Uchechukwu Oji

Principal Planning Engineer at PPI and KOG Nigeria Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Nigeria, NG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Principal Planning Engineer
      • Sep 2019 - Present

       Develop and maintain schedules for North bank FS & CCP/CPF, Yokri FS, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Develop and manage the project progress measurement sheet for the project locations- North bank FS & CCP/CPF, Yokri FS, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Prepare level two deterministic schedule for Acumen Fuse and Primavera Risk analysis for all projects  Engage in proper alignment of work scope to project requirements and assist in developing Risk Register before loaded into easy risk software.  Follow up on design, engineering and procurement issues and properly advice management on the schedule health and issues for necessary mitigations.  Develop all necessary trackers that will enable proper progress management and good visibility for the project health status.  Responsible for the alignment and maintenance of the Integrated master schedule with commissioning and contractors schedule for completeness and accuracy  Facilitates weekly interface meeting with client and different vendors to deliberate on construction interface issues and reflect the impact on schedule with proper advice to project leadership.  Liaise with the Commissioning team, Project team (PMT) and Vendors to achieve a workable and realistic system / subsystem schedule with adequate site presence for both onshore and offshore projects.  Support commissioning and OR& A team to analysis activity progress and reporting  Supports team on planning inputs on weekly & monthly report, performance slide and generating of project s-curves. Show less

  • Shell Petroleum Development Company under Tri-Continental Ltd
    • Shell Petroleum Development Coy, Aso Rock, 1st Floor, Ogunu, Warri Delta State
    • Senior Planning Analyst (Primavera Consultant)
      • Feb 2011 - Present

      2011- Till date. Shell Petroleum Development Company under Tri-Continental Oil Service: Senior Planning Analyst for FoDA and Domgas project (Domestic/Export Gas Supply Project)  Develop and maintaining integrated level two and level three schedule for Forcados Yokri Integrated Project (FYIP), Utorogu Non Associated Gas (NAG-1) Gas Plant Performance Improvement Project , Utorogu/ Ughelli East & West Associated Gas Solution project (3U’s), Utorogu NAG 2 Plant Project ,Ughelli East GP Revamp & Brownfield Project and Otumara & Saghara Associated Gas Solution project.  Develop and assist to maintain integrated level two/ level three/level four system based schedule for the Forcados Yokri Integrated Project (FYIP).  Develop and manage the project measurement sheet for the five project locations- Forcados Terminal, South bank, Yokri, North bank, CCP/CPF,Estuary and the other project in the portfolio.  Develop Level 2 schedule’s for Schedule Risk Analysis Model (SRA) with adequate quantification and mapping of risk from top risk for Primavera Risk Analysis.  Represents Forcados Yokri Integrated Project planning Team in mid –construction audit and Project Evaluation Review sessions.  Monitoring activity progress and rescheduling of both master plan and detailed plan  Responsible for the alignment and maintenance of the Integrated master schedule with commissioning and contractors schedule for completeness and accuracy  Liaise with the Commissioning team, Project team and Vendors to achieve a workable and realistic schedules either system based or WBS  Carry out field inspection on the various land/ swamp and offshore project locations.  Responsible for writing Joint Venture NAPIMS weekly report, monthly report, team’s weekly report and project related report.  Develop cost and schedule analysis using graphic representation (earn value, s-curve, manpower & histogram etc) and communicate results to management Show less

