Thomas Deviese

Deputy tunnel manager at Dragages Hong Kong Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
France, FR
Languages
  • Français Native or bilingual proficiency
  • English Full professional proficiency
  • Russian Limited working proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Hong Kong
    • Construction
    • 400 - 500 Employee
    • Deputy tunnel manager
      • Dec 2020 - Present

      Project trunk road T2 Project trunk road T2

    • France
    • Construction
    • 700 & Above Employee
    • Directeur travaux tunnel
      • Jan 2018 - Dec 2020

      Prolongement Ligne 14 Lot GC03 du Grand Paris :Directeur travaux tunnel sur le lot 3 du prolongement de la ligne 14 jusqu'à Orly. 4 087ml de creusement avec un tunnelier pression de terre Herrenknecht.

    • Ingénieur travaux / méthodes
      • Jan 2017 - Jan 2018

      Ingénieur étude de prix sur les appels d'offre du Grand Paris.

    • France
    • Construction
    • 700 & Above Employee
    • Civil works supervisor
      • May 2014 - Nov 2016

      Construction supervision of four LNG Storage tanks (160 000m3 per tank). First LNG tanks build on permafrost soils. Slipform construction method used for the walls.

    • Section engineer
      • Sep 2012 - May 2014

      - Concourse tunnel, platforms tunnels and cross passages construction for the future station (Shotcrete Lining Methodology). Steel fixing for the cross passages and the chambers.- In charge of the safety, the production, the quality and the survey in a shift of 18 miners and 4 engineers.- Control and adaptation of the method of construction depending on the settlements on the surface. Coordination and monitoring of the subcontractors, respect of the planning.- Working with the design office for the temporary and permanent works modifications. Show less

    • Pit boss (Foreman)
      • Aug 2011 - Aug 2012

      - Construction of a 3,9 km tunnel, seven days a week. Earth pressure / hard rock tunnel boring machine. - Management and training of a team of 20 miners, optimisation of the production and the safety, respect of the quality. - Interpretation and adaptation of the digging parameters in terms of the geology. - Installation works (conveyer belt civil works, earthworks, drainage system). - Work method statements redaction.

    • Pit boss (foreman)
      • May 2010 - Jul 2011

      - Construction of a 1,3 km tunnel under the Rhône with a slurry TBM. - Management and training of a team of 16 miners (tunnel, surface, slurry treatment plant, batching plant). - Hyperbaric works: hyperbaric interventions up to 3,5 bars. - Pouring of 10 000m3 of concrete in tunnel. - Tunnel installation works (civil works of the batching plant and the slurry treatment plant). - Excavation of the shaft and construction of the last slab. - Tunnel works methods statements and experience feedback redaction. Show less

Education

  • HEI - Hautes Etudes d'Ingénieur
    Master 2, Civil Engineering
    2005 - 2010
  • Technical University of Budapest
    Civil Engineering
    2008 - 2009

Community

You need to have a working account to view this content. Click here to join now