umut yilmam
Electrical Engineer at Karel Mühendislik- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Russian Limited working proficiency
-
Chinese Elementary proficiency
Topline Score
Bio
Zafer Giray Özer
I saw him in his first job experience, a reliable, straight forward, hardworking and respectful engineer. He had the hunger for learning.Therefore I gave him all my knowledge thinking that he deserves this. I hear that he has very good reputation at the moment. I Hope to see him and work again.
Zafer Giray Özer
I saw him in his first job experience, a reliable, straight forward, hardworking and respectful engineer. He had the hunger for learning.Therefore I gave him all my knowledge thinking that he deserves this. I hear that he has very good reputation at the moment. I Hope to see him and work again.
Zafer Giray Özer
I saw him in his first job experience, a reliable, straight forward, hardworking and respectful engineer. He had the hunger for learning.Therefore I gave him all my knowledge thinking that he deserves this. I hear that he has very good reputation at the moment. I Hope to see him and work again.
Zafer Giray Özer
I saw him in his first job experience, a reliable, straight forward, hardworking and respectful engineer. He had the hunger for learning.Therefore I gave him all my knowledge thinking that he deserves this. I hear that he has very good reputation at the moment. I Hope to see him and work again.
Credentials
-
SketchUp for Architecture: Details
LinkedInAug, 2020- Oct, 2024 -
AutoCAD: Output
LinkedInMay, 2020- Oct, 2024 -
AutoCAD: Spaces and Workspaces
LinkedInApr, 2020- Oct, 2024 -
Electrical Systems: Reading Drawings and Schematics
LinkedInJan, 2020- Oct, 2024 -
Cert Prep: Word Expert - Microsoft Office Specialist for Office 2019 and Office 365
LinkedInDec, 2019- Oct, 2024 -
Microsoft Project 2016 Essential Training
LinkedInNov, 2019- Oct, 2024 -
Designing the Ultimate Man-Cave or She-Shed Design in SketchUp
LinkedInOct, 2019- Oct, 2024 -
Revit 2019: Professional Office Interior Design
LinkedInOct, 2019- Oct, 2024 -
AutoCAD: Developing A Prefab Unit
LinkedInSep, 2019- Oct, 2024 -
Cert Prep: LEED Green Associate
LinkedInSep, 2019- Oct, 2024 -
Cert Prep: Revit MEP Electrical Certified Professional
LinkedInSep, 2019- Oct, 2024 -
Learning AutoCAD
LinkedInSep, 2019- Oct, 2024 -
Creating Concrete Buildings with Revit Structure
LinkedInAug, 2019- Oct, 2024 -
Electrical Systems: Panel Boards, Frequency Drives, and Transformers
LinkedInAug, 2019- Oct, 2024 -
Learning PCB Design with OrCAD
LinkedInAug, 2019- Oct, 2024 -
Revit MEP 2014 Essential Training
LinkedInAug, 2019- Oct, 2024 -
SketchUp Pro: Modeling a Lamp
LinkedInAug, 2019- Oct, 2024 -
Cert Prep: Revit MEP Mechanical & Plumbing Certified Professional
LinkedInJul, 2019- Oct, 2024 -
Excel: Macros and VBA for Beginners
LinkedInJun, 2019- Oct, 2024 -
Excel: You Can Do This
LinkedInMay, 2019- Oct, 2024 -
Geometric Dimensioning and Tolerancing
LinkedInMay, 2019- Oct, 2024 -
Excel Essential Training (Office 365)
LinkedInApr, 2019- Oct, 2024 -
SketchUp: Modeling Interiors from Photos
LinkedInApr, 2019- Oct, 2024 -
Artist at Work: Creating a Visual Hierarchy
LinkedInMar, 2019- Oct, 2024 -
SOLIDWORKS: Mesh Tools
LinkedInMar, 2019- Oct, 2024 -
BIM Management: Careers
LinkedInFeb, 2019- Oct, 2024 -
Learning MATLAB
LinkedInFeb, 2019- Oct, 2024 -
Learning Tekla BIMsight
LinkedInFeb, 2019- Oct, 2024 -
3D Printing a Scale Model with AutoCAD
LinkedInJan, 2019- Oct, 2024 -
Construction Technology: Industry Snapshot
LinkedInJan, 2019- Oct, 2024 -
Strategic Thinking
LinkedInJan, 2019- Oct, 2024 -
Visio Tips and Tricks
LinkedInJan, 2019- Oct, 2024 -
SketchUp 2016 Essential Training
LinkedInDec, 2018- Oct, 2024 -
SketchUp: Kitchen Design
LinkedInDec, 2018- Oct, 2024 -
AutoCAD: Construction Drawings
LinkedInNov, 2018- Oct, 2024 -
Finding Your Purpose at Work
LinkedInNov, 2018- Oct, 2024 -
Learning Minitab
LinkedInNov, 2018- Oct, 2024 -
Maya 2013 Essential Training: 2 Polygonal Modeling Techniques
