Tony Pepe

Operations Manager at Niepe Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Cert IV in Civil Construction Supervision
    Training & Assessment Mentor
    May, 2021
    - Nov, 2024
  • Licence to Perform High Risk Work (Forklift)
    Queensland Government
    May, 2021
    - Nov, 2024
  • Licence to Perform High Risk Work (C1, CN, CV, DG, RA, SA, WP)
    Worksafe Western Australia
    Oct, 2020
    - Nov, 2024
  • QBCC Supervisor Licence (Carpentry & Concreting)
    QBCC
    Dec, 2020
    - Nov, 2024

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Operations Manager
      • Jul 2007 - Present

      This is an active (site-based) Director role also performing the working site supervisor role for several of Niepe projects. This is an active (site-based) Director role also performing the working site supervisor role for several of Niepe projects.

    • Australia
    • Construction
    • 700 & Above Employee
    • Site Supervisor
      • 2002 - 2007

      Working with a team to construct concrete elements on several major civil construction sites,With a very high regard for Safety, Quality, Environmental, costing & program.

    • Leading Hand
      • 2000 - 2002

      Working with a team to construct concrete elements on several major civil construction sites,With a very high regard for Safety, Quality, Environmental, costing & program.

  • Baulderstone Clough JV
    • Perth, Australia
    • Foreman
      • 1997 - 2000

      This role involved supervising the following works on the Northbridge Tunnel in Perth WA: - Pouring of diaphragm walls - Tunnel roof, wall and floor construction - Forming and pouring of pump station base walls and roof structures - The spraying of fire retardant on the tunnel walls on night shift. This role involved supervising the following works on the Northbridge Tunnel in Perth WA: - Pouring of diaphragm walls - Tunnel roof, wall and floor construction - Forming and pouring of pump station base walls and roof structures - The spraying of fire retardant on the tunnel walls on night shift.

    • Switzerland
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Foreman
      • 1996 - 1997

      I was involved in the following works at the Collie Power Station; - Erecting and dismantling support systems for suspended slabs, - Placing and finishing of concrete, - Forming of bases, columns, walls, pits and the erection of the slip form for the 165m Stack, - Pouring the concrete, placement of block-outs and the tying of reinforcement. I was involved in the following works at the Collie Power Station; - Erecting and dismantling support systems for suspended slabs, - Placing and finishing of concrete, - Forming of bases, columns, walls, pits and the erection of the slip form for the 165m Stack, - Pouring the concrete, placement of block-outs and the tying of reinforcement.

    • Structures Foreman
      • Jan 1995 - Dec 1995

      I was involved in the Tung Chung Express Way building 3 incremental launch bridges, including; - Placing and finishing of concrete, - Erecting and dismantling scaffolding, - Forming up of pile caps, abutments, piers, headstocks and parapets, - Reading and interpreting design plans, as required. I was involved in the Tung Chung Express Way building 3 incremental launch bridges, including; - Placing and finishing of concrete, - Erecting and dismantling scaffolding, - Forming up of pile caps, abutments, piers, headstocks and parapets, - Reading and interpreting design plans, as required.

    • Construction
    • 1 - 100 Employee
    • Rigger/Scaffolder
      • 1993 - 1995

      I was involved in Dalrymple Bay coal loading facility: - Directing the movement of cranes - Driving Piles - Erecting headstocks - Steel structures, - Conveyor belts - Pipe Works - Scaffolding I was involved in Dalrymple Bay coal loading facility: - Directing the movement of cranes - Driving Piles - Erecting headstocks - Steel structures, - Conveyor belts - Pipe Works - Scaffolding

    • Scaffolder
      • 1992 - 1993

      I was involved in; - Erecting and dismantling scaffold (both modular and tube fitting). I was involved in; - Erecting and dismantling scaffold (both modular and tube fitting).

    • Mining
    • 700 & Above Employee
    • Labourer / Concrete Finisher
      • 1990 - 1992

      I was involved in projects in Gove and Karratha; - Forming and stripping on bases, columns, retaining walls, tanks and foundations, - Tying of steel reinforcing, placing and finishing concrete. I was involved in projects in Gove and Karratha; - Forming and stripping on bases, columns, retaining walls, tanks and foundations, - Tying of steel reinforcing, placing and finishing concrete.

  • V & M Pepe
    • Belmont, Perth
    • Concretor
      • 1983 - 1990

      Family owned business, working and supervising jobs including; Redcliffe Bridge, Tonkin Hwy WA (incremental launch bridge over the Swan River) and other small approach bridges; Midland TAFE, WA; Thiess West Perth office building. Family owned business, working and supervising jobs including; Redcliffe Bridge, Tonkin Hwy WA (incremental launch bridge over the Swan River) and other small approach bridges; Midland TAFE, WA; Thiess West Perth office building.

Education

  • La Salle College Middle Swan WA
    1981 - 1983

Community

You need to have a working account to view this content. Click here to join now