Uğur Telatar
Earthworks Field Cheif at CH Engineering & Construction- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CH Engineering & Construction
-
Türkiye
-
Metal Ore Mining
-
1 - 100 Employee
-
Earthworks Field Cheif
-
Dec 2022 - Present
Tavsanlı Gold Mine Tavsanlı Gold Mine
-
-
-
Limak Group of Companies
-
Türkiye
-
Civil Engineering
-
700 & Above Employee
-
Infrastructre and Earthwork Cheif
-
Nov 2021 - Jun 2022
Diyarbakir City Hospital Project I took an active role in site mobilization, excavation and infrastructure works within the scope of Diyarbakır City Hospital Project (1,000 beds). During the process, I took part in budget planning, planning of excavation and blasting studies and admission to the Health Investments Manager. The project was terminated in line with the demand for price difference. Diyarbakir City Hospital Project I took an active role in site mobilization, excavation and infrastructure works within the scope of Diyarbakır City Hospital Project (1,000 beds). During the process, I took part in budget planning, planning of excavation and blasting studies and admission to the Health Investments Manager. The project was terminated in line with the demand for price difference.
-
-
-
Renaissance Construction
-
Türkiye
-
Construction
-
700 & Above Employee
-
Infrastructre Chief
-
Aug 2017 - Jul 2020
I worked as an 'Infrastructure Chief' at Başakşehir and Elazığ City Hospitals. While I was working in the last year of Elazig City Hospital, I worked at Başakşehir City Hospital for about 2 years. In the last 45 days I have been in Rönesans, we have completed the Sancaktepe Field Hospital Project, which gained urgent importance during the pandemic period. In Elazig, I managed all the processes related to both earthworks and infrastructure (earthworks, infrastructure works, environmental structures and landscaping works etc.). It was built on an area of approximately 347,500 square meters, with a total of 1038 beds. In the Başakşehir region, I took the responsibility of infrastructure and various rough construction projects (all infrastructures, earthworks, galleries, etc.). It had a capacity of 2,682 beds and a closed construction area of 1,000,000 square meters. Sancaktepe Emergency Hospital had 1008 beds built on a total area of 125,000 square meters. I managed the entire infrastructure process. Show less
-
-
-
Erdem Holding
-
Türkiye
-
Financial Services
-
1 - 100 Employee
-
Earthwork Cheif
-
Sep 2015 - Aug 2017
BRİDGESTON TIRE FACTORY (INDUSTRIAL FACTORY - INFRASTRUCTRE PROJECT) We realized Turkey's first factory Industry 4.0 project. The project consists of an open area of 1.000.000 m2 and includes production facilities, auxiliary facilities, infrastructure works, in-plant roads and landscaping works and is "turnkey". I managed all earthworks and infrastructure processes of this project. BRİDGESTON TIRE FACTORY (INDUSTRIAL FACTORY - INFRASTRUCTRE PROJECT) We realized Turkey's first factory Industry 4.0 project. The project consists of an open area of 1.000.000 m2 and includes production facilities, auxiliary facilities, infrastructure works, in-plant roads and landscaping works and is "turnkey". I managed all earthworks and infrastructure processes of this project.
-
-
-
Yuksel Holding A.S.
-
Türkiye
-
Civil Engineering
-
300 - 400 Employee
-
Earthwork Field Engineer
-
Jan 2007 - Sep 2015
I was worked total 9 years in Saudi Arabia with Yüksel Construction. I started as earthworks field engineer and left as field section chief. In this 9-year period, we have realized 2 dam projects, 1 university project, 1 hospital project, 1 steel pipeline project and finally the infrastructure project of Riyadh, the capital of Arabia. General information about the projects is as follows; * Baysh Dam Project- (12.2006-02.2008): I worked as Earthworks Site Engineer. The dam, built in concrete gravity type, has a height of 120 m from the foundation, a crest length of 340 m and a total storage capacity of 192 million m³. * Damad Dam Project- (02.2008-01.2010): I worked as Earthworks Site Engineer. The reservoir volume of the dam, which is of roller compacted concrete (RCC) type, is 55 million m³, the height from the foundation is 52 m, and the crest length is 592 m. * 3. Faz Kral Faisal University- (01.2010-02.2011): I worked as an Infrastructure Works Site Engineer. In Al Hasa City, there are infrastructure works and landscaping such as roads, water, waste water, electricity, cooling water lines, drinking water and waste water treatment facilities, generator building, 17 waste water and drinking water tanks inside the new university campus of 5,500,000 m2. * Kral Fasial Training Hospital- (02.2011-11.2012): I worked as an Infrastructure and Earthworks Field Engineer. We carried out the infrastructure and soil works of the hospital project built on an area of ??approximately 300,000 m2. * Water Transmission Line Project Between Hilli, Yobba and Al Lith Dams and SHOAİBA Water Treatment Plant- (11.2012-03.2014): I worked as Earthworks Field Chief. It is a steel pipeline project of 1600mm diameter and 200 km length. * Riyadh Stormwater Drainage Networks- (03.2014-09.2015): I worked as Earthworks Field Chief. The project includes 40 km of box culvert and 126 km of pipeline. Show less
-
-
Education
-
Ankara Üniversitesi
Mühendislik Fakültesi Mezunu, Jeoloji/Jeofizik Mühendisliği -
Nevşehir Üniversitesi
Yüksek Lisans (Master), İş Sağlığı ve Güvenliği