Vedat Şafak

Director at Advanced Design Solutions
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
West Midlands, England, United Kingdom, UK
Languages
  • English Full professional proficiency
  • Turkish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Member of the Institution of Civil Engineers (MICE), Chartered Civil Engineer
    Institution of Civil Engineers (ICE)
    Jun, 2013
    - Nov, 2024
  • Chartered Engineer (CEng)
    Engineering Council

Experience

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Director
      • May 2015 - Present

      After working with Morgan Sindall Underground Professional Services (today Morgan Sindall Engineering Solutions) as a senior design engineer in the last decade, now I would like to share my engineering knowledge and experience in the private market through my limited company. I have a wide range of experience obtained while working with major clients including National Grid, Thames Water, Crossrail and London Underground. I have been delivering design solution to Systra (previously TSP projects and Tata Steel Projects) on energy from waste plant projects. I was involved in Templeborough Biomass Plant and Avonmouth Energy Recovery Facility as the lead engineer. I currently also assist my previous company Morgan Sindall Engineering Solution as a part time contractor associate engineer. I delivered design and check solutions for various projects including Thames Tideway West, Acton Train Modification Unit, Werrington Grade Separation, Welsh Water Framework and many more. Refer to my CV from the link below for my career and project achievement history. Please visit www.adesol.co.uk for capabilities and contact details. Show less

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Associate Engineer
      • Apr 2018 - Present

      - MSES water sector lead responsible for budget and delivery for Dŵr Cymru Welsh Water AMP6 framework, - Various design solutions, advice and independent checks of permanent works for Thames Tideway Tunnel, West Section, - TBM shift review group (SRG) Werrington Grade Separation (WGS) chair for the dive-under tunnel. Also various design solutions and independent checks, - CAT3 check of the steelwork building, secondary steelwork and base slab for Acton Train Modification Unit, - Design, check and advice on various projects such as Old Street Roundabout Transformation, various tower crane foundations and geotechnical solutions. Show less

    • France
    • Engineering Services
    • 700 & Above Employee
    • Lead Engineer
      • May 2015 - Aug 2019

      I acted as the lead engineer for both projects 32 MW Avonmouth Energy Recovery Facility (ERF) and 41 MW Templeborough Biomass Power Plant with responsibility of technical, budget and programme aspects for . I delivered more than 30,000 m3 of reinforced concrete design with my team for Avonmouth ERF on time and on budget. https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ I acted as the lead engineer for both projects 32 MW Avonmouth Energy Recovery Facility (ERF) and 41 MW Templeborough Biomass Power Plant with responsibility of technical, budget and programme aspects for . I delivered more than 30,000 m3 of reinforced concrete design with my team for Avonmouth ERF on time and on budget. https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Design Engineer
      • Nov 2006 - May 2015

      I am specialised in design of permanent works including shafts, tunnels, underground structures, shaft portals, shaft base slabs, foundations, roof slabs, etc. to British Standards, Eurocodes and design guidance provided by CIRIA, Highway Agency, Concrete Centre and BRE. Whitechapel and Liverpool Street Station Tunnels, Contract C510, Crossrail: Assessment of existing historical structures such as Hammersmith & City Underground Line and various listed buildings in central London due to tunnelling settlement and excessive batching plant loads. Delivering design solutions to protect the structures. CATIII check of geotechnical designs of subcontractors. I am also the lead design engineer managing all temporary works. Lee Tunnel, Thames Water: 20 m diameter and 75 m deep shaft base slab design using Plaxis and SAP2000. Finite Element Analysis (FEA) support for structures with complex geometry and unusual load conditions. Analysing vibration effect of extremely big pumps mounted on the permanent works. Brixton to Honor Oak Tunnel, Ring Main Extension, Thames Water: Project Design Engineer (PDE) managing all permanent and temporary works including M&E interface. 24 permanent and 29 temporary works designs. Also 46 check certificates validating subcontractors’ works. Croydon Cable Tunnel, National Grid: Permanent works designs such as head house foundations and large underground structures. Sefton Drive Detention Shaft, United Utilities: Lead design engineer managing all permanent works. Other tunnelling projects I was involved: - Hendon to Colindale Cable Adit Extension, National Grid. Temporary works design. - Belfast Sewers Project, Northern Ireland Water. Temporary works check. - Hendon to Colindale Cable Adit Extension, National Grid. Temporary works design. - King’s Cross Underground Station Redevelopment Phase II, Metronet. Temporary works design. Show less

