Tommy Selnes
Daglig Leder at NordicDx as- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
NordicDx as
-
Norway
-
Health, Wellness & Fitness
-
1 - 100 Employee
-
Daglig Leder
-
Jul 2020 - Present
-
-
-
-
Opportunity explorer Manager
-
May 2020 - Jul 2020
-
-
-
Statoil
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
commissioning eng Cranes Johan Sverdrup, Statoil
-
Apr 2017 - May 2020
JS engagement completed. Proud to have been a part of this mega project, exiting opportunities in the tube ;-) JS engagement completed. Proud to have been a part of this mega project, exiting opportunities in the tube ;-)
-
-
-
-
Co Founder Owner
-
Nov 2016 - Apr 2017
-
-
-
Techteam Solutions
-
Sandnes Norway
-
Project engineer
-
Jul 2015 - Oct 2015
-
-
-
Statoil
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Engineering manager/Installation manager
-
Dec 2011 - May 2015
• Enginering Manager /Installation Manager in Statoil CDT ( Crane Delivery Team), technical support MOD. • Technical responsibility, mainly related to offshore deck crane upgrades and change-out including complete package(s) with regard to change control /site surveys /start-up studies/ engineering / design / interface control / planning / pre-fabrication /auditing/ installation / mechanical completion / commissioning / acceptance test / handover to operations / final documentation / invoice control. • Planning of installations and all other follow up activities incl MC/Commissioning and RFOC of various crane and material handling systems including i.e various EOT crans, Heila shipboard cranes(wireline) and offshore deck-crane change out`s or modification`s • Expert experience regarding new development and follow up on a new generation fully electric powered decks cranes for Statoil platforms.
-
-
-
Seadrill
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Project manager/package responsible
-
Aug 2008 - Dec 2011
• Technical responsibility, mainly related to offshore deck cran upgrades and change-out including complete package(s) with regard to change control /site surveys / engineering / design / interface control / planning / pre-fabrication /auditing/ installation / mechanical completion / commissioning / acceptance test / handover to operations / final documentation / invoice control. • Liaise with relevant personnel in the rig operations team onshore and onboard the rig. • Monitor progress, and report progress to the project planner. • Co-ordinate with DnV or other 3`rd party involvement - as the case may be. • Ensure that the work process and the end result are documented according to requirements. • Liaise with the rig operations engineer with regard to reviewing and accepting final documentation. • Attend FATs, receiving inspection, etc. • Installation management on site / offshore installation • Prepare acceptance documentation for the WP (MC and Comm.) • Handover of equipment/ machinery/ structure/ final documentation to the relevant area responsible on the rig/platform
-
-
-
-
Onshore installation Manager / Project Manager
-
Feb 2003 - Aug 2008
• Ispolin Drilling Module refurbishment/installation Rosneft • Draupner S deck crane replacement Statoil • Snorre A Deck crane replacement Statoil • Frigg Cessation project Aker Offshore Partner • Norne service crane study Statoil • Ispolin Drilling Module refurbishment/installation Rosneft • Draupner S deck crane replacement Statoil • Snorre A Deck crane replacement Statoil • Frigg Cessation project Aker Offshore Partner • Norne service crane study Statoil
-
-
-
-
Project engineer/Managment
-
Jan 2002 - Feb 2003
. Project engineer Vigdis & Tordis template subsidence correction project including concept study, engineering, testing and offshore installation procedures. Project manager for various project; design production and installation of anchor monitoring system on Jotun A, Exxon Mobile. Study and design of lifting arrangement for handling of HP compressor motor on Balder Exxon Mobile. Part Advisory consultancy, technical procurement and operational support of various subsea related solutions including ROV interfaced remote tooling systems, and structural requirements to single-lift platform removal , Twin Marine Lifting concept.
