Tony Pepe
Operations Manager at Niepe Construction- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Cert IV in Civil Construction Supervision
Training & Assessment MentorMay, 2021- Nov, 2024 -
Licence to Perform High Risk Work (Forklift)
Queensland GovernmentMay, 2021- Nov, 2024 -
Licence to Perform High Risk Work (C1, CN, CV, DG, RA, SA, WP)
Worksafe Western AustraliaOct, 2020- Nov, 2024 -
QBCC Supervisor Licence (Carpentry & Concreting)
QBCCDec, 2020- Nov, 2024
Experience
-
Niepe Construction
-
Australia
-
Construction
-
1 - 100 Employee
-
Operations Manager
-
Jul 2007 - Present
This is an active (site-based) Director role also performing the working site supervisor role for several of Niepe projects. This is an active (site-based) Director role also performing the working site supervisor role for several of Niepe projects.
-
-
-
CPB Contractors
-
Australia
-
Construction
-
700 & Above Employee
-
Site Supervisor
-
2002 - 2007
Working with a team to construct concrete elements on several major civil construction sites,With a very high regard for Safety, Quality, Environmental, costing & program.
-
-
Leading Hand
-
2000 - 2002
Working with a team to construct concrete elements on several major civil construction sites,With a very high regard for Safety, Quality, Environmental, costing & program.
-
-
-
Baulderstone Clough JV
-
Perth, Australia
-
Foreman
-
1997 - 2000
This role involved supervising the following works on the Northbridge Tunnel in Perth WA: - Pouring of diaphragm walls - Tunnel roof, wall and floor construction - Forming and pouring of pump station base walls and roof structures - The spraying of fire retardant on the tunnel walls on night shift. This role involved supervising the following works on the Northbridge Tunnel in Perth WA: - Pouring of diaphragm walls - Tunnel roof, wall and floor construction - Forming and pouring of pump station base walls and roof structures - The spraying of fire retardant on the tunnel walls on night shift.
-
-
-
ABB
-
Switzerland
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Foreman
-
1996 - 1997
I was involved in the following works at the Collie Power Station; - Erecting and dismantling support systems for suspended slabs, - Placing and finishing of concrete, - Forming of bases, columns, walls, pits and the erection of the slip form for the 165m Stack, - Pouring the concrete, placement of block-outs and the tying of reinforcement. I was involved in the following works at the Collie Power Station; - Erecting and dismantling support systems for suspended slabs, - Placing and finishing of concrete, - Forming of bases, columns, walls, pits and the erection of the slip form for the 165m Stack, - Pouring the concrete, placement of block-outs and the tying of reinforcement.
-
-
-
Leighton Asia, India and Offshore
-
Hong Kong
-
Structures Foreman
-
Jan 1995 - Dec 1995
I was involved in the Tung Chung Express Way building 3 incremental launch bridges, including; - Placing and finishing of concrete, - Erecting and dismantling scaffolding, - Forming up of pile caps, abutments, piers, headstocks and parapets, - Reading and interpreting design plans, as required. I was involved in the Tung Chung Express Way building 3 incremental launch bridges, including; - Placing and finishing of concrete, - Erecting and dismantling scaffolding, - Forming up of pile caps, abutments, piers, headstocks and parapets, - Reading and interpreting design plans, as required.
-
-
-
Transfield Power & Constructions
-
Construction
-
1 - 100 Employee
-
Rigger/Scaffolder
-
1993 - 1995
I was involved in Dalrymple Bay coal loading facility: - Directing the movement of cranes - Driving Piles - Erecting headstocks - Steel structures, - Conveyor belts - Pipe Works - Scaffolding I was involved in Dalrymple Bay coal loading facility: - Directing the movement of cranes - Driving Piles - Erecting headstocks - Steel structures, - Conveyor belts - Pipe Works - Scaffolding
-
-
-
World Services & Construction
-
QLD & WA
-
Scaffolder
-
1992 - 1993
I was involved in; - Erecting and dismantling scaffold (both modular and tube fitting). I was involved in; - Erecting and dismantling scaffold (both modular and tube fitting).
-
-
-
Thiess
-
Mining
-
700 & Above Employee
-
Labourer / Concrete Finisher
-
1990 - 1992
I was involved in projects in Gove and Karratha; - Forming and stripping on bases, columns, retaining walls, tanks and foundations, - Tying of steel reinforcing, placing and finishing concrete. I was involved in projects in Gove and Karratha; - Forming and stripping on bases, columns, retaining walls, tanks and foundations, - Tying of steel reinforcing, placing and finishing concrete.
-
-
-
V & M Pepe
-
Belmont, Perth
-
Concretor
-
1983 - 1990
Family owned business, working and supervising jobs including; Redcliffe Bridge, Tonkin Hwy WA (incremental launch bridge over the Swan River) and other small approach bridges; Midland TAFE, WA; Thiess West Perth office building. Family owned business, working and supervising jobs including; Redcliffe Bridge, Tonkin Hwy WA (incremental launch bridge over the Swan River) and other small approach bridges; Midland TAFE, WA; Thiess West Perth office building.
-
-
Education
-
La Salle College Middle Swan WA