Valerio Facca

Expert Estimating & Methods at Webuild
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Milan, Lombardy, Italy, IT
Languages
  • Italiano Native or bilingual proficiency
  • Spagnolo Full professional proficiency
  • Inglese Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Italy
    • Construction
    • 700 & Above Employee
    • Expert Estimating & Methods
      • Jun 2022 - Present

    • Italy
    • Civil Engineering
    • 200 - 300 Employee
    • TBM Technical Manager
      • Nov 2020 - Jun 2022

      Geotechnical supervisor of CEPAV2 Lonato Tunnel excavation with CREG EPB TBM d=10.05 m

    • TBM Technical Manager
      • Sep 2017 - Nov 2020

      COCIV, Geotechnical supervisor for Serravalle tunnel. Excavation using no.2 HK TBM/EPB d=9.74 m

    • Italy
    • Civil Engineering
    • 200 - 300 Employee
    • TBM Senior Consultant
      • Jan 2017 - Jun 2017

      TBM geotechnical consultant for ENEL/Endesa Los Condores Hydroelectric project

    • TBM Technical Manager
      • Jul 2016 - Jan 2017

      COCIV, Geotechnical supervisor for Serravalle tunnel. Excavation using no.2 HK TBM/EPB d=9.74 m

    • Italy
    • Civil Engineering
    • 1 - 100 Employee
    • TBM Technical Manager
      • Feb 2015 - Jul 2016

      Gold Line Metro :Surface & Support Engineer– Site Manager DOHA, GOLD LINE METRO: Excavation of no.2 tunnels (7,5 Km total lenght) from Al Soudan Stadium to Villagio Mall with n°2 HERRENKNECHT TBM EPB (⌀=7,15 m). Gold Line Metro :Surface & Support Engineer– Site Manager DOHA, GOLD LINE METRO: Excavation of no.2 tunnels (7,5 Km total lenght) from Al Soudan Stadium to Villagio Mall with n°2 HERRENKNECHT TBM EPB (⌀=7,15 m).

    • Site Manager
      • May 2014 - Dec 2014

      Techincal Service; Assembly and test boring of a TBM Universal Double Shield (d=5,67 m) inside the "Minas-San Francisco Hydroelectric project" Techincal Service; Assembly and test boring of a TBM Universal Double Shield (d=5,67 m) inside the "Minas-San Francisco Hydroelectric project"

  • SELI S.p.A.
    • Volcan, Panama
    • Assistent Site Manager - Engineering Geologist
      • Jan 2013 - May 2014

      Geotechnical supervision of the excavation with TBM (EPB) of two tunnels (8,0 and 5,5 km long) and of two piezometric shafts construction within the hydroelectric projects “Pando, El Alto y Monte Lirio” (Volcàn, Chiriqui region, Panama). Data processing of post-excavation works (such as secondary groutings) and timetable designer. Testing construction materials. Geotechnical supervision of the excavation with TBM (EPB) of two tunnels (8,0 and 5,5 km long) and of two piezometric shafts construction within the hydroelectric projects “Pando, El Alto y Monte Lirio” (Volcàn, Chiriqui region, Panama). Data processing of post-excavation works (such as secondary groutings) and timetable designer. Testing construction materials.

    • Geologist - Technical Internal Coordinator
      • Jul 2011 - Jan 2013

      Geological studies for the prevention of the hydrogeological risk. Preliminary inspections and design of photovoltaic plants; supervision of worksite safety during the installations of photovoltaic systems; certification of energy performance of the buildings. Geological studies for the prevention of the hydrogeological risk. Preliminary inspections and design of photovoltaic plants; supervision of worksite safety during the installations of photovoltaic systems; certification of energy performance of the buildings.

    • Italy
    • Environmental Services
    • 1 - 100 Employee
    • Engineering Geologist
      • Apr 2011 - Oct 2011

      Remote Rock mass Monitoring trough Radar Interferometry Remote Rock mass Monitoring trough Radar Interferometry

  • Consorzio Tre Esse
    • Perugia, Italia
    • Geologist
      • Mar 2010 - Apr 2011

      Geotechnical monitoring/ Tunneling Geotechnical monitoring/ Tunneling

  • Consorzio TreEsse
    • Roma, Italia
    • Engineering Geologist
      • Mar 2009 - Feb 2010

      • Structural monitoring for the Rome (Italy) subway, line B1 Jonio street-Bologna square route, during the construction phase, as “geomechanical technic”. Activities executed: inclinometer, piezometer and Settlement gauge measurement, installation of strain gauges; elaboration and data processing. Slurry Walls of the Rome subway line B1 “Jonio square” “Conca D’Oro square” and “Libia street” station. • Quality control of all equipment installed in the various galleries • Structural monitoring for the Rome (Italy) subway, line B1 Jonio street-Bologna square route, during the construction phase, as “geomechanical technic”. Activities executed: inclinometer, piezometer and Settlement gauge measurement, installation of strain gauges; elaboration and data processing. Slurry Walls of the Rome subway line B1 “Jonio square” “Conca D’Oro square” and “Libia street” station. • Quality control of all equipment installed in the various galleries

  • ISTEDIL
    • Roma, Italia
    • Geologist
      • Feb 2009 - Mar 2009

      Geotechnical Laboratory stagist Geotechnical Laboratory stagist

    • Salesman
      • Jun 2007 - Jul 2007

      20 hours/week inside Puma Shop located in via del Corso 20 hours/week inside Puma Shop located in via del Corso

    • United States
    • Retail
    • 700 & Above Employee
    • Salesman
      • Dec 2006 - Jan 2007

      16 hours/week) inside Gamestop Shop located in "Dima shopping", located in "via della Bufalotta" 16 hours/week) inside Gamestop Shop located in "Dima shopping", located in "via della Bufalotta"

Education

  • University of Rome
    Master's degree, Engineering Geotechnic
    2003 - 2008
  • University of Rome
    Bachelor of Applied Science (B.A.Sc.), Geology/Earth Science, General
    2002 - 2008

Community

You need to have a working account to view this content. Click here to join now