Tuyen Nguyen
Technical Manager at Trungnam SMC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English, Old (ca.450-1100) Native or bilingual proficiency
Topline Score
Bio
Experience
-
Trungnam SMC
-
Vietnam
-
Truck Transportation
-
1 - 100 Employee
-
Technical Manager
-
Jan 2022 - Present
- Project transportion and installation engineer at TRUNG NAM SOUTHERN MECHANICAL CORPORATION (TNSMC)- A BRANCH OF TRUNG NAM GROUP, Hochiminh City - Trung Nam phase 3 -12x E126 4.2 MW (MST) in Ninh Thuan province. finished - Phuoc Huu wind farm - 11 x E138 4.2 MW in Ninh Thuan province - Daklak 1 Wind Farm - 24x E138 4.2 MW & 60xE160 5 MW in Daklak province - Gia Lai 1 Wind Farm - 75x E160 5 MW in Gia Lai province - Tra Vinh V1-7 Offshore Wind Farm - 25 x SG145 5MW in Tra Vinh province
-
-
-
-
Senior Naval Architect
-
Jul 2019 - Jul 2020
Involved projects - 4/2020: as Chief engineer for making a plan to pull 02 ZPMC cranes from Port onto link bridge Port to Change Position of Cranes by rail way and winch hydraulic. Weight of cargo 1150 tons each - 5/2020: as Chief engineer for making a plan to transport a Mitsui Crane from Tan Cang Hai Phong International Terminal to Tan Cang Caimep ODA Terminal. Weight of cargo 1037 tons Involved projects - 4/2020: as Chief engineer for making a plan to pull 02 ZPMC cranes from Port onto link bridge Port to Change Position of Cranes by rail way and winch hydraulic. Weight of cargo 1150 tons each - 5/2020: as Chief engineer for making a plan to transport a Mitsui Crane from Tan Cang Hai Phong International Terminal to Tan Cang Caimep ODA Terminal. Weight of cargo 1037 tons
-
-
-
Vietranstimex Vietnam
-
Vietnam
-
Truck Transportation
-
1 - 100 Employee
-
Naval Architect
-
Jul 2009 - Jul 2019
Involved projects - As leader engineer at site for barge transportion: Transportion equipments for Nghi Son oil refinery project from Doosan - Vina at Quang Ngai Province to Construction Jetty at Site Nghi Son Thanh Hoa Province for Nippon Express clients from Japan: Including calcuation loadout / loadin, Lashing, Stability check, barge strenght check. - Transportation of cranes has been performed so far: Loadout/in Kocks Crane on a barge at CatLai Port in HCM City for TanCang Client transportion with 07 Cranes(02 KE cranes: 450T , 05 RGT cranes 130T) on a barge from CatLai Port in HCM City to 189 Port Hai Phong Province for TanCang Client. Transportion with 02 Cranes (2x540T) on barge from Hoang Dieu Port to Dinh Vu Port at Hai Phong Province for Hai Phong Port Clien. Transportion with 02 Cranes( Liebherr 365T and KE 450T) on barge from 189 Port at Hai Phong Province to Qui Nhơn Port at Qui Nhơn Province for Changing Cranes project from TanCang Client Transportion with Kocks Crane550T on barge from CatLai Port to Hiep Phuoc Port at HCM City for TanCang Client - Load –Out/in: Calculation of Ballast, Stability, Mooring, Strength of Barge for typical oil and gas projects. Piles HaiThach. Weight : 1900 tons, Length:150m at VietSo Port , Vung Tau - VietNam Topside HaiThach . Weight : 3300tons, at PTSC Port, Vung Tau - VietNam Topside SuTuNau North :1900T, Topside SuTuNau South: 2100T at PTSC port , Vung Tau - VietNam Topside Te Giac Trang : 2500T at PTSC port , Vung Tàu – VietNam Piles Thien Ung. Weight : 1750 tons, Length:150m at VietSo Port , Vung Tàu - VietNam Module 1,2 Topside: 2100T, Living Quarter 2400T at PTSC Port, Vung Tau - VietNam Jacket, Topside for (P11,P12,P13,P14) for Ministry of Defence at VungTau Port Jacket: 900T, Topside:1000T CaTam at VietSo Port , Vung Tau - VietNam Module Train A 800T at VietSo Port , Vung Tau – VietNam
-
-
Education
-
UTH - University of Transport Ho Chi Minh City
Bachelor's degree, Naval Architecture and Marine Engineering -
Ho Chi Minh City University of Transport
-
University of HCM