LinkedInNov, 2018- Oct, 2024 -
3D Printing & Modeling Household Parts
LinkedInOct, 2018- Oct, 2024 -
Migrating from AutoCAD to Revit
LinkedInOct, 2018- Oct, 2024 -
Construction Management: Concrete Construction
LinkedInSep, 2018- Oct, 2024 -
Illustrator: Working with AutoCAD Files
LinkedInSep, 2018- Oct, 2024 -
Body Language for Leaders
LinkedInJan, 2018- Oct, 2024 -
Communicating with Confidence
LinkedInJan, 2018- Oct, 2024 -
Gretchen Rubin on Creating Great Workplace Habits
LinkedInJan, 2018- Oct, 2024 -
Electronics Foundations: Fundamentals
LinkedInOct, 2017- Oct, 2024 -
Managing Your Time
LinkedInOct, 2017- Oct, 2024 -
SketchUp for Interior Design
LinkedInOct, 2017- Oct, 2024 -
Scaffolding İnspection Certification
Kaya TrainingJun, 2016- Oct, 2024 -
LEED GA
Green Building Education Services (GBES)Jan, 2016- Oct, 2024 -
Grounding Authorising Certificate
TMMOB Elektrik Mühendisleri Odası / Chamber of Electrical Engineers of TurkeyNov, 2015- Oct, 2024 -
First Aid Certificate
Dönüşüm İlkyardım EğitimAug, 2015- Oct, 2024 -
Solid Works
KOMEK
Experience
-
Karel Mühendislik
-
Türkiye
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Electrical Engineer
-
Nov 2016 - Present
-
-
-
RÖNESANS HOLDİNG
-
Türkiye
-
Construction
-
700 & Above Employee
-
Electrical Engineer
-
May 2015 - Nov 2016
KÜÇÜKYALI HİLLTOWN 207.000 m² (AVM+HOTEL)(190.000m²+17.000m²) Preparation of tender technical evaluation and comparison tables. Ensuring compliance with budget targets (man hour, compliance with supply and use plan). Finalizing site manufacturings according to the Turkish Standards and to the project. Reporting all manufacturings to the technical office and management. Management of nonconformities (10% improvement between initial internal audit and final internal audit score, 85% of published actions and nonconformities to be closed). Participation in the weekly OHS meeting with each contractor group. Participation in weekly OHS field walks. Manufacture quality control of subcontractors, fallowing test and control points for all manufacturings that were indicated in the method of statements. Every new starting pre-manufacturing, according to approved and agreed on OHS procedure between the contractor and site engineers, make meeting oriented to take necessary OHS precautions and having to approve that meetings Weekly reporting of man-hour productivity of manufacturing on a daily basis. After the completion of all the mobilization field electrical works and calculations, conceptualize the electrical project and according to this finalizing of purchasing the site panels, lighting fixtures, and cables. To provide safe, controlled, and steady energy for all field offices and containers, preparing energy taking forms. Inspection of the specifications of the related production before the contract, preparation of the method statement and participating in the quality control chief. Before the contract, Electric-related manufactures OHS procedures preparation, submission these procedures to the OHS chief for approving. Making weekly Toolbox meetings with each contractor group. To be prepared the as-built projects. Show less
-
-
-
Sahin Insaat
-
Türkiye
-
Construction
-
Electrical Engineer
-
Feb 2014 - Sep 2014
PARUS OTEL (27000 m2 closed area on the 61000 m2 open area) Under the scope of Turkmen standards conceptualize and control the Parus Hotel electrical projects with the subcontractor.After performing all project and mobilization electrical works materials quantities takeoff, making an order of all electrical materials. Such as( Hotel room mock-up materials, hotel room panels, cables, hotel laundry room, restaurant, fitness salon, disco bar, meeting room, bowling-billiard saloon, conference room, amphitheater, president room electrical materials etc.) ATTRACTİON PARK (13500 m2 closed area on the 102000 m2 open area) Under the scope of Turkmen standards conceptualize and control the Parus Hotel electrical projects with the subcontractor. Such as Voltage drop and