures (beam, slab, column, wall, stair, pile cap) PROJECT INVOLVEMENT: • YAS ISLAND DEVELOPMENT PROJECT FERRARI EXPERIENCE (DUBAI, U.A.E.) • SEWAGE TREATMENT PLANT AND RELATED COLLECTION AND IRRIGATION SYSTEMS (PALM ISLAND JUMEIRAH, DUBAI, U.A.E.) • I.T.E. COLLEGE WEST (BUKIT BATOK ROAD / CHOA CHU KANG WAY, SINGAPORE) • DOHA CONVENTION CENTER AND TOWER (DOHA, QATAR) • YAS ISLAND RETAIL SHOPPING MALL (DUBAI, U.A.E.) • AL-AIN WASTE WATER TREATMENT PLANT (ABU DHABI, U.A.E.) Show less
-
-
Education
-
Polytechnic University of the Philippines
Bachelor of Science (BS), Architecture -
Angono National High School
Secondary