Tudor Mihai Banciu

Project Manager at Yellowridge Construction Ltd.
  • Claim this Profile
Contact Information
Location
CA

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Mar 2022 - Present

    • Project Coordinator
      • Jan 2022 - Present

    • United States
    • Oil and Gas
    • Project Coordinator/ Jr. Estimator
      • Dec 2020 - Jan 2022
    • Canada
    • Architecture and Planning
    • 1 - 100 Employee
    • Field Project Coordinator
      • Jun 2019 - Dec 2020

      Duties • Foster relationships with clients • Meet with clients/subtrades on installation services performed and troubleshoot any concerns • Ensure all requirements are in place, including expected date of completion / install • Consistently communicate internally & externally regarding all scheduled activities in field • Raise and complete RFI’s as required • Arrange for subcontract work and manage installation subcontractor work as required • Create work orders and issue POs for project activities • Consistently communicate scheduled site activities with the sites and keep abreast of any delays • Arrange lane closers, equipment rentals and other project specific requirements as necessary • Create packing slips for shipping department • Close out production schedule as activities are completed • Maintain installation resource schedule and update daily as required • Attend construction meetings, oversee and coordinate field installations • Inform Project team and production team of potential changes in field • Ensure all photo and field surveys are documented and stored in a timely manner • Sign off on all installation purchase orders and invoices • Work diligently on closing out projects, identifying and completing deficiencies, ensuring customer satisfaction • Arrange follow up service, warranty or maintenance work • Ability to manage a project from start up to completion Major Projects YVR (Vancouver International Airport) - CORE Curbside Shuttle Relocation - CORE Existing Parkade Upgrade - Curbside Digital Displays - Pier D Expansion - Roadway Departures - Washroom Signage Upgrade TransLink - Rapid bus - Rapid bus Wayfinding - Canada Line - Canada Line Escalator - Lonsdale Quay Upgrade Also worked on several smaller projects for a variety of customers such as SFU, City of Parksville, HSBC, Aritzia, Ramada, Canada Place, City of Whistler, Minoru Centre, Swarovski to name a few. Show less

    • Canada
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Production Supervisor
      • Feb 2004 - Dec 2018

      Duties • Accomplished manufacturing staff results by communicating job expectations; planning, monitoring, and appraising job results; coaching, counseling, and disciplining employees; initiating, coordinating, and enforcing systems, policies, and procedures. • Maintained quality service by establishing and enforcing organization standards • Ensured operations of equipment by calling for repairs • Maintained safe and clean work environment by educating and directing personnel on the use of all control points, equipment, and resources; maintaining compliance with established policies and procedure • Contributed to team by accomplishing related results as needed • In charge of daily production targets supervising up to 8-9 employees making sure hourly and daily targets were met Projects • Water consumption – reduced water consumption at leak tester stations by installing auto fillers with high level detection. Major cost savings as previous set-up was constantly loosing water. Involved in defining scope, planning, executing and monitoring the project. • Change over time reduction – Set up tool cabinets with “home position” for each change over part and color coded for easy visualization. Involved in defining scope, planning, executing and monitoring the project. • In-line booth ergonomics and work flow improvement – Complete redesign of workflow to maximize productivity and improve ergonomics. Adjusting workstation height and repositioned tool at arm’s reach. Involved in defining scope, planning, executing and monitoring the project. • Lighting upgrade at final inspection station – Major upgrade to final inspection lighting by installing LED panels rated at 7000 lumens, reducing glare and shadows. Involved in defining scope, planning, executing and monitoring the project. Professional Development • First Aid level 2 ticket holder • Forklift License • Lean manufacturing training including 5S, Kanban, TPM and Heijunka Show less

Education

  • British Columbia Institute of Technology
    Project Management Associate Certificate (PMI recognized)
    2018 - 2021
  • Colegiul National Unirea

Community

You need to have a working account to view this content. Click here to join now