power calculations controls, illumination calculation controls etc. After performing all project and mobilization electrical works materials quantities takeoff, making an order of all electrical materials. Such as Transformer building equipment ( Transformer high voltage circuit breaker, redresser, XLPE cable etc.) Diesel generator and equipment (fuel tank, exhaust sound absorber, fuel oil filling system etc.) Grounding and lightning protection equipment(grounding rod, grounding bus and connection components, equipotential bus, lightning arrester and fixing components etc.)PVC conduit, junction box, and consumables (rigid PVC conduits and fittings, cable tie, isolation tape and cable straps etc.) Cable trays ( rotational cable tray modules, cable trays in different sizes and level modification components, cable tray support, cable ladder and rotational cable ladder modules etc.) Electrical Panels (main distribution and companization panels, emergency distribution panels, environmental distribution panels etc.) CCTV systems equipment ( cameras, camera mounting bases and connectors)Lighting fixtures(environment and decorative lighting fixtures)Fire alarm systems, Public Announce Systems etc. YACHT CLUB+ KATEJ Show less
-
-
-
TUMAS
-
Belgium
-
Construction
-
1 - 100 Employee
-
Electric Control Engineer
-
Nov 2012 - Jul 2013
Konya Science Center construction electrical works Control(26000 m2 closed area on the 100000 m2 construction area) (Under the scope of technical and local electrical regulations after the controlling of all projects, determining the all electrical materials in the scope of contract such as(High Voltage Circuit Breaker, Generator, Transformer, Low Voltage Electrical Panels(Main and distribution), lighting fixtures(indoor and outdoor), simultaneous translation system equipment, fire alarm equipment, announce and music broadcasting system equipments, Access control system,CCTV equipments, outdoor electrical heating systems (against snow and ıce ) equipments.After the selection, the brand of material, controlling of all materials that delivered to the site is the same quantity and quality value or not with the approved one.Following all the electrical installations on site and preparing the progress report and percentage of the electrical works. According to the progress and percentage; making the payments and submitting all these reports to the municipality. Konya Selcuklu Convention Center construction electrical works Control (30000 m2 closed area on the 26000 m2 construction area) Before the construction, inspecting all electrical concept projects according to local regulation and all other disciplines, preparing an inspection report and obtaining application projects from the projector. After the submission of electrical materials (such as Grounding wires, cable trays, Cables(High Voltage-Low Voltage-Weak Current), Transformers, High Voltage Circuit Breaker) that indicated in the technical specification, approving the electrical materials according to technical specification and local regulations.Controlling of all the electrical installation and material on the site. After inspection on site, preparing the progress report and submitting the reports to the municipality and following all the corrective action on the site after reporting. Show less
-
-
-
StarMall Group
-
China
-
Leasing Non-residential Real Estate
-
1 - 100 Employee
-
Electric Engineer
-
May 2011 - Jun 2012
• Starmall Shenyang Shopping Mall (330.000 m² closed area )Project design coordination of Electrical Works, Tender Evaluation, Material Selection and Analyzing Offers and Creating Comparison Tables, Budget-Cost Review, Following up execution as per Schedule and Work Quality. Following of electrical works and reporting progress of electrical Works in site (Such as; main electricity supply between city substations and redline; All High Voltage , Transformer, Low Voltage electrical panel Works inside redline; Busbar, cable, cable tray, conduit revisions; facade, skylight, landscape lighting projects and application; commissioning of all generators ) Show less
