Ubaid Ullah
at National Transmission and Despatch Company Limited (NTDC)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
NTDC
-
Pakistan
-
Government Administration
-
200 - 300 Employee
-
-
Apr 2022 - Present
-
-
-
Mar 2021 - Apr 2022
-
-
-
Saudi Electricity Company
-
Saudi Arabia
-
Utilities
-
700 & Above Employee
-
Electrical Protection & Comissioning Engineer
-
Mar 2016 - Jan 2021
Commissioning and testing supervision of Protection Relays testing of all 380KV, 110KV, and 13.8KV Feeders Protection Relays Commissioning of Transformers, Lines, Capacitor Banks and Bus bars. Testing of Energy meters Troubleshooting in protection circuits, control circuits, monitoring circuits and measuring circuits Electrical Inter-Locking Scheme verification among Circuit Breakers, Isolators and Earth switches VT Selection Scheme verification for closing of 380/110KV Circuit Breakers from Remote Control Panel and Auto-Reclosures, through Synchro-Check Relays. Installation, testing and commissioning of Auto Transformers, Power Transformers, Protection Relays, Control panel equipment, relay panel equipment, Energy meters Analysis of Faults and Preparing Fault Analysis Reports of different types of faults in the Power system Commissioning and testing of cross trip schemes i.e. undervoltage and underfrequency schemes. Modification in old protection schemes and control schemes. Leading Operation and Protection professional teams. Providing proper and safe working environment at site, proper test sets, safety equipment and proper tools and ensuring its application . Show less
-
-
-
NTDC WAPDA
-
Peshawar Pakistan
-
Electrical Protection Engineer
-
Mar 2012 - Feb 2016
Protection Relays testing of all 500KV, 220KV, 132KV and 11KV Feeders Protection Relays testing of 500/220KV, Auto Transformer Banks Protection Relays testing of 220/132KV, Auto Transformers Protection Relays testing of 132/11.5KV, 20/26MVA and 10/13MVA Power Transformers Protection Relays testing of 500/220KV and 132KV Busbars Testing of Energy meters Troubleshooting in protection circuits, control circuits, monitoring circuits and measuring circuits Electrical Inter-Locking Scheme verification among Circuit Breakers, Isolators and Earth switches VT Selection Scheme verification for closing of 500/220/132KV Circuit Breakers from Remote Control Panel and Auto-Reclosures, through Synchro-Check Relays. Testing of 220/132KV, Auto Transformers and testing of their protection relays Testing of 132/11.5KV, 20/26MVA and 10/13MVA Power Transformers and testing of their protection relays Installation, testing and commissioning of Auto Transformers, Power Transformers, Protection Relays, Control panel equipment, relay panel equipment, Energy meters Analysis of Faults and Preparing Fault Analysis Reports of different types of faults in the Power system Commissioning and testing of cross trip schemes on 500KV Line and at 220KV Line. Modification in old protection schemes and control schemes. Leading Operation and Protection professional teams. Providing proper and safe working environment to the staff including proper test sets, safety equipment and proper tools and ensuring its application Arrangement of scheduled and emergent shutdowns Managing Financial and Human Resources of the Sub-Division. Show less
-
-
Education
-
Virtual University of Pakistan
Master of Public Administration - MPA, Human Resources Management/Personnel Administration, General -
University of Engineering and Technology Peshawar Pakistan
Master of Science (Electrical Power Engineering), Electrical Engineering -
University of Engineering & Technology, Peshawar Pakistan
Bachelor’s Degree, Electrical Engineering