Thomas FOUGNIE

Operations Manager - Mobile Water Services at Veolia Water Technologies Asia Pacific
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AU
Languages
  • Français Native or bilingual proficiency
  • Anglais Professional working proficiency
  • Allemand Elementary proficiency
  • Espagnol Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Operations Manager - Mobile Water Services
      • Mar 2023 - Present

      • Develop an MWS (Mobile Water Services) Asset management plan for all MWS assets, including refurbishment of assets, condition monitoring of assets, storage and handling, logistics, spare parts and consumable management, ensuring all assets are ‘ready for deployment’ with a 48hr window.• Provide Project management, Service (including commissioning / decommissioning), Engineering and Operational support, for all deployed assets to customer sites, working closely with customers ensuring the installation of assets is aligned with VWT’s installation requirements, process requirements and customer expectations. • Project Manage the procurement and local build of new approved Capex’d assets, through to FAT testing of all completed assets, where applicable and facilities allow.• Preparation of the Operational MWS budgets, during the quotation phase, working in alignment with the MWS BD Manager on all submissions. • Provide assistance to the MWS BD Manager in the correct selection of assets, prior to a full process engineering review being initiated, including any technical support material that will be required. • Maintain an asset specific register and database, with all technical information associated with each asset that may be used during the quotation phase or operational phases. • Review technical and operational aspects of all quotations prepared for MWS services, prior to presenting quotations to customers.• Project Manage the procurement and local build / assembly of new approved Capex’d assets, drawings review v local regulations and requirements, through to FAT testing of all completed assets. • Maintaining necessary contact with customers, suppliers, industry associates and government representatives to achieve the MWS service and deployment objectives of the business.• Ensuring all activities comply with company HSE requirements and relevant acts, legal documents and ethical standards. Show less

    • Service Support Engineer
      • Aug 2021 - Mar 2023

      • Provide planned maintenance and breakdown maintenance for all customers in NSW & the Recycling Water Treatment Plants of Darling Quarter (Sydney) & Bingara (Wollongong) through MMBR, MBR, RO, UV, chlorination systems…• Install & commission new equipment - Mobile Water Services (Actiflo, MMF, RO, Sea Water RO, UF, Ion-Exchange, UV, MBR, MBBR, Softener, chlorination skid…) • Provide direct support/training to all service personnel operation and customers.• Provide technical/process support & expertise to MWS and NSW Services (process, mechanical, electrical, chemical & hydraulic).• Lead new projects (budget, design) to improve water treatment systems.• Identify & create new business opportunities for VWT when servicing customers• Manage operators work (task, schedule, work orders).• Achieve Budget revenue and margin targets, as per XRT Reports (Team KPI).• Provide BFQ/Budget operations - Assets Mobilisation, Commissioning, Operations, parts, chemicals and Consumables. Show less

    • Environmental Services
    • 700 & Above Employee
    • Process Optimisation Engineer
      • Nov 2019 - Aug 2021

      • Provide technical and engineering support to the commissioning and operations teams.• Ensure effective and optimal operation of equipment to achieve maximum efficiency.• Diagnosing malfunctions in chemical processes and instituting remedial action.• Studying product utilisation and pollution control.• Planning and implementing laboratory operations to fulfil production cost and performance standards.Duties & Responsibilities:=> Commissioning:• To ensure the safe testing and commissioning of completed installations to achieve the necessary plant. performance in accordance with the project program requirements.• To prepare and produce test and commissioning documentation.• Report progress and record test results.• Identify problems and shortcomings with existing systems.=> Operations:• Assessment of operational performance and optimisation.• Management of optimisation projects including chemical and power savings.• Technical support in the development of engineering solutions.• Management and analysis of data for reporting.• Provide out of hours support.• Collation of operational and technical data for various reports.• Assist in the development and presentation of reports and budgets.• Collation of operational cost models.• Assisting with projects to deliver operational safety, environmental and compliance initiatives. Show less

    • Commissioning Engineer
      • Apr 2019 - Nov 2019

      ● Support Shift Operation Team during Commissioning● Ensure Transfer of informations to Operation Team● Perform Commissioning Activities (24/7 coverage)● Worklot Preparation● Preparation of Energisation Notices● Other duties as required

    • France
    • Environmental Services
    • 700 & Above Employee
    • Technical Sales Engineer | Industrial Water Treatment
      • May 2014 - Apr 2019

