Thomas Deviese
Deputy tunnel manager at Dragages Hong Kong Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Français Native or bilingual proficiency
-
English Full professional proficiency
-
Russian Limited working proficiency
-
German Limited working proficiency
Topline Score
Bio
Experience
-
Dragages Hong Kong Limited
-
Hong Kong
-
Construction
-
400 - 500 Employee
-
Deputy tunnel manager
-
Dec 2020 - Present
Project trunk road T2 Project trunk road T2
-
-
-
RAZEL-BEC
-
France
-
Construction
-
700 & Above Employee
-
Directeur travaux tunnel
-
Jan 2018 - Dec 2020
Prolongement Ligne 14 Lot GC03 du Grand Paris :Directeur travaux tunnel sur le lot 3 du prolongement de la ligne 14 jusqu'à Orly. 4 087ml de creusement avec un tunnelier pression de terre Herrenknecht.
-
-
Ingénieur travaux / méthodes
-
Jan 2017 - Jan 2018
Ingénieur étude de prix sur les appels d'offre du Grand Paris.
-
-
-
VINCI Construction Grands Projets
-
France
-
Construction
-
700 & Above Employee
-
Civil works supervisor
-
May 2014 - Nov 2016
Construction supervision of four LNG Storage tanks (160 000m3 per tank). First LNG tanks build on permafrost soils. Slipform construction method used for the walls.
-
-
Section engineer
-
Sep 2012 - May 2014
- Concourse tunnel, platforms tunnels and cross passages construction for the future station (Shotcrete Lining Methodology). Steel fixing for the cross passages and the chambers.- In charge of the safety, the production, the quality and the survey in a shift of 18 miners and 4 engineers.- Control and adaptation of the method of construction depending on the settlements on the surface. Coordination and monitoring of the subcontractors, respect of the planning.- Working with the design office for the temporary and permanent works modifications. Show less
-
-
-
-
Pit boss (Foreman)
-
Aug 2011 - Aug 2012
- Construction of a 3,9 km tunnel, seven days a week. Earth pressure / hard rock tunnel boring machine. - Management and training of a team of 20 miners, optimisation of the production and the safety, respect of the quality. - Interpretation and adaptation of the digging parameters in terms of the geology. - Installation works (conveyer belt civil works, earthworks, drainage system). - Work method statements redaction.
-
-
Pit boss (foreman)
-
May 2010 - Jul 2011
- Construction of a 1,3 km tunnel under the Rhône with a slurry TBM. - Management and training of a team of 16 miners (tunnel, surface, slurry treatment plant, batching plant). - Hyperbaric works: hyperbaric interventions up to 3,5 bars. - Pouring of 10 000m3 of concrete in tunnel. - Tunnel installation works (civil works of the batching plant and the slurry treatment plant). - Excavation of the shaft and construction of the last slab. - Tunnel works methods statements and experience feedback redaction. Show less
-
-
Education
-
HEI - Hautes Etudes d'Ingénieur
Master 2, Civil Engineering -
Technical University of Budapest
Civil Engineering