Tuan Nguyen Van
Maintenance Manager at KOREA - VIETNAM FERTILIZER CO., LTD. (KVF)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
KOREA - VIETNAM FERTILIZER CO., LTD. (KVF)
-
Chemical Manufacturing
-
1 - 100 Employee
-
Maintenance Manager
-
Jan 2023 - Present
Managing whole maintenance activities as:- As a leader of maintenance team, responsible to lead maintenance team.- Managing and planning maintenance and capital investment construction- Managing and planning preventive maintenance to improve the reliability of equipment on a daily, weekly, monthly, yearly.- Managing and supervising subcontractors- Managing the purchase request for maintenance material.- Managing and supervising in-house manufacture and reproduction for material- Instruction and training the maintenance ability to team members Show less
-
-
Mechanical Manager
-
May 2018 - Apr 2023
Maintenance and responsible to lead a part of mechanical and all of the maintenance activities related to Utility system, fire fighting system, static equipment, rotating equipment and piping:- Manage contractor for Annual maintenance Utility system and trouble shouting: Boiler, Chiller, Air compressor, Fire fighting system- Set up the engineering design, orders for new project. Manage, control the schedule, quality of new project.- Manage staffs and control the spare parts and consumables for maintenance. Such as managing the material inventory, the specification for procurement .- Making and reporting the plan and schedule to perform the preventive and predictive maintenance and improve the reliability of equipment on a daily, weekly, monthly, yearly.- Coordinating to repair, adjust and maintain production equipment, machinery, or instruments to ensure that it functions reliably and complies with process specifications.- Managing Contractor to carry out the outsourcing work for maintenance and other construction works. Show less
-
-
-
CECO, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Project Designer
-
Aug 2012 - Present
3D design by PDMS software in project “NPK Fertilizer plant with capacity of 150.000 MTPY” project.
-
-
Mechanical Designer
-
Aug 2012 - Feb 2013
Design 3D by PDMS software in project “DAP2 project” project.
-
-
-
Chemical Industry Engineering .,JSC
-
Vietnam
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Site Manager
-
May 2017 - May 2018
Site manager (I was youngest Site manager in the company): “Improved size classification system” in Petrovietnam Ca Mau Fertilizer Company limited (PVCFC)
-
-
Site Manager
-
Jan 2016 - Apr 2017
Machanical engineer for two project in Petrovietnam Ca Mau Fertilizer Company limited (PVCFC), In this company I was:- I’ve designed equipment, equipment layout and steel component as per: Belt conveyors; Screw conveyor; Rotatery drum, Piping layout.
-
-
HSE supervisor, Machanical supervisor
-
Mar 2013 - Dec 2015
In this project, I was did job as:- Mechanical supervisor installation, welding work, commissioning of: Amonia liquid Sphere tanks, Cylinder Tank, Vivration screen, Vibration feeder, Bag filter, Rotating Equipments (Like Agitator, electric hoise, pump, fan, rotatery drum, belt conveyor, screw conveyer, bucket elevator) , Rubber and brick lining for cylinder tank of Phosphoric acid plant, all Equipments of Na2SiF6 plant- Coordinator between EPC contractor and Foreign Sub-contractor for Rubber and Brick linning work inside of Acid tank Show less
-
-
Education
-
Hanoi University of Science and Technology