Tihomir Kolev
Passive Fire Consultant at Plus Systems- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Bulgarian -
Topline Score
Bio
Credentials
-
BRE/DHF Fire Door Inspection training course
BREFeb, 2020- Sep, 2024 -
DBS certificate
DBS -
Firas accredited installer
- -
White card
Blue Dog Training - RTO 31193
Experience
-
Plus Systems
-
Portugal
-
IT Services and IT Consulting
-
Passive Fire Consultant
-
May 2022 - Present
-
-
-
T&K Interiors Ltd
-
Consumer Services
-
Managing Director
-
Jan 2015 - May 2022
Managing a privately run business. The multi-trade company specialists in passive fire protection, dry-lining, suspended ceilings, structural steel protection, fire and acoustic cavity barriers, air sealing and thermal insulation. Managing a privately run business. The multi-trade company specialists in passive fire protection, dry-lining, suspended ceilings, structural steel protection, fire and acoustic cavity barriers, air sealing and thermal insulation.
-
-
-
-
Project Fire Surveyor
-
Jan 2019 - Jul 2020
-
-
-
-
Passive Fire protection Installer/Supervisor
-
2015 - May 2017
Installation of thermal insulation, fire barriers, curtains and encasements, as well as passive fire protection systems. Air sealing, acoustic barriers and cavity works. Structural steel protection. Fixing of board systems and Soffit insulation. Application of intumescent paints and varnishes. Supervising site activities and checking the quality of the undergoing work. Monitoring and ensuring that all activities comply with the legal requirements, the construction and the Health & Safety regulations, as well as the specific project or site prerequisites. Show less
-
-
-
Empire building systems ltd
-
Construction
-
1 - 100 Employee
-
Passive fire protection installer/Supervisor
-
2014 - 2015
Installation of thermal insulation, fire barriers, curtains and encasements, as well as passive fire protection systems. Air sealing, acoustic barriers and cavity works. Structural steel protection. Fixing of board systems and Soffit insulation. Application of intumescent paints and varnishes. Supervising site activities and checking the quality of the undergoing work. Monitoring and ensuring that all activities comply with the legal requirements, the construction and the Health & Safety regulations, as well as the specific project or site prerequisites. Show less
-
-
-
Exeed fire protection ltd
-
United Kingdom
-
Construction
-
Passive fire protection installer/Supervisor
-
2013 - 2014
Installation of thermal insulation, fire barriers, curtains and encasements, as well as passive fire protection systems. Air sealing, acoustic barriers and cavity works. Structural steel protection. Fixing of board systems and Soffit insulation. Application of intumescent paints and varnishes. Supervising site activities and checking the quality of the undergoing work. Monitoring and ensuring that all activities comply with the legal requirements, the construction and the Health & Safety regulations, as well as the specific project or site prerequisites. Show less
-
-
-
-
Passive fire protection installer
-
2008 - 2013
Installation of thermal insulation, fire barriers, curtains and encasements, as well as passive fire protection systems. Air sealing, acoustic barriers and cavity works. Structural steel protection. Fixing of board systems and Soffit insulation. Application of intumescent paints and varnishes. Installation of thermal insulation, fire barriers, curtains and encasements, as well as passive fire protection systems. Air sealing, acoustic barriers and cavity works. Structural steel protection. Fixing of board systems and Soffit insulation. Application of intumescent paints and varnishes.
-
-
-
-
Dry liner / Ceiling fixer
-
2003 - 2008
Duties involved: Various plasterboard/metal works, including building of internal walls, suspended ceilings and partitions. Interpretation of architecture and construction drawings and projects. Complying with Health & Safety requirements and site’s regulations at all times. Duties involved: Various plasterboard/metal works, including building of internal walls, suspended ceilings and partitions. Interpretation of architecture and construction drawings and projects. Complying with Health & Safety requirements and site’s regulations at all times.
-
-
Education
-
BTEC in Construction Award level 3, The College of North East London
Level 3, Construction Management -
Asbestos Awareness Training
-
Machine Sciences College, Bulgaria. Major: Digitally Programmed Machines.
Major in “Digitally Programmed Machines” -
Hilti DX/GX Training
-
LUCAS card certificate
-
NVQ Level 2 - Passive Fire Protection (QCF)
-
PASMA Tower Training
-
Emergency First Aid Certificate
-
NVQ Level 2 - Interior Systems, Dry Lining, Suspended Ceiling Fixing.
-
IPAF 3a&3b
-
Working at heights certificates
-
Australian consolidated training