-
-
-
-
Operation Manager
-
Apr 2001 - 2002
Initialisation and implementation of services within Scandinavia for TechnospaMech S.P.A (Italy). Responsible for establishing base of operations including market infusion within Scandinavia for Italian based subsea tooling services organisation, with specialty in sub-sea 'diamond-wire cutting' Initialisation and implementation of services within Scandinavia for TechnospaMech S.P.A (Italy). Responsible for establishing base of operations including market infusion within Scandinavia for Italian based subsea tooling services organisation, with specialty in sub-sea 'diamond-wire cutting'
-
-
-
-
General Manager
-
Jan 1994 - Jan 2000
1997 - 1999 Lifting And Marine Consultant West Navion Project • to coordinate and organise marine operations • to supervise and follow up all module lifting activities • organising and supervision of jacking, levelling and final positioning of all raised decks and modules onboard the vessel • Factory Acceptance Tests prior to release of MAN deck cranes • Co-ordination of installation of subject crans, including certification activities • direct coordination with DnV and NPD/NMD, both prior to, during and following installation, to ensure Authority approval of the cranes. 1997 Project Engineer Transocean/Procon engineering of the Draugen drilling module: • participating in offshore survey’s • pre-engineering including method and feasibility studies • responsibility for obtaining approval of lifting procedures • identification of equipment requirements • Weight and COG verifications • requisitioning of necessary equipment and services • offshore site responsibility for all lifting operations • onshore preservation activities and final documentation 1994 - 1997 Instigation and establishment of Eurotech a.s. to undertake sales, hire and servicing of lifting equipment. The company further developed to undertake Projects amongst which were the following: • • Troll (Subsea ROV tools & riser clamps) • -Sleipner A Mod. project/ SLT • -SCS/Kværner (NE Frigg decommisioning activities • Byford Dolphin (Supply and certification of manrider winches) • Snorre (upgrading of hoisting equipment in well bay area) • Sonsub (overhauling/repair of ROV’s) • Mobilisation and demobilisation of vessels in conjunction with sub-sea ROV operations EPC. Clients: Stolt Comex, Son-sub, Sub-Sea and Halliburton. • Design/manufacture of subsea tools • General design, production, testing and certification of lifting equipment Training courses for riggers and crane operators amongst clients : Kværner,Statoil,Oddfjell,Oceaneering,Son-sub, Hydro, Saga, Can.Wepco, Saipem.
-
-
-
Gmc Maritime AS
-
Stavanger Area, Norway
-
Sales and Service Engineer
-
Jan 1990 - Mar 1994
1993 - 1994 Maritime GMC A/S Engaged by Statoil Inspection Dept (Tekniske Tjenester) at Dusavik Base, where responsibilities were principally to investigate and verify documentation and certification of many various types of equipment to ensure conformance to Rules, Regulations and applicable specifications, including the correct usage of materials. Responsibilities also included the preparation of acceptance and/or deviation reports including all necessary communication to ensure close out. The type of equipment covered by the above, included valves, electrical installations, rotating and lifting equipment. 1990 - 1993 Maritime GMC A/S Project work covering all aspects from Client enquiry to Commissioning and handover. Directly responsible for quotations and evaluation of tenders/conceptual designs. These types of contract mainly consisted of hoisting and lifting arrangements and the utilisation of associated equipment, both manual and motorised. Responsibility further included engineering, inspection, commissioning and final documentation, all according to NPD, NMD and DNV rules. In may 1991 responsible for planning and on site assembly of high pressure riser during well killing on Bombay high oilfield, India. Client: RED ADDAIR / ONGC.
-
-
-
Selmek a/s
-
Sandnessjøen
-
Manager/Owner
-
Jan 1986 - Nov 1989
1986 - 1990 Selmek A/S Manager Overall responsibility for supervision of multi discipline crew undertaking: • detailed engineering, shop drawings • workshop construction. • prefabrication and installation of dock steel structures in conjunction with the construction of "Helgelands brua" and quayside constructions. Client; AKER ENTREPRENØR. Development and eventual patenting of tire washing machine including; engineering, hydraulics, PLS system and computer programming.
-
-
-
Royal Caribbean Group
-
United States
-
Travel Arrangements
-
700 & Above Employee
-
Ships Mechanic
-
Jan 1981 - Aug 1986
General maintenance in engine room involving trouble-shooting and repair work of main-engines e.g. pumps, fuel-systems, valves and pipefitting. 1983-1986 main responsibility for running and maintenance of seven 1000 hp. auxiliary engines, including scheduled renovation. General maintenance in engine room involving trouble-shooting and repair work of main-engines e.g. pumps, fuel-systems, valves and pipefitting. 1983-1986 main responsibility for running and maintenance of seven 1000 hp. auxiliary engines, including scheduled renovation.
-
-
-
Ø.Lorentzen
-
Cargo vessel M/S Nopal Vega US east coust-West affrica
-
Ordinary seaman
-
Jan 1975 - Jan 1976
Regular deckwork duties Regular deckwork duties
-
-
-
Royal Caribbean Group
-
United States
-
Travel Arrangements
-
700 & Above Employee
-
Youngman
-
Jan 1974 - Jul 1975
-
-
-
Det Nordenfjeldske Dampskibsselskab AS
-
Norway
-
Maritime Transportation
-
Deck hand/Youngman
-
Aug 1973 - Mar 1974
-
-