    • Project Manager & Health and Safety Advisor
      • Sep 2004 - Nov 2006

      As the project manager my primary responsibility was managing and leading the project team, detailing project planning and control, managing project deliverables in line with the construction programme, monitoring project progress and performance, providing status reports to the executive board and progressing final approval of the design. Examples of projects I managed during period: A Nine-classroom school for Turkish Ministry of Environment and Urbanization, Refurbishment of Bergama Archaeology Museum (Pergamon Museum) for Turkish Prime Ministry Directorate General of Foundations, restoration of historical buildings in Odunpazarı for Eskişehir Metropolitan Municipality and various RC buildings for the private market. I played the lead role during the company’s obtaining OHSAS (Occupational Health and Safety Assessment Series) and ISO 9001 certification. I also occupied the role of Health and Safety Advisor until I left the company prior to moving to England. Show less

    • Production Manager
      • Apr 2004 - Sep 2004

      I was responsible for the overall management of the steelwork factory, including recruiting staff, cost & pricing, detailing production planning and control, resolving cross-functional issues at production level, monitoring project progress & performance and working closely with users to ensure the production meets costumers’ needs. I was responsible for the overall management of the steelwork factory, including recruiting staff, cost & pricing, detailing production planning and control, resolving cross-functional issues at production level, monitoring project progress & performance and working closely with users to ensure the production meets costumers’ needs.

  • Toykan Plc
    • Izmir, Turkey
    • Contract & Bid Manager
      • Nov 2003 - Apr 2004

      I was responsible for submitting a completed bid to an existing or prospective client, on time and within budget. I was responsible for submitting a completed bid to an existing or prospective client, on time and within budget.

    • Project Manager
      • Jul 2002 - Nov 2003

      I was responsible for managing 22.000 m3/day waste water treatment plant construction, including civil works, mechanical and electrical installation in Izmir, Menemen Leather Free Zone in co-operation with supervisors of Danish Kruger A/S Company. I was responsible for managing 22.000 m3/day waste water treatment plant construction, including civil works, mechanical and electrical installation in Izmir, Menemen Leather Free Zone in co-operation with supervisors of Danish Kruger A/S Company.

    • Structural Engineer, self-employed
      • Jan 2000 - Jul 2002

      I produced structural designs and CAD drawings of RC and steel constructions to the private market as the civil & structural engineer in co-operation with architects, electrical and mechanical engineers while running my own business. I gained great seismic design experience during this period. I produced structural designs and CAD drawings of RC and steel constructions to the private market as the civil & structural engineer in co-operation with architects, electrical and mechanical engineers while running my own business. I gained great seismic design experience during this period.

    • Structural Engineer
      • Sep 1997 - Jan 2000

      The first step into the working life in the design office running by experienced architect Sedat Sığ (M.Arch.) I started to produce my first professional structural designs. I also gained invaluable site experience. The first step into the working life in the design office running by experienced architect Sedat Sığ (M.Arch.) I started to produce my first professional structural designs. I also gained invaluable site experience.

Education

  • Dokuz Eylül Üniversitesi
    BEng, Civil Engineering
    1995 - 1999
  • Dokuz Eylül Üniversitesi
    Architecture
    1993 - 1995
  • Buca Technical High School
    Computer Software & Hardware Technician, Computer Science
    1989 - 1993

Community

You need to have a working account to view this content. Click here to join now