      Industrial Water Treatment Solutions – 500 Employees - Sales revenue: 150 000 000 AUD Maintaining customer portfolio in my area (Franche-Comté, Alsace and Swiss) - (920 000 AUD per year) Developing the business : prospecting (63 000 AUD per year), costing new solutions. Analyzing and monitoring the water quality of industries (recommendations, improvements, advice). Chemicals conditioners of water (HYDREX range): cooling towers, steam and hot water boilers, purification plants, cooling pipes and sanitary hot water networks. Ciphering and sizing water equipment: Salt electrolyze, Automated cooling water chemicals dosing system, dosing pumps, softener, osmoseur. Joining the program: Veolia Force (Emergency Humanitarian Mission). Show less

    • France
    • Government Administration
    • 700 & Above Employee
    • Apprentice Engineer | Sanitation department
      • Nov 2010 - Nov 2013

      Public & General Administration – 8 600 Employees Modeled the sewerage network of the city of Lingolsheim (20 000 citizens) and its surroundings (End of Studies Work – 6 months). Restored wastewater treatment plant in Plobsheim (3 500 Population Equivalent): sizing, French public market, analysis offers, negotiation. Sizing and diagnosis studies of sewerage networks. Mapping sanitation network (GIS). Public & General Administration – 8 600 Employees Modeled the sewerage network of the city of Lingolsheim (20 000 citizens) and its surroundings (End of Studies Work – 6 months). Restored wastewater treatment plant in Plobsheim (3 500 Population Equivalent): sizing, French public market, analysis offers, negotiation. Sizing and diagnosis studies of sewerage networks. Mapping sanitation network (GIS).

    • Luxembourg
    • Research Services
    • 1 - 100 Employee
    • Research internship | Hydraulic modeling
      • Jul 2012 - Aug 2012

      Environmental, Health, materials technologies – 200 Employees - Sales revenue: 26 500 000 AUD Modeled the drinking water network of the town of Junglinster (6 000 citizens) under EPANET software for the implementation of an algorithm to regulate the level in reservoirs in real time. Environmental, Health, materials technologies – 200 Employees - Sales revenue: 26 500 000 AUD Modeled the drinking water network of the town of Junglinster (6 000 citizens) under EPANET software for the implementation of an algorithm to regulate the level in reservoirs in real time.

    • France
    • Environmental Services
    • 700 & Above Employee
    • Apprentice Technician GIS | Studies Department
      • Sep 2009 - Sep 2010

      Water catchment, treatment and supply – 200 Employees - Sales revenue: 47 100 000 AUD Realization of a renewal plan for water supply pipes in Saint-Vit (5 000 citizens). Investigation of leaks by acoustic correlation, installation of equipment in a decarbonation plant, realization of test plans and water purification stations. Water catchment, treatment and supply – 200 Employees - Sales revenue: 47 100 000 AUD Realization of a renewal plan for water supply pipes in Saint-Vit (5 000 citizens). Investigation of leaks by acoustic correlation, installation of equipment in a decarbonation plant, realization of test plans and water purification stations.

  • PERSONENI COMPANY
    • 25 Frambouhans - FRANCE
    • Internship Technician | Public works and civil engineering studies
      • Oct 2008 - Dec 2008

      Public works, civil engineering and construction – 100 Employees - Sales revenue: 8 900 000 AUD Site monitoring, construction and installation of prefabricated walls. Study and realization of a lamellar decanter for a potabilization plant. Public works, civil engineering and construction – 100 Employees - Sales revenue: 8 900 000 AUD Site monitoring, construction and installation of prefabricated walls. Study and realization of a lamellar decanter for a potabilization plant.

    • Maintenance Agent
      • Jul 2008 - Aug 2008

      Masonry, plumbing & Electricity Masonry, plumbing & Electricity

Education

  • ENGINEERING SCHOOL IN WATER AND ENVIRONMENT | ENGEES | 67 Strasbourg - FRANCE
    Master/Engineering degree by apprenticeship
    2010 - 2013
  • AVANCED DIPLOMA MANAGEMENT AND CONTROL OF WATER (B.T.S.) | ENIL | 25 Mamirolle – FRANCE
    Avanced diploma of technician, option EPAHUA (Etudes des Projets d’Aménagements Hydrauliques Urbains et Agricoles)
    2009 - 2010
  • AVANCED DIPLOMA MANAGEMENT AND CONTROL OF WATER (B.T.S.) | ENIL | 25 Mamirolle – FRANCE
    Avanced diploma of technician, option GSEA (Gestion des Services d’Eau et d’Assainissement)
    2007 - 2009
  • HIGH SCHOOL | LEGTA | 70 Vesoul – FRANCE
    Scientific high school certificate
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now