Tri Windarto
Workshop and Project Manager at PT Papertech Indonesia- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT Papertech Indonesia
-
Packaging and Containers Manufacturing
-
1 - 100 Employee
-
Workshop and Project Manager
-
May 2022 - Present
Leads Workshop and Project Conitex Engineering Indonesia. Ensure smooth of workshop operations, project management, involve in supplier selection, incoming quality control, drawing Management and part management. > ensure workshop run smoothly & efficient through great safety, 5S, team work, documentation, great planning, continuous improvement and standard work > arrange production plan on Conitex Engineering activity, inventory and control > Implement ISO 9001 : 2015 and ISO 14001 : 2015 > Support Engineering Manager for improvement system through SPS > Develop team member conitex engineering > Ensure implemented drawing of design machine appropriate on assembly > Communication and involve with design team related new machine Show less
-
-
-
PT KSB Indonesia
-
Indonesia
-
Production Manager
-
Sep 2021 - Mar 2022
My responsibility: - supervise, mentoring 55+ team member include Deputy manager and Supervisor. - Accountable for production strategy at Fabrication, machining, painting and assembly to achieve production target - Monitoring and analisys production plan base on S&OP - Responsible for Man power utilization and effectiveness production process - Accountable and responsible for implementation safety program to make sure save condition in production. - Responsible for in Quality and Lean implementation - Responsible for Maintenance, develop and supervisi maintenance program such as schedule, TPM, spare part management, MTBF, MTTR Show less
-
-
-
Caterpillar Inc.
-
United States
-
Machinery Manufacturing
-
700 & Above Employee
-
-
Jan 2018 - Jun 2021
My responsibility:1. Lead and Manage Manufacturing engineering Dept with scope Fabrication, Painting, workshop for continuous improvement, Assembly and Maintenance.2. Lead implemented NPI – manufacturing process, coordination with Operation department, Quality Department, Supply chain Department and Logistics Department.3. Design and execute Capacity plan facility, analyze utilization machine and equipment.4. Lead maintenance team, to make sure maintenance program running well.5. Control maintenance schedule, repair, Preventive and Predictive Maintenance.6. Planning and Control maintenance budget, spare part and capital7. Control and enforce TPM system, maintenance procedures, OEE.8. As Coordinator Caterpillar Indonesia facility, for coordination with Hydraulic excavator manufacturing engineering (HEME) as center of manufacturing EXD facility to implemented common process9. Set-up number of Manpower for running production as production capacity needed and efficient10. Initiate to make common process of manufacturing Hydraulic Excavator 320NGH and 313 LGP base on Manufacturing requirement Caterpillar.11. SAP (PP Module) - Create manufacturing Bill of Material (MBoM), Routing end to end process12. Create any deviation related the product, for example related material substitution, Product dimension, etc13. Responsible for APQP document (characteristic matrix, flow process, PFMEA and control plan)14. Initiate Continuous improvement idea related product quality, velocity and cost as well as solving any quality issue.15. SFMEA prior running manufacturing process to make sure save work environmental and safety for employee, reduce safety risk for current process16. Planning and control capital expense for improvement in manufacturing engineering17. Internal auditor and as auditee for Caterpillar QMS base on ISO 9001 – 2015 Show less
-
-
-
Oct 2014 - Jan 2018
My responsibility:1. Design manufacturing process from fabrication, painting, assembly and PDI than control all process running well according to plan.2. Responsible for implemented NPI - Manufacturing Process.3. Manage manufacturing engineer among others welding engineer, painting, machining and assembly.4. Ensure capacity plan on SAP appropriate with actual5. Provide and develop APQP document (Characteristics matrix, Flow Process, PFMEA, and Control plan).6. Initiate Continuous Improvement idea related product quality, velocity and cost as well as resolving any quality issue7. Provide, develop and control Standard work for ensure Process meet requirement, Quality standard and safety standard.8. Planning and control capital for improvement in process engineering.9. Initiate, develop and Control manufacturing process to make common process for fabrication, painting and assembly.10. Internal Auditor and Auditee for Caterpillar QMS base on ISO 9001, 200811. Responsible for safety risk assessment prior running manufacturing process and reduce risk for current process Show less
-
-
-
Oct 2012 - Sep 2014
1. Design manufacturing process for fabrication process, control all process running well according to plan. 2. Design capacity plan fabrication and ensure capacity plan on SAP appropriate with actual.3. Initiate Continuous Improvement idea in fabrication area related product quality, velocity and cost as well as resolving any quality issue.4. Provide and develop APQP document fabrication area ( Characteristics matrix, Flow Process, PFMEA, and Control plan).5. Design tools and fixture for fabrication process include lifting device and improvement.6. Conduct Safety risk assessment. Show less
-
-
-
-
-
Jan 2009 - Sep 2012
1. Responsibility for maintenance Casting area start from melting, molding and finishing.2. Full support for planning in production to ensure production goal achieve with reduce/ minimize down time casting area.3. Planning & control preventive maintenance weekly, monthly and annually casting area.4. Initiate Continuous Improvement idea related product quality, velocity and cost as wel as resolving any quality issue5. Arrangement preventive and troubleshooting activity, control spare part machine, arrangement & control maintenance monthly planning activity, planning forecast annually with control plan forecast monthly, control and enforce maintenance procedures, 6. Review and recommend cost effective solution, review / analyse troubleshooting and improvement activity.7. Manage 60 team member of maintenance casting ( operator, leader, foreman, staff grade 3 and staff grade 4) Show less
-
-
-
Jun 2005 - Dec 2008
1. Responsibility for maintenance Casting melting and permanent mold area.2. Full support for planning in production to ensure production goal achieve with reduce/ minimize down time melting area.3. Planning & control preventive maintenance weekly, monthly and annually melting area.4. Arrangement preventive and troubleshooting activity, control spare part machine, arrangement & control maintenance monthly planning activity, planning forecast annually with control plan forecast monthly, control and enforce maintenance procedures, 5. Review and recommend cost effective solution, review / analyse troubleshooting, TPM activity, MTBF and MTTR review, improvement activity.6. Continually improvement for increase efficiency machine.Internal auditor ISOTS 16949, ISO 14001 and OHSAS 18001 Show less
-
-
Education
-
Diponegoro University
Sarjana Teknik, Mechanical Engineering