Tom Wierenga
Site Superintendent at G&C FAB-CON, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
OSHA
OSHA-Safety-Training.com
Experience
-
G&C FAB-CON, LLC
-
United States
-
Construction
-
1 - 100 Employee
-
Site Superintendent
-
2019 - Present
I am currently constructing a national cemetery in Colorado Springs. I am currently constructing a national cemetery in Colorado Springs.
-
-
-
rand* construction corporation
-
United States
-
Construction
-
200 - 300 Employee
-
Construction Superintendent
-
2016 - 2018
Office remodels in high-rise buildings. Office remodels in high-rise buildings.
-
-
-
Cambridge Companies
-
United States
-
Investment Management
-
1 - 100 Employee
-
Field Manager
-
May 2014 - Dec 2014
Supervised the building of an 18,000 sq ft by 42' tall maintenance and office building; including a wash bay and lube bay.170,000 sq ft of concrete flatwork, most of which was on top of cement stabilized soil. 1100' of 8" water main. Remodel of existing administration offices in another building on site. Supervised the building of an 18,000 sq ft by 42' tall maintenance and office building; including a wash bay and lube bay.170,000 sq ft of concrete flatwork, most of which was on top of cement stabilized soil. 1100' of 8" water main. Remodel of existing administration offices in another building on site.
-
-
-
Fisher Development, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Retail Site Superintendent
-
Feb 2014 - May 2014
Supervised the building of one Lego store in Westfarms Mall, West Hartford, CT. Supervised the installation of an updated style of fixture at the Mock Store, Lego Headquarters, Enfield, CT. Supervised the installation of a booster heating system at the Lego Store in Easton Town Center, Columbus, OH. Supervised the building of one Lego store in Westfarms Mall, West Hartford, CT. Supervised the installation of an updated style of fixture at the Mock Store, Lego Headquarters, Enfield, CT. Supervised the installation of a booster heating system at the Lego Store in Easton Town Center, Columbus, OH.
-
-
-
-
Project Superintendent
-
Sep 2012 - Dec 2013
Ground-up correctional facility in Concordia, KS. Ground-up correctional facility in Concordia, KS.
-
-
-
-
Superintendent
-
Jun 2011 - Sep 2012
During this time of searching for an open position I completed four 1 to 2 1/2 month projects. During this time of searching for an open position I completed four 1 to 2 1/2 month projects.
-
-
-
-
Superintendent
-
Mar 2012 - Jun 2012
Supervised the building of one Lego store in Oak Park Mall, Overland Park, KS and the installation of replacement front doors on the Lego store in The Woodlands Mall, Woodland, TX. Supervised the building of one Lego store in Oak Park Mall, Overland Park, KS and the installation of replacement front doors on the Lego store in The Woodlands Mall, Woodland, TX.
-
-
-
USACE
-
United States
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Construction Representative
-
May 2010 - May 2011
Field Inspector/QA on Structural, MEP, Civil, Environmental, Material, Contract Documents, Code Compliance, and safety. Field Inspector/QA on Structural, MEP, Civil, Environmental, Material, Contract Documents, Code Compliance, and safety.
-
-
-
N/A
-
Wellness and Fitness Services
-
1 - 100 Employee
-
Military Construction Superintendent
-
Aug 2009 - Nov 2009
Completed an 8 month project that was 3 months behind schedule with 2 1/2 months left to the deadline. The project had been abandoned by the previous superintendent. It was completed on time and to the Air Force's satisfaction. Completed an 8 month project that was 3 months behind schedule with 2 1/2 months left to the deadline. The project had been abandoned by the previous superintendent. It was completed on time and to the Air Force's satisfaction.
-
-
-
Comark Building Systems
-
Construction
-
1 - 100 Employee
-
Construction Superintendent
-
Sep 2008 - Aug 2009
$6,000,000 USACE Ft. Carson 14,000 square foot permanent modular Headquarters building. $50,000,000 USACE CAB UEPH ATFP Ft. Bliss Four 3 story modular barracks buildings with collapsible design. 322,552 sq ft. This included 464 2 bedroom apartments plus laundries, utilities, and other supporting rooms. $6,000,000 USACE Ft. Carson 14,000 square foot permanent modular Headquarters building. $50,000,000 USACE CAB UEPH ATFP Ft. Bliss Four 3 story modular barracks buildings with collapsible design. 322,552 sq ft. This included 464 2 bedroom apartments plus laundries, utilities, and other supporting rooms.
-
-
-
-
Construction Superintendent
-
Jan 2008 - Jul 2008
$50,000,000 USACE BRAC 25- 2-story modular barracks, headquarters, and COF buildings. These included laundries, utilities, and other supporting rooms. $50,000,000 USACE BRAC 25- 2-story modular barracks, headquarters, and COF buildings. These included laundries, utilities, and other supporting rooms.
-
-
-
Alexandher Building Co
-
United States
-
Civil Engineering
-
Superintendent
-
Mar 2004 - Aug 2007
I supervised the building of an Indigo Joe’s restaurant in a strip mall that I was building at the same time. I also supervised the building of dental clinics, secure government offices (SCIF), other offices, a coffee shop, and other various projects. I supervised the building of an Indigo Joe’s restaurant in a strip mall that I was building at the same time. I also supervised the building of dental clinics, secure government offices (SCIF), other offices, a coffee shop, and other various projects.
-
-
-
Myler Church Builders
-
United States
-
Graphic Design
-
Project Lead Superintendent
-
Oct 2001 - Jul 2002
Built $8,000,000 church in Indianapolis, IN Built $8,000,000 church in Indianapolis, IN
-
-
Education
-
Drake Technical Center
Certificate of Completion, Carpentry/Carpenter -
Drake Technical Center
Certificate of Completion, Mason/Masonry -
Grace Bible College
-
Calvin Christian High School