Truls S. Ekeberg

Project Manager at Seasystems AS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Norway
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • Jun 2020 - Present

      November 2021 - ongoingPM Wagenborg LQDesign, fabrication and delivery of hull brackets and DACS for LQ. Mooring analysis verification together with 7waves.August 2020 - April 2022PM MOL FSUsDesign, fabrication and delivery of hull brackets and DACS for FSUs. Mooring analysis verification together with 7waves.June 2018 - August 2020PM Havfarm 1 with design, fabrication and delivery of anchors, chain, chain stoppers, turret, pull-in winch, power from shore, hang-off, swivel solution and ROV tools.Follow up Havfarm equipment installation at CIMC yard in Yantai and Haiyang. Planning for all offshore installation works in Norway. -Vryhof, Vichinay, CIMC, Semar, Core Marine, Trolex, Scanmatic, Adria Winch, Partnerplast, Nexans, OTS Certex, Seasystems, DNVGL, DOF. Nordlaks Show less

    • Project Manager and Technical Project Manager
      • Feb 2014 - Jun 2020

      •FPSO / FSO offloading systems •Mooring winches for FPSO units•Turret and buoy solutions•FEED and special design projects•Fishfarms, swivel, anchors, pull-in, chain stoppers, turret•Cable design, hang-off, pull-in, landfall, protection •Cathodic Protection and surface coating design, Material selection and design, Finite element analysis, Fatigue

    • Norway
    • Construction
    • 700 & Above Employee
    • Senior Consultant Structural Engineer / Structural Lead
      • Feb 2009 - Feb 2014

      •Demolition analysis using FEA of Jacket and Topside structures •Lifting analyses, Site Move and Set Down analyses •DNV standards, Norsok and client requirements •Demolition analysis using FEA of Jacket and Topside structures •Lifting analyses, Site Move and Set Down analyses •DNV standards, Norsok and client requirements

  • Ekeberg Engineering
    • Oslo Area, Norway
    • CEO
      • Jan 2007 - Jan 2014

  • Apply Nemo
    • Oslo Area, Norway
    • Consultant Senior Subsea/Structural Engineer
      • Oct 2007 - Feb 2009

      •Technical; Analysis (ULS, FLS and ALS) of subsea structures •Manager; Coordination and verification of approx. 4-5 engineers and draftsmen, within the structure department. •Adm. Reporting to Statoil •DNV standards, Norsok and Statoil requirements •Technical; Analysis (ULS, FLS and ALS) of subsea structures •Manager; Coordination and verification of approx. 4-5 engineers and draftsmen, within the structure department. •Adm. Reporting to Statoil •DNV standards, Norsok and Statoil requirements

  • Apply Sørco AS
    • Stavanger Area, Norway
    • Consultant Senior Structural Engineer
      • Jan 2007 - Oct 2007

      •Main re-analysis (ULS, FLS and ALS) and reinforcements of Snorre A steel deck in relation to modification of lifeboat platform and extension of LQ. •Coordination and verification of approx. 4-5 engineers and draftsmen, within the structure department. •Weight reporting and marine operations. •DNV standards and Norsok code •Main re-analysis (ULS, FLS and ALS) and reinforcements of Snorre A steel deck in relation to modification of lifeboat platform and extension of LQ. •Coordination and verification of approx. 4-5 engineers and draftsmen, within the structure department. •Weight reporting and marine operations. •DNV standards and Norsok code

    • Norway
    • Oil and Gas
    • 100 - 200 Employee
    • Senior Structural Engineer
      • Nov 2005 - Jan 2007

      •Main analysis (ULS, FLS and ALS) of Aker H6e LQ structure in aluminium. •Detailed finite element analysis and relevant hand calculations. •Coordination and verification of approx. 6-8 engineers and draftsmen within the structure department. •Scope of work, man-hours, quality assurance, plan and progress. •Weight reporting and marine operations. •DNV standards and Norsok code. •Costumer contact and follow-up •Main analysis (ULS, FLS and ALS) of Aker H6e LQ structure in aluminium. •Detailed finite element analysis and relevant hand calculations. •Coordination and verification of approx. 6-8 engineers and draftsmen within the structure department. •Scope of work, man-hours, quality assurance, plan and progress. •Weight reporting and marine operations. •DNV standards and Norsok code. •Costumer contact and follow-up

    • Norway
    • Public Safety
    • 700 & Above Employee
    • Engineer
      • Jan 2001 - Nov 2005

      Bondship Adhesive bonding testing and qualification Adhesive bonding within marine applications. Testing program, analysis and reporting. BP JIP- Corrosion protection and maintenance. Pretension of bolts in corrosive environment. Establish “state of art” practice. FMC Kongsberg Subsea Testing and Failure Investigation HCR Umbilicals or aramid fibres. Health and Safety Long term characterizing adhesives through thickness Statoil ASA Langeled Design Verification Valves and subsea components Talgo OY Talgo Train Fire aspects on composite materials Shell Subsea Manifold Titanium seals Methanol Pressure testing MTP 361/Exxon Sloshing testing and verification of LNG carriers Scaled model 1/20 of LNG carrier tank Oceanering International Design verification of HCR umbilical hoses Lifetime testing of OMUS supplied samples MTP 361/Exxon Verification of LNG carriers, new tank design Sloshing at low filling rates BSW Verification of Ballgrab Anchor Connector Finite element analysis Fatigue assessment Baker Hughes Norge Drilling technology, MPR Finite element analysis Crack growth assessment Statoil ASA Åsgard F.line Examination leaking field joint Finite element analysis of crack propagation Norske Shell Ormen Lange Down hole valve qualification Test follow-up Norske Shell Garn West Manifold Qualification and assessment Sonsub S.p.A. SIRCoS Certification Qualification of subsea pipeline repair system Green stream. Statoil ASA Visund Piperack Reliability assessment and finite element analysis Lyse Gass AS Verification of valves Remacut Clamp certification Qualification of subsea pipeline repair system Green stream. Hydro Ormen Lange Fatigue testing of pipe material on Establish SN-curves. Show less

Education

  • University of Oslo
    Cand Scient
    1996 - 2001

Community

You need to have a working account to view this content. Click here to join now