Tyler Brownell

Pipeline Project Technician at Trans-Northern Pipelines Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • TDG
    Stantec
    Mar, 2023
    - Nov, 2024
  • Confined Space
    -
    Mar, 2018
    - Nov, 2024
  • Construction Propane
    Advanced Consulting and Training
    Feb, 2018
    - Nov, 2024
  • Flagging
    Advanced Consulting and Training
    Feb, 2018
    - Nov, 2024
  • Mini Excavator
    AdvancedConsulting and Training
    Feb, 2018
    - Nov, 2024
  • Skid Steer
    Advanced Consulting and Training
    Feb, 2018
    - Nov, 2024
  • Working at Heights
    Bayshore Home Health
    Nov, 2017
    - Nov, 2024
  • ICS 100, 200, 300
    Emergwest
    Feb, 2020
    - Nov, 2024
  • Ground Disturbance for Supervisors 201
    -
    Jun, 2015
    - Nov, 2024
  • Pipeline Construction Safety Training
    -
    Jun, 2015
    - Nov, 2024
  • First Aid
    -
  • arc flash and low voltage safety training
    Canada Training Group

Experience

    • Canada
    • Oil and Gas
    • 100 - 200 Employee
    • Pipeline Project Technician
      • Sep 2021 - Present

      -Review and implimentation of Job Safety Execution Plans (JSEP),-In-field coordination of inline inspection runs,-Facilitating spool and valve replacements and installations,-Participate in all aspects of mainline Nitrogen Purges, from launching to receiving,-Inspect for various maintanence projects from API inspections to Facility Foundation repair to Groundwater Monitoring.

    • Pipeline Technician
      • May 2018 - Sep 2021

      -Managed TNPI's Brush Clearing Program from Quebec to Kingston and Ottawa, coordinating Clearing, Land and Environmental contractors. Developed a 10 year plan identifying areas requiring clearing with an appropriate schedule.-Managed various third party contractors for jobs including but not limited to brush clearing, conduit boring, well drilling, road construction, water and sewer installation/replacement, tile drain installation/repair, cathode installation, fence installation, ditch clearing, etc,-Supervised/Inspected various TN jobs including but not limited to mainline cutouts, vegetation maintenance, building maintenance, monitoring well inspections, brush clearing, water crossings, etc

    • Canada
    • Professional Services
    • 700 & Above Employee
    • Municipal Engineering Technician
      • Apr 2017 - Jan 2018

      Civil Engineering Technician Performed Construction Administration, Field Inspection and Supervision for several municipal projects up to $3,000,000. Throughout my time at WSP I've garnered valuable experience in a variety of linear infrastructure projects (forcemains, watermains, gravity sewers, roads) as well as the upgrading of wastewater treatment plants. I ensured communication was kept between the client, the contractor and the Engineer. I performed progress payments, change orders, site instructions and RFIs for several projects. Experienced in the redesign of roadway and parking lot grading plans. Facilitated extensive topographic surveys of landfills and lagoons utilizing a Trimble Geo 7x and a Trimble Laser Scanner (when dense cover was encountered).

    • Canada
    • Government Administration
    • 1 - 100 Employee
    • Engineering Intern
      • Sep 2016 - Apr 2017

      Built upon the Township's current Municipal Asset Management Plan. Duties included performing condition assessments on assets such as buildings, vehicles, sidewalks, etc. Data was quantified, individual asset condition was determined and a financial plan (both short term and long term) were developed for the municipality. Built upon the Township's current Municipal Asset Management Plan. Duties included performing condition assessments on assets such as buildings, vehicles, sidewalks, etc. Data was quantified, individual asset condition was determined and a financial plan (both short term and long term) were developed for the municipality.

    • Canada
    • Construction
    • 700 & Above Employee
    • Lead Hand / Straw
      • Aug 2015 - Aug 2016

      Grand Rapids Expansion Project Completing daily FLHAs and conducting tailgate meetings. Working in conjunction with the foreman, operators and skilled labourers ensuring the job is performed on schedule in a safe manner. Specific pipeline construction tasks included Spacing, Road and Hotline Bores, Tie-ins, Valve Installations, Digs, Set-up, Welding, Lowering in and Backfill. Grand Rapids Expansion Project Completing daily FLHAs and conducting tailgate meetings. Working in conjunction with the foreman, operators and skilled labourers ensuring the job is performed on schedule in a safe manner. Specific pipeline construction tasks included Spacing, Road and Hotline Bores, Tie-ins, Valve Installations, Digs, Set-up, Welding, Lowering in and Backfill.

