Tom Carroll

Project Engineer at Next Step Energy Solutions
  • Claim this Profile
Contact Information
Location
Arvada, Colorado, United States, US

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Renewables & Environment
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2020 - Present
    • United States
    • Design Services
    • 300 - 400 Employee
    • Electrical Project Engineer
      • Jun 2018 - Jun 2020
    • United States
    • Higher Education
    • 700 & Above Employee
    • Student
      • Aug 2014 - May 2018
    • United Kingdom
    • Construction
    • Project Estimator
      • May 2017 - Aug 2017

      • Analyzed and built proficient estimates for commercial and domestic roofing projects. • Built Excel programs to quickly estimate the quantity of materials and labor needed for projects. • Implemented Excel programs into the estimate procedure to ensure accurate and timely estimates. • Worked closely with field estimators to ensure quality labor and prices. • Analyzed and built proficient estimates for commercial and domestic roofing projects. • Built Excel programs to quickly estimate the quantity of materials and labor needed for projects. • Implemented Excel programs into the estimate procedure to ensure accurate and timely estimates. • Worked closely with field estimators to ensure quality labor and prices.

    • Lab Technician
      • May 2016 - Aug 2016

      • Provided assistance to graduate and Ph.D. students in their research. • Required to have general knowledge of each project’s functionality. • Assisted in-house electrician in installing gas sensor system for labs. • Required well-rounded verbal communication skills. • Provided assistance to graduate and Ph.D. students in their research. • Required to have general knowledge of each project’s functionality. • Assisted in-house electrician in installing gas sensor system for labs. • Required well-rounded verbal communication skills.

    • United States
    • Construction
    • 1 - 100 Employee
    • Construction Laborer
      • May 2015 - Aug 2015

      • Demolished and rebuilt decks, installed windows, and did kitchen remodeling. • Required to work independently and responsible for finishing projects. • Interfaced with clients upon project completion to make sure workmanship met standards. • Gained knowledge of problem solving techniques when faced with building obstacles. • Demolished and rebuilt decks, installed windows, and did kitchen remodeling. • Required to work independently and responsible for finishing projects. • Interfaced with clients upon project completion to make sure workmanship met standards. • Gained knowledge of problem solving techniques when faced with building obstacles.

Education

  • Colorado State University
    2015 - 2018
  • Colorado State University
    Electrical and Electronics Engineering

Community

You need to have a working account to view this content. Click here to join now