Thomas Ducarouge

Engineering And Maintenance Manager at CAMPARI FRANCE
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Paris Metropolitan Region, FR
Languages
  • French Native or bilingual proficiency
  • English Professional working proficiency
  • German Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Beverage Manufacturing
    • 1 - 100 Employee
    • Engineering And Maintenance Manager
      • Apr 2023 - Present

      Engineering: On a capacity increase project: - implementation of project structure - workshop layout design - project management (Specifications / technical alignement / Study / FAT / SAT / Startup) Maintenance: - management of a team of 5 techniciens - organisation of weekly meeting - collaboration with peers through small projects / task forces to improve ways of working / processes / lines' efficiency

    • Industrial projects' and engineering manager
      • Oct 2022 - Mar 2023

      On a capacity increase project: - implementation of project structure - workshop layout design - peoject management (Specifications / technical alignement / Study / FAT / SAT / Startup)

    • France
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Engineering Project Manager
      • Apr 2022 - Sep 2022

      Follow-up of several projects for central engineering department: - 2 innovation projects (exploration phase) on redesigning machines, to increase performance, speed and capacity while reducing footprint and having a frugal approach to reduce CAPEX needs - 1 capitalisation project - 1 capacity increase project (exploration phase)

    • Engineering Project Manager
      • May 2021 - Apr 2022

      Assignment to support the integration of our new site (manufacturing vegan products) within group processes as well as improvement of building & people flows: - Environment regulation compliance upgrade (French I.C.P.E.): utility room, boiler room, waste water pre-treatment plant; - Coordinated changing room renovation (from design to implementation) and new parking basic design, including layout approval by factory & corporate teams) - Budget preparation & management

    • Engineering Project Manager
      • Nov 2020 - Apr 2021

      Follow-up of several projects on one of the production sites, from study to start-up/commissioning/closing: - replacement of a pasteurizer - installation of a micro water treatment plant (to treat black water separately) - sludge dewatering/thickening: replacement of a draining table - start-up of a new line for a new product (in collaboration with R&D)

    • Engineering project manager
      • Sep 2019 - Oct 2020

      On a Greenfield project: - wrote specifications of new equipment - followed machines' building, FAT and installation for a packaging workshop (waxing machine, vision control, wrapping machine, netting machine, tray former, lidder...) - coordinated the qualification of the whole manufacturing line (from process to packaging) On a comanufacturing site: - wrote specifications of new equipment for vision control, weight control & palettisation - followed equiment's building, FAT… Show more On a Greenfield project: - wrote specifications of new equipment - followed machines' building, FAT and installation for a packaging workshop (waxing machine, vision control, wrapping machine, netting machine, tray former, lidder...) - coordinated the qualification of the whole manufacturing line (from process to packaging) On a comanufacturing site: - wrote specifications of new equipment for vision control, weight control & palettisation - followed equiment's building, FAT and installation - followed equipment qualification and startup Equipment might be seen in the video below.

    • Engineering junior project manager
      • Dec 2017 - Aug 2019

      Early stage of a Greenfield project: - wrote the specifications of new equipment - planned & followed the manufacturing, installation and qualification of new equipment in a new factory In addition, lead of an innovation project to design a new machine (faster, with more flexibility, and smaller footprint)

    • "Vertical Startup"​ stream leader (V.I.E. contract)
      • Dec 2016 - Nov 2017

      On a Brownfield project: - planned the tasks to do by the team during the “startup” phase; - planned and coordinated the transfer of some machines; - planned the equipment’s pre-qualification (FAT) & qualification (SAT)

    • "Vertical Startup" stream leader
      • Apr 2016 - Nov 2016

      On a Brownfield project: - plan the tasks to do by the team during the “startup” phase; - organise the validation of the detail design (from project team & at group level); - plan and coordinate the transfer of some machines; - plan the equipment’s pre-qualification (FAT) & qualification (SAT)

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Project Manager
      • Aug 2015 - Dec 2015

      - recruited students with needed specific skills - managed a team of 10 students - communicated with sponsors - recruited students with needed specific skills - managed a team of 10 students - communicated with sponsors

    • France
    • Financial Services
    • 700 & Above Employee
    • Junior Auditor
      • Feb 2015 - Jul 2015

      Statutory audits: - audited social accounts for SMB and associations (fixed assets, treasury, suppliers audit cycles); - audited consolidated accounts (control of social data, and intra-group eliminations) Chartered accounting: - took part in the creation of consolidated accounts. Statutory audits: - audited social accounts for SMB and associations (fixed assets, treasury, suppliers audit cycles); - audited consolidated accounts (control of social data, and intra-group eliminations) Chartered accounting: - took part in the creation of consolidated accounts.

    • France
    • Aviation & Aerospace
    • 1 - 100 Employee
    • Engineer Assistant in an aluminum smelting plant
      • May 2014 - Aug 2014

      - wrote fabrication scheme and general procedures for sand foundry; - created a database to list all coolants used in the workshop. - wrote fabrication scheme and general procedures for sand foundry; - created a database to list all coolants used in the workshop.

  • EDELI
    • Région de Clermont-Ferrand, France
    • Treasurer
      • Sep 2012 - Dec 2013

      As a treasurer: - made accounting; - made statements for several organisms; - drew up some quotes; - made payslip. As a member of the company: - introduced to CATIA (a CAD software); - modeled some mechanisms As a treasurer: - made accounting; - made statements for several organisms; - drew up some quotes; - made payslip. As a member of the company: - introduced to CATIA (a CAD software); - modeled some mechanisms

    • Sweden
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Worker
      • Jun 2013 - Aug 2013

      - threaded and adjusted for special ball bearings reserved for aircrafts; - turned on a numerical lathe. - threaded and adjusted for special ball bearings reserved for aircrafts; - turned on a numerical lathe.

    • France
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Worker
      • Aug 2010 - Aug 2010

      - been trained on a packaging machine for boxes of portions; - sampled cheese boxes addressed to the laboratory for quality checks. - been trained on a packaging machine for boxes of portions; - sampled cheese boxes addressed to the laboratory for quality checks.

Education

  • Institut français de Mécanique avancée
    Engineer's degree, Ingénierie mécanique
    2012 - 2016
  • Norges teknisk-naturvitenskapelige universitet (NTNU)
    Engineer's degree, Mechanical Engineering
    2015 - 2015
  • Ecole supérieure de Commerce de Clermont-Ferrand
    Master's degree, Business Administration and Management, General
    2014 - 2015
  • Lycée Victor Hugo, Besançon
    Scientific Preparatory School, College/University Preparatory and Advanced High School/Secondary Diploma Program
    2010 - 2012
  • Collège Sainte-Marie

Community

You need to have a working account to view this content. Click here to join now