    • Assistant Golf Course Superintendent
      • Apr 2010 - Nov 2015

      Head maintenance for the golf course's seasonal operations. Time Period: April-November 2010 April-June, August-November 2011 April-June, August-November 2012 April-June, August-November 2013 Responsibilities include: -Training new workers -General golf course related maintenance (grass cutting, trimming, greens maintenance, equipment maintenance, etc...) -Aiding in the opening of the course in the spring and closure in the fall.

    • United States
    • Construction
    • 400 - 500 Employee
    • Skilled Labourer
      • Jul 2014 - Sep 2014

      NWR External Pipeline (3") Completing daily FLHAs and conducting tailgate meetings. Working in conjunction with the foreman, operators and skilled labourers ensuring the job is performed on schedule in a safe manner. Specific pipeline construction tasks included Road and Hotline Bores, Tie-ins, Valves, Dig-ups, Set-up, Welding, Lowering in and Backfill NWR External Pipeline (3") Completing daily FLHAs and conducting tailgate meetings. Working in conjunction with the foreman, operators and skilled labourers ensuring the job is performed on schedule in a safe manner. Specific pipeline construction tasks included Road and Hotline Bores, Tie-ins, Valves, Dig-ups, Set-up, Welding, Lowering in and Backfill

    • United States
    • Construction
    • 400 - 500 Employee
    • Warehouse Worker
      • Jun 2013 - Sep 2013

      Duties included: -organizing and assigning company vehicles and other equipment (light towers, generators, etc...) -organizing warehouse equipment -filling equipment orders -performing regular maintenance on equipment -Operating Cat 930H wheel loader to level ground, move materials, unload trucks, string pipe for fittings -keep an organized, clean and efficient warehouse Duties included: -organizing and assigning company vehicles and other equipment (light towers, generators, etc...) -organizing warehouse equipment -filling equipment orders -performing regular maintenance on equipment -Operating Cat 930H wheel loader to level ground, move materials, unload trucks, string pipe for fittings -keep an organized, clean and efficient warehouse

    • Oil and Gas
    • 700 & Above Employee
    • Lead Hand / Straw Boss
      • Jun 2012 - Aug 2012

      Worked as a lead hand on a Kinder Morgan Tank farm in Sherwood Park, Edmonton, AB. Duties included rigging 20" and 36" pipe for booms and cranes, setting up complex sections, swamping triple joints of pipe in tight quarters, constructing mud plugs in pipe by hand under SABA for hot tie-ins, conducting high pressure tests, helping welders, and aiding in stabbing and spacing pipe. Worked as a lead hand on a Kinder Morgan Tank farm in Sherwood Park, Edmonton, AB. Duties included rigging 20" and 36" pipe for booms and cranes, setting up complex sections, swamping triple joints of pipe in tight quarters, constructing mud plugs in pipe by hand under SABA for hot tie-ins, conducting high pressure tests, helping welders, and aiding in stabbing and spacing pipe.

    • Canada
    • Construction
    • 700 & Above Employee
    • Skilled Labourer
      • Jun 2011 - Aug 2011

      Worked for Ledcor Pipeline performing Enbridge Integrity digs from Outlook,MB to White City,MB. Duties included manually digging and jackhammering under pipe, swamping for excavator, installing silt fence, pumping water, using jumping jacks to pack earth, performing compaction tests, installation and removal of trench boxes. Worked for Ledcor Pipeline performing Enbridge Integrity digs from Outlook,MB to White City,MB. Duties included manually digging and jackhammering under pipe, swamping for excavator, installing silt fence, pumping water, using jumping jacks to pack earth, performing compaction tests, installation and removal of trench boxes.

    • Junior Ranger
      • Jul 2009 - Aug 2009

Education

  • Carleton University
    B.Eng Architectural Conservation and Sustainability (Structural), Engineering
    2011 - 2015
  • Tagwi Secondary School
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now