-
-
-
Turkish Armed Force
-
Türkiye
-
Hospitals and Health Care
-
200 - 300 Employee
-
Electrical Engineer and Lieutenant Tank Captain
-
Apr 2009 - Apr 2010
• Lightning Protection System (Faraday Cage System) of 12 buildings (4000 m²). Drawing projects with all necessary calculations of 12 buildings under the scope of local and military regulations, preparing a technical specification for the subcontractor and for the military, following all works (welding of all copper conductors, burying copper rods under the ground etc..) in to the site and before consignment supervision of grounding tests. • Lightning Protection System (Faraday Cage System) of 12 buildings (4000 m²). Drawing projects with all necessary calculations of 12 buildings under the scope of local and military regulations, preparing a technical specification for the subcontractor and for the military, following all works (welding of all copper conductors, burying copper rods under the ground etc..) in to the site and before consignment supervision of grounding tests.
-
-
-
-
Electric Engineer
-
2006 - 2009
RENAISSANCE CONSTRUCTION RUSSIA - Perm (30.173 m² Construction Area) Kolizei Cinema Shopping Center electrical works, project design, calculation of voltage drop and illumination level of all locations, all electrical panels single line diagrams drawings, all illumination(with DİALUX program), power, lightning protection and grounding project drawings (with AUTOCAD program) under the scope of Russian local regulation. Following electrical works of all subcontractor (fire alarm, CCTV, public anons) in the site (reporting daily manufactures, preparing daily plans for the workers etc..) Kolizei Cinema Shopping Center Very Velly cinema theatres (5000m2) and cafes all electrical works, project design, voltage drop and illumination level calculations of all cinemas and all locations, all electrical panels single line diagrams, power and illumination drawings and ordering all electrical materials (panels, lighting fixtures, cables etc...).Following subcontractor's works of 4D cinema (SİMEX) and the other cinemas' works; according to the technical specifications of 4D cinema, drawing power projects for the devices, illumination projects and following all electrical works in the site (reporting daily manufactures, preparing daily plans for the workers etc..) RENAISSANCE CONSTRUCTION RUSSIA - Tyumen Tyumen DAUDEL (68.272 m² Construction Area) Housing Project second and third stage drawing of as-built Project Works (reporting daily manufactures, preparing daily plans for the workers etc..)and following all electrical works on the site. Show less
-
-
-
Bureau Veritas
-
Mexico
-
International Trade and Development
-
1 - 100 Employee
-
Electric Engineer
-
2005 - 2006
• Soyak Olimpia Kent housing buildings electrical works controls and inspections under the scope of quality control and quality guarantee; according to local regulation and technical specification, control of housing building’s electrical works and before consignment execution of electric test. • According to local regulation France Palace porter lodging building electrical manufacturing process appropriateness’s technical inspections. • Carrefour City-Park Project project control • Soyak Olimpia Kent housing buildings electrical works controls and inspections under the scope of quality control and quality guarantee; according to local regulation and technical specification, control of housing building’s electrical works and before consignment execution of electric test. • According to local regulation France Palace porter lodging building electrical manufacturing process appropriateness’s technical inspections. • Carrefour City-Park Project project control
-
-
Education
-
Istanbul Technical University
Master's degree(Not Completed), Electrical Engineering -
Istanbul Technical University
Engineer’s Degree, Electrical Engineering