Valerio Facca
Expert Estimating & Methods at Webuild- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Italiano Native or bilingual proficiency
-
Spagnolo Full professional proficiency
-
Inglese Full professional proficiency
Topline Score
Bio
Experience
-
Webuild
-
Italy
-
Construction
-
700 & Above Employee
-
Expert Estimating & Methods
-
Jun 2022 - Present
-
-
-
SELI OVERSEAS S.p.A.
-
Italy
-
Civil Engineering
-
200 - 300 Employee
-
TBM Technical Manager
-
Nov 2020 - Jun 2022
Geotechnical supervisor of CEPAV2 Lonato Tunnel excavation with CREG EPB TBM d=10.05 m
-
-
TBM Technical Manager
-
Sep 2017 - Nov 2020
COCIV, Geotechnical supervisor for Serravalle tunnel. Excavation using no.2 HK TBM/EPB d=9.74 m
-
-
-
SELI OVERSEAS S.p.A.
-
Italy
-
Civil Engineering
-
200 - 300 Employee
-
TBM Senior Consultant
-
Jan 2017 - Jun 2017
TBM geotechnical consultant for ENEL/Endesa Los Condores Hydroelectric project
-
-
TBM Technical Manager
-
Jul 2016 - Jan 2017
COCIV, Geotechnical supervisor for Serravalle tunnel. Excavation using no.2 HK TBM/EPB d=9.74 m
-
-
-
SELI S.p.A.
-
Italy
-
Civil Engineering
-
1 - 100 Employee
-
TBM Technical Manager
-
Feb 2015 - Jul 2016
Gold Line Metro :Surface & Support Engineer– Site Manager DOHA, GOLD LINE METRO: Excavation of no.2 tunnels (7,5 Km total lenght) from Al Soudan Stadium to Villagio Mall with n°2 HERRENKNECHT TBM EPB (⌀=7,15 m). Gold Line Metro :Surface & Support Engineer– Site Manager DOHA, GOLD LINE METRO: Excavation of no.2 tunnels (7,5 Km total lenght) from Al Soudan Stadium to Villagio Mall with n°2 HERRENKNECHT TBM EPB (⌀=7,15 m).
-
-
-
SELI Technologies
-
Ecuador
-
Site Manager
-
May 2014 - Dec 2014
Techincal Service; Assembly and test boring of a TBM Universal Double Shield (d=5,67 m) inside the "Minas-San Francisco Hydroelectric project" Techincal Service; Assembly and test boring of a TBM Universal Double Shield (d=5,67 m) inside the "Minas-San Francisco Hydroelectric project"
-
-
-
SELI S.p.A.
-
Volcan, Panama
-
Assistent Site Manager - Engineering Geologist
-
Jan 2013 - May 2014
Geotechnical supervision of the excavation with TBM (EPB) of two tunnels (8,0 and 5,5 km long) and of two piezometric shafts construction within the hydroelectric projects “Pando, El Alto y Monte Lirio” (Volcàn, Chiriqui region, Panama). Data processing of post-excavation works (such as secondary groutings) and timetable designer. Testing construction materials. Geotechnical supervision of the excavation with TBM (EPB) of two tunnels (8,0 and 5,5 km long) and of two piezometric shafts construction within the hydroelectric projects “Pando, El Alto y Monte Lirio” (Volcàn, Chiriqui region, Panama). Data processing of post-excavation works (such as secondary groutings) and timetable designer. Testing construction materials.
-
-
-
Iphi - Sistemi Ecoambientali S.r.l.
-
Roma, Italia
-
Geologist - Technical Internal Coordinator
-
Jul 2011 - Jan 2013
Geological studies for the prevention of the hydrogeological risk. Preliminary inspections and design of photovoltaic plants; supervision of worksite safety during the installations of photovoltaic systems; certification of energy performance of the buildings. Geological studies for the prevention of the hydrogeological risk. Preliminary inspections and design of photovoltaic plants; supervision of worksite safety during the installations of photovoltaic systems; certification of energy performance of the buildings.
-
-
-
NHAZCA S.r.l.
-
Italy
-
Environmental Services
-
1 - 100 Employee
-
Engineering Geologist
-
Apr 2011 - Oct 2011
Remote Rock mass Monitoring trough Radar Interferometry Remote Rock mass Monitoring trough Radar Interferometry
-
-
-
Consorzio Tre Esse
-
Perugia, Italia
-
Geologist
-
Mar 2010 - Apr 2011
Geotechnical monitoring/ Tunneling Geotechnical monitoring/ Tunneling
-
-
-
Consorzio TreEsse
-
Roma, Italia
-
Engineering Geologist
-
Mar 2009 - Feb 2010
• Structural monitoring for the Rome (Italy) subway, line B1 Jonio street-Bologna square route, during the construction phase, as “geomechanical technic”. Activities executed: inclinometer, piezometer and Settlement gauge measurement, installation of strain gauges; elaboration and data processing. Slurry Walls of the Rome subway line B1 “Jonio square” “Conca D’Oro square” and “Libia street” station. • Quality control of all equipment installed in the various galleries • Structural monitoring for the Rome (Italy) subway, line B1 Jonio street-Bologna square route, during the construction phase, as “geomechanical technic”. Activities executed: inclinometer, piezometer and Settlement gauge measurement, installation of strain gauges; elaboration and data processing. Slurry Walls of the Rome subway line B1 “Jonio square” “Conca D’Oro square” and “Libia street” station. • Quality control of all equipment installed in the various galleries
-
-
-
ISTEDIL
-
Roma, Italia
-
Geologist
-
Feb 2009 - Mar 2009
Geotechnical Laboratory stagist Geotechnical Laboratory stagist
-
-
-
-
Salesman
-
Jun 2007 - Jul 2007
20 hours/week inside Puma Shop located in via del Corso 20 hours/week inside Puma Shop located in via del Corso
-
-
-
GameStop
-
United States
-
Retail
-
700 & Above Employee
-
Salesman
-
Dec 2006 - Jan 2007
16 hours/week) inside Gamestop Shop located in "Dima shopping", located in "via della Bufalotta" 16 hours/week) inside Gamestop Shop located in "Dima shopping", located in "via della Bufalotta"
-
-
Education
-
University of Rome
Master's degree, Engineering Geotechnic -
University of Rome
Bachelor of Applied Science (B.A.Sc.), Geology/Earth Science, General