Timothy Peavler

Construction Supervisor at Team Fishel
  • Claim this Profile
Contact Information
Location
Orange County, California, United States, US

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Construction
    • 700 & Above Employee
    • Construction Supervisor
      • Jun 2019 - Present

    • United States
    • Construction
    • 100 - 200 Employee
    • Foreman- Underground Dry Utility
      • Nov 2016 - Jun 2019

      •Conduct pre-construction meetings and job walks with City Inspectors for all jobs. Have built strong relationships with cities where jobs are located.•Leading a multi-year project for ECS throughout Orange County, managing all aspects of the project such as supervising a crew, handling material coordination and conducting inspections of upcoming work.•Run 2 to 8 man crews, leading daily safety meetings that are federal, state and OSHA compliant as well as completing and submitting daily time sheets within payroll processing guidelines.•Write work schedules and partner with external QEWs (Qualified Electrical Worker) partners to get No Test Orders scheduled with Edison Switching Center to ensure work is scheduled for crew.•Oversaw full project layout, assembly and installation of duct and vault systems for AT&T, Verizon Business, MCI, Crown Castle and Level 3.

    • United States
    • Construction
    • 1 - 100 Employee
    • Foreman- Underground Communications
      • Nov 2015 - Nov 2016

      •Created asbuilts for Verizon/Frontier Underground Telecomm projects.•Read blueprints and job specifications in order to layout specific jobs and assign tasks to crew.•Oversaw and instructed the setup of traffic control according to local and state requirements.•Trained crew on trenching, placing conduit, rodding and roping, placing or setting various man holes, hand holes, pedestals and cabinets.•Led daily safety meetings, following up and coaching crew to ensure correct safety measures were utilized.•Adjusted various man holes and hand holes to grade.•Placed and pulled in communication cables, copper and fiber optics while ensuring that asphalt and concrete were restored.

    • United States
    • Insurance
    • 1 - 100 Employee
    • Foreman- Underground Communications
      • Sep 2005 - Nov 2015

      •Worked on AT&T Telecommunications Underground in San Bernardino and Riverside Counties.•Became knowledgeable in trenching, placing conduit, rodding and roping, placing or setting various man holes, hand holes, pedestals and cabinets.•Adjusted various man holes and hand holes to grade. •Placed and pulled in communication cables, copper and fiber optics while ensuring that asphalt and concrete were restored.•Setup traffic control according to local and state requirements.•Conducted duct locating and repaired damaged conduits.

Community

You need to have a working account to view this content. Click here to join now