Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • 事业部总经理
      • Jan 2018 - Present

      Overall responsible for Electrolyte group management: 1、Overall responsible for P&L management 2、Direct and control Operation、Logistic、Sales、Finance & HR as well as capital projects、strategy planning & day to day management 3、To manage the supply line chain with low assets (equipment and inventory), good customer service (designed for flexibility), providing high quality products (meeting customer expectations) and the minimum required organization (frugal in its attitude) striving for excellence 4、To be responsible for the supply of products as defined in the annual budgets 5、To be responsible for the process optimizes and innovation as well as new product bring in Lean implementation utilizing 5S, Lean Manufacturing, Tinci tool box and Kanban techniques resulting in operational excellence and productivity gains 6、Maintains a positive can-do team atmosphere within the Value Stream; holding regular team meetings and assigning team members’ tasks and coordinate support services needed outside the team Main Achievements:  Revenue 2 billion RMB and top 1 electrolyte vendor worldwide  Contribute to excellence business model and positive company culture set up  Contribute to best in operation management and continuous innovation Show less

    • General Manager
      • Nov 2015 - Jan 2018

      Overall responsible for Cosmetic Supply Line Chain Management as well as Jiujiang Manufacture Base operation management, with revenue more than 1 billion RMB in 2016 as well as 33%+ net margin 1、To manage the supply line chain with low assets (equipment and inventory), good customer service (designed for flexibility), providing high quality products (meeting customer expectations) and the minimum required organization (frugal in its attitude) striving for excellence 2、To be responsible for the supply of products as defined in the annual budgets 3、To be responsible for the process optimize and innovation as well as new product bring in 4、To be responsible for the OTM projects with external International Companies like P & G、Ashland.,etc 5、To be accountable for the production and quality of all products required by the company at a cost level that provides an advantage over competition 6、Supervise quality control procedures to ensures strictly adherence to cooperate standards 7、Lean implementation utilizing 5S, Lean Manufacturing, ITW tool box and Kanban techniques resulting in operational excellence and productivity gains 8、Maintains a positive can-do team atmosphere within the Value Stream; holding regular team meetings and assigning team members’ tasks and coordinate support services needed outside the team Show less

    • United Arab Emirates
    • Advertising Services
    • 1 - 100 Employee
    • Plant Manager
      • Jul 2014 - Oct 2015

      Overall responsible for plant operation which include Manufacture、EHS、Quality、Logistic、Customer Service as well as Engineering & Capital Projects Management to build a world class operation bench mark site for ITW:1、To manage a plant with low assets (equipment and inventory), good customer service (designed for flexibility), providing high quality products (meeting customer expectations) and the minimum required organization (frugal in its attitude) striving for excellence2、To be responsible for the supply of products as defined in the annual budgets3、To be accountable for the production and quality of all products required by the company at a cost level that provides an advantage over competition4、Supervise quality control procedures to ensures strictly adherence to global standards5、Lean implementation utilizing 5S, Lean Manufacturing, ITW tool box and Kanban techniques resulting in operational excellence and productivity gains6、Maintains a positive can-do team atmosphere within the Value Stream; holding regular team meetings and assigning team members’ tasks and coordinate support services needed outside the team7、Ensure compliance with all applicable legal and regulatory requirements and best practices in the industry; Ensure the Quality, Health & Safety and Environmental systems are adhered and maintained to meet local legislation and company policy requirements Show less

    • Project Engineering Manager
      • May 2013 - Jun 2014

      Job Responsibility:Assist the Project Director to set up the new chemical plant in China to meet business strategy requirement; Overall responsible for project set up, approval, construction and operation startMain Achievements:1、Successfully obtain the necessary government approvals on new chemical company set up2、Well controlled project safety、schedule、quality & cost which is in accordance with cooperate requirements as below: 2.1 “0” accidents throughout the construction period 2.2 Site start one month in advance of original schedule 2.3 Pass all the third parities quality check as well as internal cooperate project committee check & accept 2.4 Well controlled budget within approved Capex and set up good supplier management3、Successfully lead project team & commissioning team to ensure a good PCS and project transfer to operation Show less

    • Engineering & QA Manager
      • Jul 2011 - Apr 2013

      Job Responsibility:Overall lead capital investment and responsible for project set up, approval, construction and start up, budgeting and cost forecast as well as project process management; Take charge of company Quality Assurance system management1、 Take charge of site capital construction. Overall response for design、construction、 installation and detail project process management;2、 Work on the project safety、communications、permits、contracts、procedures, etc;3、 Develop the project pcs (pre-commission, commissioning & start up) and rto (ready to operate) strategy, documentations and procedure, etc;4、 Work together with DGM and GM on the project spending control, forecast, contractor evaluation and selecting、equipment purchasing., etc;5、 Base on the corp. operations requirement and work with general contractor on the project safety、quality、cost、time schedule、people and field management;6、 Overall response QA department daily management; Take charge of customer complaints treatment、quality system maintain 、third parties audit and site CIP; Main Achievements:1、 Obtain related approvals & certifications of Phase One 、Phase Two and AAM expansion projects which includes FSR、SPA & SCA、EPA & ECA、FF Approval、Land & Building Property., etc successfully; 2、 Assist DGM well controlled these projects, successfully transferred the production technique from US BUs to local site; Normal operation started from July 17th, 2008 and expansion project started from May 17th, 2012;3、 As the project manager of AAM Expansion Project, well controlled site operation and reach the expected EHS、Quality、Cost and Schedule Goal; Well filing and recording project information and built a solid Engineering and Production team for operation;4、Set Up QC and QA Department. Successfully bring in ISO 9001:2008、ISO14001:2003 and OHSAS 18001 system; Well lead customer complaint treatment process and site CIP work; Well controlled site daily operations and reached the company quality target; Show less

    • Engineering & QC Manager
      • Dec 2009 - Jun 2011

Education

  • Yangtze University
    Bachelor degree, Chemical Engineering

Community

You need to have a working account to view this content. Click here to join now