Nallella Varun

Site Engineer at SD Group Au
  • Claim this Profile
Contact Information
Location
Harris Park, New South Wales, Australia, AU
Languages
  • English -
  • Hindi -
  • Telugu -
  • Kannada -

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Site Engineer
      • Feb 2018 - Present

    • Canada
    • Construction
    • 1 - 100 Employee
    • Site Engineer (Sydney)
      • May 2017 - Jan 2018

      Constructed G+5 residential Appartments at Gladsville, Nsw. Duties are: Organize and carry out engineering activities to ensure work activities are planned and arranged in advance of their target date. Adhering to budgets and KPI's. Piling, Anchoring, Shotcrete and I can manage the whole job site arranging manpower, materials etc. from sub structure to super structure. Having good knowledge in Civil Works. Establish and maintaining relationships with clients and trades. Ensuring our clients are regularly updated during the building process Managing paperwork to required deadlines. An absolute commitment to Safety, ensuring OH&S requirements and risk controls are considered in all construction planning and processes.

    • Site Engineer ( India)
      • Feb 2015 - Aug 2015

    • Construction
    • 400 - 500 Employee
    • Site Engineer (Africa)
      • Aug 2014 - Feb 2015

    • India
    • Real Estate
    • 700 & Above Employee
    • Planning Engineer (India)
      • Jan 2014 - Aug 2014

      Project Scheduling and Tracking the project, identifying the critical issues, master quantity calculation for various quantities, materials raising through ERP and co- ordination with all other departments regarding the progress of the work etc... Project Scheduling and Tracking the project, identifying the critical issues, master quantity calculation for various quantities, materials raising through ERP and co- ordination with all other departments regarding the progress of the work etc...

    • site engineer (India)
      • Jul 2013 - Jan 2014

      Checking of layout and setting out of buildings with respect to existing structures and site levels. To watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities. Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant Checking of layout and setting out of buildings with respect to existing structures and site levels. To watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities. Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant

Education

  • University of Technology Sydney
    Master, Project Management
    2015 - 2017
  • SR Engineering college warangal
    Bachelor of Technology (B.Tech.), CIVIL ENGINEER
    2009 - 2013
  • All saint's High School
    ssc, secondary school of certificate
    1993 - 2007

Community

You need to have a working account to view this content. Click here to join now