Toh Jian Ping
Project Engineer at LWH Holdings Pte Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
LWH Holdings Pte Ltd
-
Singapore
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Mar 2022 - Present
Project Title : Tampines HDB N9C10-12 & Park • Block in Charge of 3 residential blocks constructed using Prefabricated Volumetric Construction (PPVC) modules. • Oversee the complete construction lifecycle of block substructure and superstructure, from pilling and foundation to typical storey, with emphasis on safety, time, cost and quality requirements. • Coordination for delivery, sequencing up to actual installation of PPVC modules. • Coordinate and study relevant structural work prior to commencement of construction. • Raise RFI and RFA and send to consultant for review in order to enquire drawings and technical issues. • Prepare formwork and falsework sketches using Autocad before submit for PE designs. Show less
-
-
-
Presscrete Engineering Pte Ltd
-
Singapore
-
Civil Engineering
-
1 - 100 Employee
-
Project Engineer
-
Sep 2021 - Mar 2022
Project Title : Sewer Work at Changi East to Effect Runway Operation – Package 3 • Plan, schedule and monitor the ground improvement and pipe jacking works. • Coordinate with various design and technical departments to resolve any potential discrepancy. • Compilation of daily ground improvement data logger and submit to main contractor. • Oversee the complete construction lifecycle of ground improvement, temporary manhole excavation, pipe jacking to permanent manhole construction. Show less
-
-
-
CHEE KONG
-
Malaysia
-
Mining
-
Internship Trainee
-
Oct 2019 - Dec 2019
internship Project 1: Spa Pool Larkin Aquatics (30 days) • Preparation of SUKMA Johor 2020 with total tonnage of 920kg. • Supervised the manufacturing processes such as cutting, welding, grinding and painting. • Arranged for the delivery of steel members and supervise on-site installation. Internship Project 2: Facade Larkin Aquatics (42 days) • Took over and rearranged the halfway construction progress. • Supervised the welding and painting processes. • Rectified the installation process by amending the wrong coordination of facade. Show less
-
-
Education
-
Universiti Tunku Abdul Rahman (UTAR)
Bachelor of Engineering (Honours) - BE, Civil Engineering