Valeriy Kondratyev
Lifting & Rigging Superintendent at PETROFAC FACILITIES MANAGEMENT LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Veniamin Nozhkin
Valeriy is a strong, task- and result-oriented engineer finding common grounds with his subordinates. Always fulfills his tasks perfectly safe and with minimum expenses. Enjoys great respect of his colleagues.
Veniamin Nozhkin
Valeriy is a strong, task- and result-oriented engineer finding common grounds with his subordinates. Always fulfills his tasks perfectly safe and with minimum expenses. Enjoys great respect of his colleagues.
Veniamin Nozhkin
Valeriy is a strong, task- and result-oriented engineer finding common grounds with his subordinates. Always fulfills his tasks perfectly safe and with minimum expenses. Enjoys great respect of his colleagues.
Veniamin Nozhkin
Valeriy is a strong, task- and result-oriented engineer finding common grounds with his subordinates. Always fulfills his tasks perfectly safe and with minimum expenses. Enjoys great respect of his colleagues.
Experience
-
PETROFAC FACILITIES MANAGEMENT LIMITED
-
United Kingdom
-
1 - 100 Employee
-
Lifting & Rigging Superintendent
-
Oct 2018 - Present
-Review, approval and Participation in the development of the Lifting plan, Method Statement, Process Charts for lifting various loads and Heavy lifting. - Issuance of recommendations for the safe lifting of loads and crane operation. - Consideration of Permit to Works (PTW) with cranes. - Supervision of the safe installation of equipment and structures in the design position. Instruct on the safe use of lifting gear. - Control over the performance of the contractor and subcontractor of the correct and safe conducting work with lifting mechanism and rigging equipment according safety rules and corporate procedure from Company. - Participation in meetings with the client and subcontractor to discuss work planning and safety work. - Participation in the safety program "Goal Zero" from SEIC and "Horizon Zero" from Petrofac. Show less
-
-
-
South Tambey LNG
-
Construction
-
1 - 100 Employee
-
Static & Rotating Equipment Supervisor
-
Sep 2016 - Oct 2018
Supervision of: - static and rotating equipment installation by Subcontractors: Vessels, Bullets, Separators, Generators, Modules, Fixed Roof Tanks - Installation and inspection of bridge cranes (STAHL, 50 t.) according to the vendor documentation. Carrying a load test for static and dynamics. - Miscellaneous structural steel installation (Flare derricks, pipe racks etc.), - Installation of BOG (Boil off Gas) compressor equipment skids (motor, gear box, LP compressor, HP compressor) as per project documentation. - Installation of dry gas seals, bearings and other elements for starting HP (high pressure) and LP (low pressure) compressors according to Vendor documentation (SIEMENS). - Shaft alignment of equipment using a laser device "Rotaling Ultra" (Compressor train: motor - GB (gear box) - LP compressor - HP compressor). - Tightening of bolted and flanged connections (equipment, inlet and outlet pipes). - Area surface preparation for static equipment installation: Access ways, foundations, pilecaps. Coordination of any types of working activities with contractor and subcontractors for timely and safe completion. PTW (permits to work) reviewing, endorsing, authorizing and signing. Verification of lifting plans for safe installation of equipment in the design position. Everyday site inspections to ensure that works are being done in a strict accordance with Project Design, PTW (permits to work) and Company’s Safety Rules and Regulations. Ensuring site operatives are aware of risks and hazards. Show less
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Construction Representative
-
Jun 2014 - Jul 2016
Reviewing and approval of the work-permits. Organization and coordination of works with contractor’s representatives. Close cooperation with contractors to ensure efficient and safe coordination of simultaneous operations (SIMOPS). Ensuring compliance with special work procedures (civil, mechanical, painting, welding, and coating). Reviewing and approval of the Lifting plans for installation equipment’s and structures. Ensuring that all rotation and static equipment is installed in strict accordance with Project requirements (valves, pumps, vessels, generators etc.) in safest way and timely manner. Participating in inspections, signing check sheets as per Inspection and Test Plans (ITP). Ensuring quality of works performed by contractors and subcontractors. Review and signing related documentation. Show less
