Veeresh K S
Project Manager at AUTO-TEC ENGINEERING SERVICES- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
AUTO-TEC ENGINEERING SERVICES
-
India
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Jan 2021 - Present
BIW welding fixture design and development BIW welding fixture design and development
-
-
-
ABB
-
Azerbaijan
-
Banking
-
700 & Above Employee
-
Design Lead
-
Dec 2016 - Dec 2020
Development of Automation system for auto parts. Arc welding, Spot welding fixture development and prove-out. ABB Robot studio simulation. Planning and preparation of layout. Manufacturing and installation and commissioning . Development of Automation system for auto parts. Arc welding, Spot welding fixture development and prove-out. ABB Robot studio simulation. Planning and preparation of layout. Manufacturing and installation and commissioning .
-
-
-
-
Team Lead
-
Dec 2013 - Nov 2016
BIW Fixtures, EOAT, checking fixtures, gauges design.(Catia, Fides, Unigraphics) Layout Study,Planning, Weld cell generation. Good experience with automobile OEM's like Tata, Mahindra, Ford, Fiat, GM, BMW, Volvo car carporation, Volks Wagen. BIW Fixtures, EOAT, checking fixtures, gauges design.(Catia, Fides, Unigraphics) Layout Study,Planning, Weld cell generation. Good experience with automobile OEM's like Tata, Mahindra, Ford, Fiat, GM, BMW, Volvo car carporation, Volks Wagen.
-
-
-
-
Design Engineer
-
Dec 2011 - Dec 2013
Biw Fixtures design Design review. 2D QC Biw Fixtures design Design review. 2D QC
-
-
-
Toyotetsu
-
Motor Vehicle Manufacturing
-
300 - 400 Employee
-
Asst. Supervisor
-
Aug 2011 - Dec 2011
Producing BIW sub assemblies for TOYOTA MOTORS.Maintainance and development of welding fixture components. Manufaturing of welding jig equipments. Maintanance of welding fixture. Producing BIW sub assemblies for TOYOTA MOTORS.Maintainance and development of welding fixture components. Manufaturing of welding jig equipments. Maintanance of welding fixture.
-
-
-
-
Excctive Engineer
-
Oct 2010 - Oct 2010
Producing BIW sub assemblies for TOYOTA MOTORS.Manufacturing and development of welding fixtures. Prove out and cycle time analysis. Producing BIW sub assemblies for TOYOTA MOTORS.Manufacturing and development of welding fixtures. Prove out and cycle time analysis.
-
-
-
Stanzen toyotetsu
-
Machinery Manufacturing
-
1 - 100 Employee
-
Technical Staff
-
Dec 2006 - Aug 2010
Producing BIW sub assemblies for TOYOTA MOTORS.Manufacturing and development of welding fixtures. kaizen and poke yoke activities Producing BIW sub assemblies for TOYOTA MOTORS.Manufacturing and development of welding fixtures. kaizen and poke yoke activities
-
-
-
Indo-US MIM Tec Pvt.Ltd.
-
India
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Trainee tool maker
-
May 2005 - Aug 2006
Injection molding tool manufacture and maintainance Injection molding tool manufacture and maintainance
-
-