Usman Ali Khan
QA/QC Mechanical Engineer at Webuild- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Professional Mechanical Engineer
Engineers AustraliaNov, 2022- Nov, 2024 -
Registered Mechanical Engineer
Pakistan Engineering Council (PEC)Jul, 2017- Nov, 2024 -
Mechanical Engineer
Saudi Council of Engineers
Experience
-
Webuild
-
Italy
-
Construction
-
700 & Above Employee
-
QA/QC Mechanical Engineer
-
Jul 2018 - Present
Reviewing/developing Inspection and Test Plans and relevant QC forms to be implemented on-site or off-site • Review and familiarize with the Method Statements and ITPs requirements • Review construction drawings and ensure latest approved drawings are followed Conducting and participation of pre-inspection meetings with client and Vendors and formulating the ways of inspection at par with the approved inspection test plan • Review of Inspection & Test Plan, Material verification, all stages of inspection, Dimensional inspection, Welding inspection, Final visual & painting inspectio • Inspection of raw material as per procurement order (P.O.) and reviewing of mill test certificate (MTC) and related procurement documents for traceability and conformance to mechanical /Chemical properties in accordance with applicable Codes & standard like ASTM, ASME • Inspection of the fit-ups in the in-process stage with respect to visual, dimensional and orientation compliance as per the approved drawings and specifications. •Inspection to Installation of Mechanical system for Sewage Treatment plant i.e Submersible Pump and Mixers, Grit classifier, Penstocks, Air diffusers, Cholorniation Tanks, Biological Tanks, Air Blowers and Sludge Holding Tank. •Inspection to Installation of Ductile Iron pipe & Fittings, Gaskets, Puddle Flanges, Pipe Supports, Bolt Anchoring, Flow controll Valves with Mechanical Systems. •Inspection of water supply and distribution pipes, Sewerage and Storm pipes, inspection Chamber and Manholes • Control of welding process as per applicable WPS & PQR requirements. Have been experienced and well versed with the codes like AWS D1.1, ASME Section IX. Monitoring and expedition of NDT requirements. Review of Weld Map, Welding Schedule. • Carrying out welding inspection of all kinds of structures, with the special interest in Heavy steel structures, Storage tanks, Ducting, critical crane components etc. as per the related applicable codes. Show less
-
-
-
Cem Estero S.p.A.
-
Italy
-
Construction
-
1 - 100 Employee
-
QA/QC ENGINEER
-
Jan 2018 - Jul 2018
• Conducting and participation of pre-inspection meetings with client and Vendors and formulating the ways of inspection at par with the approved inspection test plan • Review of Inspection & Test Plan, Material verification, all stages of inspection, Dimensional inspection, Welding inspection, Final visual & painting inspectio • Inspection of raw material as per procurement order (P.O.) and reviewing of mill test certificate (MTC) and related procurement documents for traceability and conformance to mechanical /Chemical properties in accordance with applicable Codes & standard like ASTM, ASME • Inspection of the fit-ups in the in-process stage with respect to visual, dimensional and orientation compliance as per the approved drawings and specifications • Control of welding process as per applicable WPS & PQR requirements. Have been experienced and well versed with the codes like AWS D1.1, ASME Section IX. Monitoring and expedition of NDT requirements. Review of Weld Map, Welding Schedule. • Carrying out welding inspection of all kinds of structures, with the special interest in Heavy steel structures, Storage tanks, Ducting, critical crane components etc. as per the related applicable codes and have been well experienced. Show less
-
-
-
Descon Engineering Limited
-
Pakistan
-
Education
-
700 & Above Employee
-
QA/QC ENGINNER
-
Dec 2015 - Dec 2017
• Blasting and painting inspection of various Fabricated products by using magnetic dry film gauge and calibrating with the approved / standard DFT gauges during blasting, priming, mid and final coat stages and maintaining the records for all the stages of inspection. • Blasting and Painting equipment conditions are monitored and Painting instrument working condition and calibration date keep in updating, Maintained relevant documents in quality manner at all times. • Before blasting and Painting environmental conditions were checked and verified and recorded,(Surface temperature, Air temperature ,Dew point and RH% ) Before blasting surface conditions were checked, after blasting surface preparation cleanness were checked according client requirements with international standard specifications • During the Painting application Wet film thickness checked with comb gauge and controls the quality of the job. Time intervals between coats checked and followed by manufacturer recommendation/Specifications. After cured the paints visual inspection/ DFT inspection carried out according to clients specification • Preparation of different types of documentation, inspection formats. Preparation of final dossier for small projects, shipping documents. Documentation control certificates & technical data as required by the customer such as NDT Reports, Final Inspection Reports, Calibration Records, and Welder Performance Certificates etc Show less
-
-
Education
-
COMSATS Institute of Information and Technology
Mechanical Engineering, Mechanical Engineering