Ts. Mohd Ikhwan Hafiz Md Noor
Rolling Stock Maintenance Manager (Depot Manager) at KTMB- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Malay Full professional proficiency
Topline Score
Bio
Credentials
-
English @ Work for Engineers
Oxford Thames AcademyOct, 2021- Nov, 2024 -
Rolling Stock Management Basic Introduction of Wagon
KTM BerhadSep, 2020- Nov, 2024 -
Rolling Stock Management Basic Technology Locomotive
KTM BerhadSep, 2020- Nov, 2024 -
Industry4WRD Re-Skilling Programme Module 1,2 & 3 on Convergence of Lean Production System
Malaysia Automotive, Robotics and IoT Institute (MARii)Jan, 2020- Nov, 2024 -
Electrification Authorised Person Certificate
KTM BerhadOct, 2019- Nov, 2024 -
Computerized Maintenance Management System Course
TOMMS Systems Sdn BhdSep, 2019- Nov, 2024 -
The Rolling Stock Through Life Support Engineer
KTM BerhadSep, 2019- Nov, 2024 -
Transforming The Rolling Stock Engineering &Maintenance Management
KTM BerhadJan, 2019- Nov, 2024 -
EMU Traction & Propulsion Fundamental
Politeknik Sultan Azlan ShahAug, 2018- Nov, 2024 -
Contract Management Course
KTM BerhadOct, 2016- Nov, 2024 -
Maintenance Training of ETS Project
CRRC ZHUZHOU ELECTRIC CO., LTD.Jun, 2015- Nov, 2024 -
Operation & Maintenance Train Wash Plant
Wilcomatic LimitedOct, 2014- Nov, 2024 -
Hegenshiedt MFD Underfloor Wheel Lathe Training
HEGENSCHEIDT-MFD GmbHFeb, 2014- Nov, 2024 -
Operation Training of Electric Shunter
Zwiehoff GmbHFeb, 2014- Nov, 2024 -
Training Course of Bogie Drop Table
WINDHOFF Singapore Pte LtdFeb, 2014- Nov, 2024 -
Training Course of Mobile Lifting Jack
WINDHOFF Singapore Pte LtdFeb, 2014- Nov, 2024 -
Training of EMU Maintenance
CRRC ZHUZHOU ELECTRIC CO., LTD.Nov, 2011- Nov, 2024
Experience
-
KTMB Fan Page
-
Malaysia
-
Truck Transportation
-
100 - 200 Employee
-
Rolling Stock Maintenance Manager (Depot Manager)
-
Sep 2021 - Present
My role serves as Depot Manager or Rolling Stock Manager with the responsibility for carrying out maintenance of Non Electric Rolling Stock ( Locomotive & Wagon) and ensure are maintained in good working condition, safe and reliable.DUTIES AND RESPONSIBILITY1) Plan, execute and monitor preventive & corrective Maintenance of rolling stock and to ensure the task is deliver as according to the maintenance manual.2. To plan, deploy and manage all allocated resources in such a way as to secure optimal performance and the achievement of the unit’s financial and operational targets.3. Works closely with RSM Cargo and Technical Support Unit to develop effective solutions to achieve availability and reliability targets.4. Investigates and analysis of accident or failure; determines cause, develops, and implements resolutions or corrective actions.5 To lead and response in any incident and rescue (accident, derailment or breakdown) pertaining on rolling stock to achieve shorter response time to keep minimum service disruption. 6. Planning and review readiness of plant & machinery/ rescue crane and depot management.7. To monitor and ensure readiness of spare parts in Sub Store meet requirement of maintenance activities.
-
-
Rolling Stock Maintenance Engineer
-
Jan 2017 - Sep 2021
My role serves as Rolling Stock Maintenance Engineer with the responsibility for carrying out maintenance of Electric Train Rolling Stock ( ETS & EMU ) and ensure are maintained in good working condition, safe and reliable.Experienced Gained / Achievement :1) KTMB delegates of The 40th ASEAN Railway CEO Conference in Nay Pyi Taw, Myanmar ( 26 Nov 2018 ~ 29 Nov 2018). - Had opportunity to present a technical paper regarding depot maintenance improvement project to ASEAN railway delegates.2) KTMB delegates of the The 40th Joint Conference KTMB-SRT in Penang, Malaysia. ( 4th August - 8 August 2019).- Had opportunity to present a technical paper regarding " The KTMB Experience of Developing A Smart Sewerage Disposal System for Electric Train Set (ETS) " to delegates.Appointed as Technical Working Committee Member of KTMB tender project mainly related to the supply of the rolling stock parts.