    • Senior Planning Engineer
      • Jul 2013 - Aug 2019

       Develop and maintain integrated level two and level three system/subsystem schedules for North bank FS & CCP/CPF, Forcados Terminal, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Develop and manage the project progress measurement sheet for the project locations- North bank FS & CCP/CPF, Forcados Terminal, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Prepare level two deterministic schedule for Acumen Fuse and Primavera Risk analysis for all projects  Engage in proper alignment of work scope to project requirements and assist in developing Risk Register before loaded into easy risk software.  Follow up on design, engineering and procurement issues and properly advice management on the schedule health and issues for necessary mitigations.  Develop all necessary trackers that will enable proper progress management and good visibility for the project health status.  Responsible for the alignment and maintenance of the Integrated master schedule with commissioning and contractors schedule for completeness and accuracy  Facilitates weekly interface meeting with client and different vendors to deliberate on construction interface issues and reflect the impact on schedule with proper advice to project leadership.  Liaise with the Commissioning team, Project team (PMT) and Vendors to achieve a workable and realistic system/subsystem schedule with adequate site presence for both onshore and off-shore projects.  Developed WAR or MISSION ROOM for the North Bank FS & Central Compression Plant / Central Processing Facility Project for daily progress interface with all project stakeholders (Clients and Contractors).  Responsible for writing Performance slide, project services weekly & monthly report, assist in SPDC Joint Venture NAPIMS bi-weekly and generating of project s-curves. Show less

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Planning Engineer
      • Jul 2013 - Aug 2019

       Develop and maintain integrated level two and level three system/subsystem schedules for North bank FS & CCP/CPF, Forcados Terminal, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Develop and manage the project progress measurement sheet for the project locations- North bank FS & CCP/CPF, Forcados Terminal, South Bank FS, Odidi EPLS 18”PL loop line and Offshore (Onshore & Offshore).  Prepare level two deterministic schedule for Acumen Fuse and Primavera Risk analysis for all projects  Engage in proper alignment of work scope to project requirements and assist in developing Risk Register before loaded into easy risk software.  Follow up on design, engineering and procurement issues and properly advice management on the schedule health and issues for necessary mitigations.  Develop all necessary trackers that will enable proper progress management and good visibility for the project health status.  Responsible for the alignment and maintenance of the Integrated master schedule with commissioning and contractors schedule for completeness and accuracy  Facilitates weekly interface meeting with client and different vendors to deliberate on construction interface issues and reflect the impact on schedule with proper advice to project leadership.  Liaise with the Commissioning team, Project team (PMT) and Vendors to achieve a workable and realistic system/subsystem schedule with adequate site presence for both onshore and off-shore projects.  Developed WAR or MISSION ROOM for the North Bank FS & Central Compression Plant / Central Processing Facility Project for daily progress interface with all project stakeholders (Clients and Contractors).  Responsible for writing Performance slide, project services weekly & monthly report, assist in SPDC Joint Venture NAPIMS bi-weekly and generating of project s-curves. Show less

  • Provast Limited
    • Shell Petroleum Development C0y, Edjeba Blk N. Flat 3, Warri Delta State
    • Contract Administrator/ Facility Co-ordinator
      • May 2011 - Jan 2012

      Contract Administrator/Facility co-ordinator/ Primavera Consultant * Collation and managing of all contracts in Provast Portfolio * Preparing of preventive and reactive plan for the various work activities in the locations * Co-ordinates operations in Yenagoa (civil, electrical and catering services) * Co-ordinates the computer maintenance management package (PLANON) and ensure work orders from the 14 locations are closed wethin the service level agreement. * Prepares contract submission and provide relevant document for contracts. * Scoping and managing of the projects * Configuring the computer systems to client for Contract(C4C) and setting up Provast limited e-mail addresses * Reports weekly and monthly activities on site. * Prepares Provast Limited monthly performance report to Shell Petroleum Development Company Show less

  • Shell Petroleum Development Company
    • Shell Petroluem Development Coy, Main Office Area,GXD 012 ,Warri Delta State
    • Feild Logistics Base West Planner under Veragin Limited
      • Jul 2009 - Apr 2011

      Infrastructure West Production Support Planner: Field Logistics Base * Develop detailed project plans for all field locations (Land, Swamp-1 & 2 and Forcados Terminal). * Manages the CAPEX & OPEX budget and advises/reports status * Prepares/populate DEVCOM template for the team. * Managing and tracking of job requests from various locations and closing action items with PLANON for all FLB routine maintenance work orders. * Raises and follow-up contracts from supply chain management (SCM) to the creation of Purchase order (PO) by other authorized personnel in the system via execution and close out. * Proper documentation of projects files and access control. * Co-ordinates and manage contractor performance on sites. * Co-ordinates HSE audit items and ensure its immediate close out * Scopes and manages activities in Forcados Terminal and Yenagoa Liaison office bas e Office * Reporting on weekly, monthly, quarterly and yearly performance for the team. * Prepares reports on power point slides and excel spread sheet for management presentations and meeting. Show less

