Uğur Erdim
Senior Material Planning Specialist at Autoliv Türkiye- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
NEGOTIATION AND PERSUASION TECHNIQUES
İzgören AkademiFeb, 2019- Oct, 2024 -
CONFLICT MANAGEMENT
İzgören AkademiJun, 2018- Oct, 2024 -
EFFECTIVE PRESENTATION TECHNIQUES
İzgören AkademiJul, 2017- Oct, 2024 -
STRESS MANAGEMENT
İzgören AkademiMar, 2016- Oct, 2024 -
EFFECTIVE COMMUNICATION
İzgören AkademiMay, 2015- Oct, 2024 -
TIME MANAGEMENT EDUCATION
İzgören AkademiApr, 2014- Oct, 2024 -
5 - S EDUCATION
Autoliv TürkiyeApr, 2013- Oct, 2024 -
8-D METHOD EDUCATION
Autoliv TürkiyeApr, 2013- Oct, 2024 -
PROBLEM SOLVING TECHNIQUES EDUCATION
Autoliv TürkiyeApr, 2013- Oct, 2024 -
LEAN MANUFACTURING SYSTEMS EDUCATION
Autoliv TürkiyeMar, 2013- Oct, 2024 -
PROCESS MANAGEMENT EDUCATION
Imes EğitimOct, 2012- Oct, 2024 -
ISO9001:2008 QUALITY MAN.SYS.ISO 14000:2004 ENVIRONMENTAL SYS.OHSAS 18001:2007 OCCUPATIONAL SAFETY MAN. SYS .INTERNAL AUDITOR CERTIFICATE
Bureau Veritas GroupSep, 2012- Oct, 2024 -
ISO9001:2008 QUALITY MAN.SYS.ISO 14000:2004 ENVIRONMENTAL SYS.OHSAS 18001:2007 OCCUPATIONAL SAFETY MAN. SYS . EDUCATION
Bureau Veritas GroupAug, 2012- Oct, 2024 -
TIME MANAGEMENT EDUCATION
Egitim AkademiMay, 2012- Oct, 2024 -
PROBLEM SOLVING TECHNIQUES EDUCATION
Turkua DanışmanlıkMar, 2012- Oct, 2024 -
TRAINING CERTIFICATE
Hyundai RotemFeb, 2008- Oct, 2024 -
HEAD MACHINE TRAINING COURSE
Faccin Srl.Dec, 2006- Oct, 2024
Experience
-
Autoliv Türkiye
-
Türkiye
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Senior Material Planning Specialist
-
Mar 2013 - Present
• Place orders to suppliers to meet production requirements. • Get order confirmations from suppliers (A total of 48 suppliers,42 of which are abroad and 6 of domestic, and 325 different raw material references are under control) • Follow the shipment during transportation and in customs until customs clearance is done and ensure that the correct materials have existed in stock in the required timeframe. • Transportation management. • Optimize raw material stock levels based on targets. • Manage a warehouse team of 9 staff (1 white collar + 8 blue collars) responsible for good reception. • Provide info flow and coordination between suppliers, purchase department, customer planner, and production planner in case of material requirement changes. • Measure supplier on-time delivery performances. • Prepare KPI reports (inventory, DOH, inventory turnover rate, on-time delivery, premium freight). • Manage material planning process in coordination with the project/sales team for newly commissioned and finalized projects and take necessary actions to prevent obsolete materials. Selected Accomplishments • Reduced transportation costs by changing shipping companies and types for Romania and Germany shipments (yearly 140 k euro cost saving). • Reduced packaging costs by increasing pallet unit load (yearly 128 k euro cost saving). • Optimized raw material stock level and eliminated external warehouse usage + transport costs between external warehouse and factory (yearly 60k euro cost saving). • Performed space optimization and reduced set-up durations by increasing coil weights used in the production line (yearly 5200 Man Hour saving). • Performed barcode & 2D barcode implementation on supplier labels, eliminated manual operations, and improved traceability (yearly 750 Man Hour saving). • Started implementation of ASN by suppliers, eliminated manual operations, improved traceability (yearly 750 Man Hour saving). Show less
-
-
-
-
Material Planning Engineer
-
Aug 2007 - Mar 2013
• Scheduled supply of materials to meet production requirements. • Got order confirmations from suppliers (A total of 40 suppliers, 36 of which are abroad and 4 of domestic, and 270 different raw material references were under control) • Ensured that the correct materials existed in stock in the required timeframe. • Optimized inventory based on targets. • Managed supplier on-time delivery performances. • Took necessary actions to prevent obsolete materials at the end of the project. • Managed a warehouse (2500 sqm) team of 8 staff (2 white collars + 6 blue collars). Selected Accomplishments • Started placing orders to suppliers by running MRP via ERP system instead of using excel or mail (yearly 800 Man Hour saving). • Reduced stock level by 5 % and performed space optimization. • Performed barcode & 2D barcode implementation on supplier labels, eliminated manual operations, and improved traceability (yearly 600 Man Hour saving). • Started implementation of ASN by suppliers, eliminated manual operations, improved traceability (yearly 600 Man Hour saving). Show less
-
-
-
TIRSAN Treyler A.S.
-
Türkiye
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Production Engineer
-
Sep 2006 - Aug 2007
• Controlled the production process of tankers according to the production plan. • Prepared CNC program for plasma cutting machine. • Followed material feeding process between warehouse and production line. • Followed production process of heads with head press machine. • Controlled the production process of tankers according to the production plan. • Prepared CNC program for plasma cutting machine. • Followed material feeding process between warehouse and production line. • Followed production process of heads with head press machine.
-
-
-
YILGENCİ TR
-
Türkiye
-
Mining
-
1 - 100 Employee
-
Production Engineer
-
Apr 2006 - Sep 2006
• Prepared CNC programs for laser and plasma cutting machines. • Controlled production process according to the production plan. • Prepared CNC programs for laser and plasma cutting machines. • Controlled production process according to the production plan.
-
-
Education
-
Sakarya Üniversitesi
Lisans Derecesi, Makine Mühendisliği