Thomas Grosberg

Project Manager at Echosens
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Paris Metropolitan Region, FR
Languages
  • Français -
  • Anglais -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certificat Informatique et Internet niveau 1
    Ministère de l'Enseignement Supérieur et de la Recherche (France)

Experience

    • France
    • Medical Device
    • 100 - 200 Employee
    • Project Manager
      • Mar 2023 - Present

    • France
    • Medical Equipment Manufacturing
    • 700 & Above Employee
    • R&D Project Manager
      • Oct 2019 - Feb 2023

    • France
    • Architecture and Planning
    • Project Manager
      • Aug 2018 - Apr 2019

      1. Manufacturing and installation on site of 4 silencers at 2 industrial sites in Belgium 1.1. Initial intervention 1.1.1. Visit on customer site for measurement 1.1.2. Sourcing and management of suppliers 1.1.3. Schedule Management 1.1.4. Budget management 1.1.5. Production monitoring (silencer, supplier-related products) 1.1.6. Writing monthly progress reports for management 1.1.7. Supervision of the assembly team on customer sites 1.1.8. Writing technical files 1.1.9. Management of on-site hazards 1.1.10. On-site control and validation with the client 1.2. Management of non-conformities: Acoustic insulation to respect the acoustic performances on the 4 silencers 1.2.1. Prospecting of intervention team for insulation on site 1.2.2. Supervision of the insulation team on the 2 client sites 1.2.3. Management of exceptional access on site 1.2.4. Purchase of insulation material (rock wool, insulation board, bolts) 1.2.5. Crane rental 2. Manufacture of 2 acoustic enclosures for the insulation of gas turbines 2.1.1. Writing of calculation notes 2.1.2. Sizing explosion-proof hatches 2.1.3. Screw dimensioning for cladding 2.1.4. Supervision of the design office 2.1.5. Summary of customer returns 2.1.6. CAD technicians supervision 2.1.7. Validation of technical choices 2.1.8. Checking of 2D draing 2.1.9. Management of deliverables 2.1.10. Management of suppliers 2.1.11. Prospecting for quotation and negotiation 2.1.12. Order placement 2.1.13. Production monitoring 2.1.14. Scheduling Show less

    • Nuclear Electric Power Generation
    • 700 & Above Employee
    • Mechanical Project Engineer
      • Jan 2018 - Jun 2018

      Optimization of the leak test method of primary vapor generators by helium injection 1.1. Initial circuit 1.1.1. Performance measurement 1.1.2. Inventory of the material 1.1.3. Determining areas of critical improvement 1.2. Definition of a new optimized airflow circuit 1.2.1. P & ID 1.2.2. Calculation of flow, volume, pressure losses 1.2.3. 3D design of a helium-tight distribution feeder 1.2.4. STAUBLI supplier's consultation for connection and fluid transport hoses (air, helium) 1.2.5. Feasibility study 1.2.6. Definition of the updated process protocol 2. Technical environment: 2.1. Autodesk Inventor 2.2. Technical English 2.3. Boilerwork 2.4. Fluid mechanics 2.5. MS Office 2.6. ASME Show less

    • France
    • Electric Power Generation
    • 700 & Above Employee
    • Technical Project Coordinator
      • Feb 2017 - Dec 2017

      1. Support to the Studies management department to monitor the technical modifications of the Nuclear plant EPR FA3 1.1. Keeping the change tracking file up to date 1.1.1. Data entry 1.1.2. Update of the state of progress 1.1.3. Update of progress and performance indicators 1.1.4. Improvement of indicators 1.2. Administrative management of the Study Committee Modifications 1.2.1. Constitution of the agenda 1.2.2. Recovery of documents for presentation to the committee 1.2.3. Verification of the coherence of information 1.2.4. Taking notes and writing a report 1.2.5. Update of the chart of follow-up of the modifications following the decisions taken in CEM 1.2.6. Change presentation schedule 1.3. PLM Tool Manager 1.3.1. Granting user permissions 1.3.2. Software upgrade to simplify use 1.3.3. Approver of modifications in the digital validation circuit 1.3.4. Writing a complete user manual 2. Technical environment: 2.1. MS Office 2.2. PLM Show less

    • France
    • Nuclear Electric Power Generation
    • 700 & Above Employee
    • Junior Project Engineer
      • Aug 2016 - Oct 2016

      Engineering internship of 3 months at AREVA NP Subject: Technical follow-up on UK EPR Hinkley Point C (HPC) Regularization of the technical databases Engineering internship of 3 months at AREVA NP Subject: Technical follow-up on UK EPR Hinkley Point C (HPC) Regularization of the technical databases

    • Research Services
    • 700 & Above Employee
    • Research Engineer
      • Feb 2016 - Jun 2016

      Research internship of 5 months at Imperial College Subject: Modelling and control of human-machine interaction for stroke patients during locomotion with assistive robots Research internship of 5 months at Imperial College Subject: Modelling and control of human-machine interaction for stroke patients during locomotion with assistive robots

    • Mechanical Engineer
      • Oct 2014 - Feb 2015

      Instrumentation of an OdrA Brace for osteo-arthritis fo the knee. Design of the brace with a CAD/CAM Software. Literature review of existing sensors configuration to acquire numerical data from patients. Design of an S-Shaped sensor with pressure cells to get numerical date while efforts are applied to the brace with an active patient. Finite Elements Modelisation of the sensor to study its resilience under pressure. Manufacturing of the sensor on CNC. Instrumentation of an OdrA Brace for osteo-arthritis fo the knee. Design of the brace with a CAD/CAM Software. Literature review of existing sensors configuration to acquire numerical data from patients. Design of an S-Shaped sensor with pressure cells to get numerical date while efforts are applied to the brace with an active patient. Finite Elements Modelisation of the sensor to study its resilience under pressure. Manufacturing of the sensor on CNC.

    • Technicien
      • Apr 2013 - Jun 2013

      Proposition pour optimisation du taux de rendement synthétique d'une grenailleuse Rédaction de fiches de postes pour les machines de l'usine Proposition pour optimisation du taux de rendement synthétique d'une grenailleuse Rédaction de fiches de postes pour les machines de l'usine

Education

  • Ecole nationale supérieure d'Arts et Métiers / ENSAM
    Engineer's degree, Ingénierie mécanique
    2013 - 2016
  • Université Paris Descartes
    Master BME BioMECH, Bio-ingénierie et ingénierie biomédicale
    2015 - 2016
  • IUT Ville d'avray
    Diplôme universitaire de Technologie, Ingénierie mécanique
    2011 - 2013
  • Glyndŵr University
    HNC Mechanical Engineering, Ingénierie mécanique
    2012 - 2013

Community

You need to have a working account to view this content. Click here to join now