    • Community Infrastructure Project Planner (East & West)
      • Jun 2007 - Jul 2009

      Community Infrastructure Project Planner (East and West)  Developing detailed project schedules for all ongoing and planned projects with P3e as a tool and monitoring contractor work progress.  Creation of Work Orders and Purchase Requisitions (PR) that subsequently lead to the creation of Purchase Orders by other authorized personnel in the system  Creation and entering of Service Entries in SAP to facilitate the processing and payment of vendors’ invoices for works done on behalf of the company  Development of teams business plans and prepares slides in power point and excels for presentations.  Proper documentation of projects files and control of access.  Cost review and analysis of projects to be executed for the team and liaising with finance team for the approval of the budget.  Developing and monitoring of HSE-MS Audit Tracker and analyzing Job Hazard Register  Planning, Monitoring/Controlling and closing out projects for the East and West team.  Collating and updating information from the project engineers East and West on the Project executed for the team.  Reporting on weekly, monthly, quarterly and yearly performance for the team. Focus on Delivery –License to Operate work stream Planner (3 Months)  Built P3e Structure for FOD-LTO work stream across the five Pillar activities (Community Relations, Legacy, Global Memorandum of Understanding-GMoU, Spills Compensation and Blockade and Surveillance  Planned and monitored the performance in the Pillars.  Performance reporting on the status of the five pillars activities against plan. Show less

    • Oil Spill Supervisor
      • Apr 2006 - May 2007

      Oil Spill Supervisor  In charge of Oil/Chemical Spill Response Base in Shell Petroleum Development Company Bonny Terminal.  Containment and recovery Oil/Chemical Spills (on-shore and off-shore) operations.  Deployment of Oil/Chemical Spill Equipments and its Accessories during operations  Inspection of the boosters and saver pits for any Oil Spill Response actions.  Evaluating oil/chemical spill impacts to environment and adequate remediation.  Conducting monthly Oil/Chemical Spill drills.  Raising Permit to work and closing the permit.  Writing of monthly report and end year reports. Show less

    • Senior Primavera Consultant
      • Jan 2005 - May 2006

       Training companies (Shell Petroleum Development Company (SPDC), TOTALFINAELF and others) on P3e/c Software.  Marketing of P3e and P3e/c Project Management Software.  Creating organizational breakdown structure (OBS), Enterprise project structure (EPS) and Work Breakdown structure (WBS) for a project.  Planning and scheduling projects to meet up the time, scope and budget for the project.  Optimizing project plan and removing over allocation of resources.  Analyze resource availability and analysis project cost.  Analyze schedule dates and shortens project schedules.  Creating baseline plan and displaying it on the Gantt chart.  Analyze projects and adjust schedule data  Analyze resource and cost data and perform baseline analysis. Show less

    • Senior Project Engineer
      • Feb 2003 - Dec 2004

      Project Engineer:  Construction of buildings, drainages, culverts and roads.  Preparing project WBS (Work Breakdown Structure) for the company.  Preparing monthly report of all the company’s project activities.  Ensure that environmental friendly practices are carried out on site. Project Engineer:  Construction of buildings, drainages, culverts and roads.  Preparing project WBS (Work Breakdown Structure) for the company.  Preparing monthly report of all the company’s project activities.  Ensure that environmental friendly practices are carried out on site.

    • Teacher of Physics
      • May 2001 - Jun 2002

      Physics Teacher - National Youth Service Corps (NYSC)  Prepare Students for both external and internal examinations.  Compilation of their internal examination results. Physics Teacher - National Youth Service Corps (NYSC)  Prepare Students for both external and internal examinations.  Compilation of their internal examination results.

Education

  • University of Port-Harcourt
    Master's degree, Engineering Management
    2011 - 2013
  • University of Port Harcourt
    2.1, Environmental Engineering
    2001 - 2005

Community

You need to have a working account to view this content. Click here to join now