Nordic RCC
-
Denmark
-
Electric Power Transmission, Control, and Distribution
-
1 - 100 Employee
-
Senior Engineer
-
Jul 2022 - Present
I am the Common Grid Model (CGM) expert in Norcap project. I specify and test functionalities related to merging Individual Grid Models (IGMs), created using the CIM-based CGMES 2.4.15 standard, into a Nordic CGM. The CGM will then be used in other Nordic RSC services, such as Common Capacity Calculation that uses the Flowbased method. I am the Common Grid Model (CGM) expert in Norcap project. I specify and test functionalities related to merging Individual Grid Models (IGMs), created using the CIM-based CGMES 2.4.15 standard, into a Nordic CGM. The CGM will then be used in other Nordic RSC services, such as Common Capacity Calculation that uses the Flowbased method.
-
-
-
Nordic RSC
-
Copenhagen Area, Capital Region, Denmark
-
Power System Engineer
-
Sep 2019 - Jun 2022
I was the Common Grid Model (CGM) expert in Norcap project. I specified and tested functionalities related to merging Individual Grid Models (IGMs), created using the CIM-based CGMES 2.4.15 standard, into a Nordic CGM. The CGM will then be used in other Nordic RSC services, such as Common Capacity Calculation that uses the Flowbased method. I was the Common Grid Model (CGM) expert in Norcap project. I specified and tested functionalities related to merging Individual Grid Models (IGMs), created using the CIM-based CGMES 2.4.15 standard, into a Nordic CGM. The CGM will then be used in other Nordic RSC services, such as Common Capacity Calculation that uses the Flowbased method.
-
-
-
Fingrid Oyj
-
Finland
-
Oil and Gas
-
300 - 400 Employee
-
Specialist
-
Mar 2018 - Aug 2019
As a grid planning specialist I developed the Finnish main grid. I created a long term regional development plan for different areas in Finland. I also participated in maintaining the long term investment plan and compiling investment proposals for the executive team or the board of Fingrid. In addition, I calculated estimates for customers concerning i.e. the available capacity in the main grid.
-
-
Specialist
-
Feb 2015 - Feb 2018
As a specialist in Grid Services at Fingrid I was responsible for implementing the new pricing system for reactive power. I determined reactive power limits for each connection point and developed and implemented the terms and conditions for transmitting reactive power. I also developed tools for both customers and account managers to monitor the use of active and reactive power and participated in developing the reactive power pricing model. In addition, I regularly contacted customers and advised them on how to compensate reactive power where it is most efficient for the power system as a whole. Show less
-
-
-
Helen
-
Finland
-
Utilities
-
400 - 500 Employee
-
Master's thesis worker
-
Jan 2014 - Dec 2014
Subject: Forecasting the electricity use in a distribution company using scenario planning Aihe: Sähkönkäytön kehittymisen skenariointi jakeluverkkoyhtiössä Using Matlab, I programmed a tool for creating different long range scenarios of the spatial electricity use in the Helsinki area. I also applied scenario planning, namely the intuitive logics method, to creating four different scenarios of the development of electricity use in Helsinki until the year 2050. I also analyzed the consequences of these scenarios in two demonstration areas. Besides my thesis, I also participated in the implementation and testing of a new framework (TAP) which is used to process the AMR data collected from customers' electricity meters. Show less
-
-
-
Fortum
-
Finland
-
Utilities
-
700 & Above Employee
-
Technical customer advisor
-
Jul 2013 - Nov 2013
I advised customers and contractors about connecting to power grid. I handled requests for new connections and alterations to existing connection points and ordered field works from our contractors. I advised customers and contractors about connecting to power grid. I handled requests for new connections and alterations to existing connection points and ordered field works from our contractors.
-
-
-
Fortum
-
Finland
-
Utilities
-
700 & Above Employee
-
Technical customer advisor
-
May 2012 - Dec 2012
I advised customers and contractors about connecting to power grid. I handled requests for new connections and alterations to existing connection points and ordered field works from our contractors. I advised customers and contractors about connecting to power grid. I handled requests for new connections and alterations to existing connection points and ordered field works from our contractors.
-
-
-
Clevry
-
Finland
-
Human Resources Services
-
100 - 200 Employee
-
Compensation handler
-
Jan 2012 - Apr 2012
I handled damage reports and answered to compensation reclamations in a client company, Fortum Sähkönsiirto Oy. I handled damage reports and answered to compensation reclamations in a client company, Fortum Sähkönsiirto Oy.
-
-
-
Aalto University
-
Finland
-
Higher Education
-
700 & Above Employee
-
Research trainee
-
May 2011 - Aug 2011
I researched the effects of grid investments on the density of faults in a mid-voltage power grid. I researched the effects of grid investments on the density of faults in a mid-voltage power grid.
-
-
-
Aalto University
-
Finland
-
Higher Education
-
700 & Above Employee
-
Research trainee
-
May 2010 - Aug 2010
I researched the effects of grid investments on the density of faults in a mid-voltage power grid. I researched the effects of grid investments on the density of faults in a mid-voltage power grid.
-
-
Education
-
Aalto University
Master of Science (M.Sc.), Power systems -
Queensland University of Technology
-
Aalto University
Bachelor of Science (B.Sc.), Electrical and Electronics Engineering -
Helsingin luonnontiedelukio
Matriculation examination