Tom Whittle

APAC Director at OWC (an AqualisBraemar company)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Taiwan, TW

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Nick Wordsworth

Tom has strong analytical skills, and is particularly good at cutting through to the key issues in a discussion or problem solving exercise. Tom also adapts to different situations well, as demonstrated by time working alone offshore and taking up challenges to travel at short notice, in both cases delivering more than was expected, with good humour. In short, Tom is an ideal colleague - adaptable and diligent at his work, and fun to work with.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • IT Services and IT Consulting
    • 100 - 200 Employee
    • APAC Director
      • Dec 2020 - Present

    • Country Manager - Taiwan
      • Mar 2019 - Dec 2020

    • Senior Engineer
      • Sep 2016 - Mar 2019

    • Offshore Met Mast Project Manager
      • Jan 2016 - Jul 2016

      Project Manager for two offshore met masts, for two French round 2 projects Project Manager for two offshore met masts, for two French round 2 projects

    • Denmark
    • Oil and Gas
    • 700 & Above Employee
    • Senior Concept and Layout Engineer
      • Jun 2014 - Dec 2015

      Managing the layout and project optimisation of Race Bank through to successful FID. Identifying and implementing project design optimisation levers e.g. optimal layout of the wind farm to reduce wake losses, installed capacity, WTG type, Interlink, overplanting, foundation choice, inter array cable layout and system voltage level. Managing the layout and project optimisation of Race Bank through to successful FID. Identifying and implementing project design optimisation levers e.g. optimal layout of the wind farm to reduce wake losses, installed capacity, WTG type, Interlink, overplanting, foundation choice, inter array cable layout and system voltage level.

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Head of Project Delivery Support
      • May 2013 - Jun 2014

      Lead small team of engineers providing engineering and project management support to offshore wind projects. Lead small team of engineers providing engineering and project management support to offshore wind projects.

    • Project Engineer
      • Jun 2011 - May 2013

      Package Manager (Borkum West II – Phase 1) Array Cables Terminations: Package Manager for the array cable termination and testing works connecting 40 WTGs to OHVS. Responsible for the day to day management of the terminations contractor. Offshore Representative (Borkum West II – Phase 1) Foundation Installation (Jacket and Tripods): Offshore Representative for the installation of Jacket and Tripod Foundations (WTG and Offshore Substation) covering heavy lift, piling and grouting operations. Subsea Cable Protection Package Manager – Thanet Offshore Wind Farm: Managed two large rock protection installation campaigns on the export and inter-array cables (rectification works, post construction). Show less

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Engineer
      • May 2009 - Jun 2011

      - Foundation Design Engineer - Due Diligence Engineer - Foundations - Project Engineer for WTG Installation Concept and Feasibility - Engineer for Claim regarding Free Spanning Array Cables - Project Manager and offshore rep for Geotechnical and Geophysical Surveys - Foundation Design Engineer - Due Diligence Engineer - Foundations - Project Engineer for WTG Installation Concept and Feasibility - Engineer for Claim regarding Free Spanning Array Cables - Project Manager and offshore rep for Geotechnical and Geophysical Surveys

Community

You need to have a working account to view this content. Click here to join now