-
-
Depot Equipment Engineer
-
Sep 2014 - Jan 2017
• To plan and monitor day to day maintenance of depot infrastructure and equipment , i.e. daily maintenance, scheduled/unscheduled maintenance of depot equipment according to Master Maintenance Schedule.• To plan maintenance and monitor performance of Underfloor Wheel Lathe Machine (Hegenshiedt) in Seremban Depot used for train wheel re-profiling work. • To plan and control the requirement and availability of consumable spare, spare parts and tools for ensuring the depot equipment maintenance activity can be perform smoothly.• To manage and control expenditure of administrative work (time, cost & manpower) at in effective manner according to KTMB's Management target.• To plan and prepare any scope of work, bill of quantity and department budget regarding any work that related to the depot equipment maintenance.Others contribution to the Company and Government :• Appointed as Technical Working Committee Member of E-Loco Project (The Lease of Two Units of Electric Locomotive . • Appointed as Technical Working Committee Member of government tender project mainly related to the KTMB Transformation Project.
-
-
Project Engineer
-
Sep 2011 - Sep 2014
1) Members of Seremban EMU Depot Project team.( Design, Construction, Completion, Testing & Commissioning of EMU Depot at Seremban ).- Maintains project schedule by monitoring project progress, coordinating activities and resolving technical issues.- Controls project plan by reviewing design, specifications, plan schedule changes and recommending actions.2) Capital Spares for MRO of Thirty Eight (38) set of Six (6) cars Electric Multiple Unit (MRO). (Sep 2012 ~June 2013)- Lead in Pre Shipment Inspection team for delivery of SCS Capital Spares in CSR Zhuzhou Electric Loco Co. Ltd factory on Nov 2013.3) Members of project team for “Upgrading & Modification Works at Sentul EMU Depot, Tjg Malim Yard and Rawang Pit Line.(Oct 2011 ~ May 2012).- Maintains project schedule by monitoring project progress, coordinating activities and resolving technical issues.- Controls project plan by reviewing design, specifications, plan schedule changes and recommending actions.4) Members of Computer Maintenance Management System (CMMS) Working Committee for Seremban Depot Project. (Mei 2013 ~ Dec 2013).
-
-
-
NAZA AUTOMOTIVE MANUFACTURING SDN BHD
-
Malaysia
-
Automotive
-
1 - 100 Employee
-
Project Engineer (Body Shop)
-
Mar 2010 - Sep 2011
Responsibilities : To plan and & execute on new models preparation, facilities improvement, upgrading and others engineering project as per plan. To check activities conducted by vendors, contractor and supplier in operation and delivery. To prepare and coordinate with contractors in engineering project based detail specification, proposal, quotation, evaluation, PDI, installation and commissioning. To continuously optimize and improve current facilities, methods and materials which will give beneficial to production, quality, workability, safety and cost. To assist production and maintenance management to achieve production target.Experienced Gained/ Achievement: Project members (Body Assembly) of TD 11 Project. (Dec 2010~ February 2011)- Plan schedule for 4M preparation of TD 11 project.- Lead in Pre Delivery Inspection Jig at Kyung Ki Co Ltd ,Gyeonggi-do, S.Korea. (Nov 2010)- Lead in TD 11 Body Shop Process Familiarization Trip at Thaco Kia , Quang Nam, Vietnam. (Nov 2010)- Assist in installation structure Body Shop main line for TD Project. (Dec 2010)- Plan for improvement & countermeasure on problem detected during Trial & PP stage. Project members (Body Assembly) of TD 11 Moving Project. (April 2011~June 2011)- Plan schedule for 4M preparation of TD 11 Moving project.- Lead in dismantling & installation of body shop line for TD Moving project (April 2011)- Plan for improvement & countermeasure on problem detected during Trial & PP stage. Representative of NAZA for Ulsan Business Meeting in July 2010 for sourcing competitive company in Korea specialized in jig fabrication, CF fabrication & body shop automation.Training Courses attended: a) Failure Mode & Effect Analysis (FMEA)b) Resistance Welding Seminar 3c) APQP & PAPPd) Lean Manufacturing
-
-
-
Lumileds
-
Semiconductor Manufacturing
-
700 & Above Employee
-
Production Supervisor
-
Aug 2009 - Mar 2010
Responsibilities: Meet production schedule in accordance with the build plan. Plan available resources in the area of people, material, space and equipment to effectively meet production schedules, cost targets and quality standards. Surface out issues. Initiate corrective actions to meet production targets. Ensure operations are conforming to Control plan & Process specifications. Improve line performance in a structured approach. Responsibilities: Meet production schedule in accordance with the build plan. Plan available resources in the area of people, material, space and equipment to effectively meet production schedules, cost targets and quality standards. Surface out issues. Initiate corrective actions to meet production targets. Ensure operations are conforming to Control plan & Process specifications. Improve line performance in a structured approach.
-
-
Education
-
Universiti Teknikal Malaysia Melaka
Bachelor’s Degree, Manufacturing Engineering -
Kolej Universiti Teknikal Malaysia Melaka
Diploma, Manufacturing Engineering