Utami Sastramihardja
Business Development Group Lead at PT Medco Energi Mining Internasional- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT MEMI
-
Indonesia
-
Mining
-
1 - 100 Employee
-
Business Development Group Lead
-
Nov 2020 - Present
-
-
-
GreenGold Technology
-
Indonesia
-
Mining
-
1 - 100 Employee
-
Process Engineer
-
Nov 2019 - Nov 2020
-
-
-
Australia Awards
-
Australia
-
Government Relations Services
-
1 - 100 Employee
-
Australia Award Scholar
-
Jan 2018 - Aug 2019
-
-
-
Newmont Mining Corporation
-
West Nusa Tenggara Province, Indonesia
-
Metallurgist
-
Jul 2015 - Dec 2017
- Daily monitoring of Primary Crushing, SAG and Ball Mills, Pebble Crusher, and Classification circuit performance. - Troubleshooting plant performance issues. - Responsible and fully involved in projects: pebble crusher utilization, classification particle analysis, improvement of ball charge analysis, and more from the technical to economic analysis to increase the production by 2.5%. - Daily monitoring of Primary Crushing, SAG and Ball Mills, Pebble Crusher, and Classification circuit performance. - Troubleshooting plant performance issues. - Responsible and fully involved in projects: pebble crusher utilization, classification particle analysis, improvement of ball charge analysis, and more from the technical to economic analysis to increase the production by 2.5%.
-
-
-
PT. J Resources Nusantara
-
Indonesia
-
Mining
-
200 - 300 Employee
-
Metallurgist
-
Oct 2014 - Jul 2015
- Maintain Key Performance Indicator (KPI) of the gold leaching process (Heap Leach method) such as application rate, wobbler spacing, particle size, pH, reagent concentration, and flow to vessel. - Responsible for the metallurgical accounting and reporting (daily, weekly, and monthly). - Coordinate with other department such as mining and geology to control the production from geometallurgy aspect. - Maintain Key Performance Indicator (KPI) of the gold leaching process (Heap Leach method) such as application rate, wobbler spacing, particle size, pH, reagent concentration, and flow to vessel. - Responsible for the metallurgical accounting and reporting (daily, weekly, and monthly). - Coordinate with other department such as mining and geology to control the production from geometallurgy aspect.
-
-
-
PT MEMI
-
Indonesia
-
Mining
-
1 - 100 Employee
-
Project Metallurgist
-
Dec 2013 - Jun 2014
Team member of due diligence for acquisition of nickel laterite project: - Analyse data for nickel prospect. - Compose a feasibility report based on the technical, economical, and commercial aspects. - Propose financial analysis model for the project. - Present the report to the team and give recommendations. Team member of due diligence for acquisition of nickel laterite project: - Analyse data for nickel prospect. - Compose a feasibility report based on the technical, economical, and commercial aspects. - Propose financial analysis model for the project. - Present the report to the team and give recommendations.
-
-
-
Barrick Gold Corporation
-
Canada
-
Mining
-
700 & Above Employee
-
Metallurgist Intern
-
Nov 2012 - Oct 2013
- CIL, grinding, milling, flotation, and calcine’s technician. My roles involved sampling, analysing and controlling the quality of the process. - Compose a project report on CIL tails treatment using hydrogen peroxide under the Plant Metallurgist guidance by conducting cyanide detoxification in laboratory and plant trial using hydrogen peroxide. - In charge of daily check and maintenance of WAD Cyanide analyser. - CIL, grinding, milling, flotation, and calcine’s technician. My roles involved sampling, analysing and controlling the quality of the process. - Compose a project report on CIL tails treatment using hydrogen peroxide under the Plant Metallurgist guidance by conducting cyanide detoxification in laboratory and plant trial using hydrogen peroxide. - In charge of daily check and maintenance of WAD Cyanide analyser.
-
-
-
Integra Mining Limited
-
Kalgoorlie
-
Metallurgist Intern
-
Jun 2012 - Jul 2012
* Leaching and adsorption tanks operator at the first 2 weeks. My roles included sampling and checked the flow of the slurry, pH, and cyanide percentage in the tanks. * Done the Plant Metallurgist’s project work by writing a report about renovating and running on-site lab based on economic feasibility studies and equipments selection of Aqua Regia assaying gold method. * Help the Plant Metallurgist doing the metallurgical accounting. * Leaching and adsorption tanks operator at the first 2 weeks. My roles included sampling and checked the flow of the slurry, pH, and cyanide percentage in the tanks. * Done the Plant Metallurgist’s project work by writing a report about renovating and running on-site lab based on economic feasibility studies and equipments selection of Aqua Regia assaying gold method. * Help the Plant Metallurgist doing the metallurgical accounting.
-
-
-
PT MEMI
-
Indonesia
-
Mining
-
1 - 100 Employee
-
Metallurgist Intern
-
Dec 2011 - Feb 2012
My roles included checked the coal quality control especially in the sizing distribution and calculate the best range of coal size distribution by plotting Rossin-Ramler graphic (RRB). My roles included checked the coal quality control especially in the sizing distribution and calculate the best range of coal size distribution by plotting Rossin-Ramler graphic (RRB).
-
-
Education
-
UNSW
Master of Mining Engineering, Mine Management -
Curtin University
Bachelor of Engineering (B.Eng.), Metallurgical Engineering -
University of Indonesia
Bachelor of Engineering (B.Eng.), Metallurgy