-
-
Piping & Mechanical Supervisor
-
Jun 2013 - Jun 2014
Tank farm extension within the frameworks of CPC (Caspian Pipeline Consortium) project:Monitoring and supervising all stages of subcontractors’ works related to equipment installation, process piping of 100 000 m3 tanks; ensuring that works are completed as per work plan. Ensuring safety compliance of contractors and subcontractors. Ensuring that completed works comply with design documentation and standards (participating in inspection commissions for receiving inspection of materials and equipment, inspecting work stages). Ensuring compliance with work-permits. Attending meetings with contractors and subcontractors. Making daily reports. Making all required documentation as per company procedures. Show less
-
-
-
ECC-VECO
-
Civil Engineering
-
1 - 100 Employee
-
Maintenance supervisor
-
Jan 2012 - Jun 2013
Maintenance and modification of primary oil refining plant and administrative buildings at the SBP "Odoptu" within the project "Sakhalin - 1" (project title: Maintenance Supervisor):Organization and management of the production process and its control. Maintain required documentation. Conducting negotiations with the customer. A prompt solving of issues. Preparation and issue the permits in the electronic system EPTW ENL, as work on the electronic system at work tasks SAP (IPES).
-
-
Construction superintendent
-
Jan 2011 - Jan 2012
Repair works at the pipeline "Odoptu-Chayvo" in Piltun bay and onshore within the project "Sakhalin - 1" (project title: Construction Superintendent ):Organization and management of the production process and its control. Negotiation and communication with contractors. Maintain required documentation. Opening the pipeline under pressure. Laying the pipeline in the current project position with well pumps. Ballast piping. Sakhalin-1 Project Arkutun-Dagi Produced water injection pipeline construction (project title: Construction Superintendent, 2010- up to current date): Double joint pipe stringing at ROW. Trenching, trench bottom preparation, pipe lowering-in and pipeline backfilling. Soil excavation above and underneath live oil and gas pipelines for pipeline crossing with live pipelines and utilities. Live pipeline heavy haul crossing arrangement. Lifting operations. ROW soil reclamation. Show less
-
-
Construction supervisor
-
Sep 2008 - Jan 2011
Sakhalin-1 Project Odoptu North Well Site Initial Water Separation Unit Construction (project title: Riggin Supervisor, 2009-2010): Module assembling. Different level complexity structural steel installation. Different OD Process pipeline flange connection installation. Vessels (volume up to 50m3), generators, pumps, valves and block valves installation. Installation of modules and piperacks of different length (10-25 meters). Different level complexity lifting operations (MAXIMUM WEIGHT -137 TONS). Calculation and assembly of rigging equipment for lifting loads of varying complexity. Lifting plan development. Sakhalin-1 Project Pipeline OPF Chayvo-NWS Odoptu Construction (project title: Pipeline Supervisor, 2008-2009): ROW preparation. Oil pipeline ROW pipe stringing. Trenching, trench bottom preparation, pipe lowering-in, erosion control blanket arrangement, pipeline backfilling. Oil pipeline crossing arrangement. Informative sign installation at ROW. Technical reclamation. Water crossing 10 km in length (Piltun Bay). Show less
-
-
-
Leasing stroy masch
-
Sakhalin
-
Construction supervisor
-
Sep 2004 - Sep 2008
Sakhalin-2 Oil and Gas Pipeline construction: Building and facility construction. (Canadian Module, frame-filling buildings, skid buildings, etc.) ROW preparation. Trenching, trench bottom preparation, erosion control blanket arrangement, pipeline backfilling. ROW and temporary access road construction, repair and maintenance. Construction of pipeline crossing with uncategorized unpaved roads. Work with the lifting equipment. Erosion control. Biological and technical reclamation. Stone quarry operations for rock digging, gravel production (grinding-sorting facility) Show less
-
-
Education
-
Far East Railway State University
Engineer's degree, Mechanical Engineering