Toby Lai

Graduate Electrical Engineer at Hydrock
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Etchingham, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Design Services
    • 700 & Above Employee
    • Graduate Electrical Engineer
      • Mar 2023 - Present

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Technical Support Engineer
      • Nov 2021 - Mar 2023

      Tasks carried out: • Communication: Liaising with contractors, manufacturers, architects and engineers. • Lighting Calculations: Using DIALux or Relux, provide standard and emergency lighting calculations in a variety of sectors such as residential and offices to ensure the luminaire layout implemented meets lighting regulations. • Lighting Design: Adjust designed luminaire layout when necessary to significantly increase the practicality while maintaining the architects vision. • Organisation: Prepare luminaire take-offs and luminaire schedules to understand quantities and details for all luminaires involved in a project. • Lighting Products: Provide detailed luminaire drawings using AutoCAD with their equivalent datasheets and installation instructions using Adobe InDesign. Show less

    • Professional Services
    • 700 & Above Employee
    • Electrical Engineer Placement Student
      • Jun 2019 - Aug 2019

      Tasks carried out: • Compliance: Assisted the engineering team on the High Speed 2 (HS2) railway system project. • Electrical Schematics: Using AutoCAD, I drew riser diagrams of multiple car parks and train stations. • Interior Modelling: Using SketchUp, I accurately designed the interior layout of buildings, to ensure various electrical equipment fitted through hallways and doorways. Tasks carried out: • Compliance: Assisted the engineering team on the High Speed 2 (HS2) railway system project. • Electrical Schematics: Using AutoCAD, I drew riser diagrams of multiple car parks and train stations. • Interior Modelling: Using SketchUp, I accurately designed the interior layout of buildings, to ensure various electrical equipment fitted through hallways and doorways.

    • United Kingdom
    • Events Services
    • Marquee Erector
      • Jun 2018 - Sep 2018

      Tasks carried out: • Loading and unloading in the warehouse and on site • Erecting and dismantling large marquees • Laying cabling for lighting and other electrical equipment • Maintaining and cleaning tools and equipment Tasks carried out: • Loading and unloading in the warehouse and on site • Erecting and dismantling large marquees • Laying cabling for lighting and other electrical equipment • Maintaining and cleaning tools and equipment

    • United Kingdom
    • Events Services
    • Marquee Erector
      • Jun 2017 - Sep 2017

      Tasks carried out: • Loading and unloading in the warehouse and on site • Erecting and dismantling large marquees • Laying cabling for lighting and other electrical equipment • Maintaining and cleaning tools and equipment Tasks carried out: • Loading and unloading in the warehouse and on site • Erecting and dismantling large marquees • Laying cabling for lighting and other electrical equipment • Maintaining and cleaning tools and equipment

    • United Kingdom
    • Retail
    • 1 - 100 Employee
    • Shop Assistant
      • 2014 - 2016

      Tasks carried out: • Stacking and displaying products • Assisting Customers Tasks carried out: • Stacking and displaying products • Assisting Customers

Education

  • University of Plymouth
    MEng (Hons), Electrical and Electronic Engineering
    2016 - 2021

Community

You need to have a working account to view this content. Click here to join now